The Tumwater Tree Board met Nov. 9, 2026 to review progress on the Urban Forestry Management Plan, including recent work at the Davis‑Meeker (Meeker) Geary Oak, grant‑funded monitoring and planting programs, pest preparedness, and a staff proposal to allocate removed Meeker oak wood by lottery (motion approved). Staff reported planting totals, training and code‑update work and outlined next steps for council briefings.
Discussion Points
•Board debated prioritizing public uses, first‑come options and lotteries for remaining pieces.
•Civic Spark Fellow hired to support climate element outreach; staffing additions anticipated.
•Contractors and consulting arborist completed root‑zone work at the Davis‑Meeker Geary Oak.
•Department of Archaeology and Historic Preservation issued a permit to prune the tree.
•Hands‑on staff training conducted with state partners to improve field detection.
•Lessons from neighbor‑canopy pilot (97 homes visited, 4 opted in) and proposed communication improvements.
•Many applicants requested large pieces; staff proposed a points‑based scoring system.
•Mediterranean oak borer recently detected in Willamette Valley; behavior uncertain.
•Pruning scheduled for Nov. 17; one‑day road closure expected.
•Regional trapping and monitoring underway; Tumwater hosts at least one trap.
•River Network grant deliverables: sensors, position, neighborhood canopy program.
•Staff ordered approximately 1,400 seedlings and plans a large planting with high‑school volunteers.
•Tree inventory paused due to limited staff capacity.
•Tribal outreach was done; no tribal responses received to date.
•Tumwater retained Tree City USA accreditation and achieved Evergreen Community Tier Two status.
Decisions
•Approved lottery and batch pickup process for Meeker oak wood; staff to implement and report back.
Directions
•Maintain traps and coordinate regional reporting with county/neighboring jurisdictions; continue staff trainings.
•Staff to coordinate planting logistics with schools and volunteers; consider mailing notice before door‑knocking next year.
•Staff to finalize logistics and chipping/storage plan for pruning day and notify operations/council if needed.
•Staff to present implementation work plan and sustainability division tasks to council in January.
•Staff to redact applicant personal information before sharing and to coordinate pickup dates/logistics with operations crew.
The Lake neighborhood board met in November to review the 2026 work plan, discuss contractor performance and billing for aquatic treatments, approve a volunteer subcommittee to update the lake management (IVAMP) plan instead of hiring a $17,000 consultant, set 2027 meeting dates, and review water-quality monitoring results. City staff and residents discussed issuing an RFP for next season.
Discussion Points
•Agreement on tentative dates to avoid holidays and improve attendance.
•AquaTechnics performed a pre-treatment survey but reportedly did not do chemical treatments this season.
•Board added ten monitoring sites and will evaluate whether additional or different sampling is required.
•Communication with the contractor and its technician (Scott) was inconsistent; the board received an auto-reply and mixed follow-up messages.
•Discussion on member representation and recruiting younger participants.
•Members discussed timeline and who to include on the subcommittee and emphasized cost savings and local expertise.
•No formal roll-call recorded for officer elections in the transcript.
•No payment has been made for treatment; an invoice for survey work (~$4,300) is under review.
•Potential to issue updated solicitation earlier to attract more bidders.
•Procurement options (RFP vs RFQ) and rationale for splitting plan writing from treatment services.
•Staff presented rainfall and temperature trends and water-quality results; many nutrient samples were non-detects.
•Staff proposed volunteers update the IVAMP rather than hiring a consultant.
•Staff to compare results with tribal partners and include survey info in the annual report.
•Staff to use both formal publication and targeted outreach to known vendors.
•Staff will verify whether an amendment suffices under Department of Ecology rules.
Decisions
•No change to sampling program yet; data will guide any future changes.
•No immediate payment; investigate with contractor and city finance.
•Proceed with revising the solicitation and prepare for an earlier issuance.
•Subcommittee formation approved by voice vote.
•Tentative schedule approved by consensus; member accepted vice-presidency conditionally.
Directions
•Aim to issue solicitation earlier than previous year and review proposals in March.
•Board will ensure documentation requirements are included in the next solicitation.
•Board will withhold payment until evidence of work is provided and will route billing questions through city finance.
•Continue periodic sampling and review data across expanded sites.
•Finalize dates and include in agendas; follow up on officer confirmations by email if needed.
•Form a 3–4 person volunteer subcommittee to review and propose edits to the IVAMP.
•Include monitoring findings in the annual report and revisit sampling strategy if necessary.
•Staff to provide existing plan and check regulatory requirements before any treatment decisions are made.
•Staff to revise prior draft solicitation and consider separate procurements for IVAMP and treatment services.
The Tumwater Public Health and Safety Committee met on Wednesday, November 4 to hear a presentation on a draft ordinance to reinstate fire protection impact fees, review the consultant's methodology, set a timeline for council consideration, and receive brief updates including a well-attended trunk-or-treat event.
Discussion Points
•Chief and staff described call-volume increases and the history of fees in city code.
•Motion to approve minutes and chair\u0002s confirmation of passage by voice vote.
•Presentation of draft fire impact fee study and methodology by consultant Tim Wood.
•Report on attendance for trunk-or-treat event and need to restock candy.
•Request by a newer committee member for a standing schedule or quarterly updates.
•Staff agreement to prepare a work plan and to gather cyclical items from department chiefs.
•Staff committed to internal review of the draft study and stakeholder outreach.
•Thanks to vendors and partner agencies.
Decisions
•Minutes approved by voice vote; no recorded roll-call tally in transcript.
•No formal adoption of schedule at this meeting; staff tasked to prepare proposals.
•No formal decision taken at this meeting; ordinance placement and fee-resolution timeline provided.
Directions
•Chief will prepare an SRO report for next meeting.
•Place the ordinance on the Dec. 1 council agenda and fee resolution on Dec. 3.
•Police and parks staff will consider improvements for next year.
•Share the draft study with council and stakeholders early next week if review is completed.
•Staff to draft a work plan and coordinate with department chiefs and Mayor Pro Tem Holtz.
Public works committee reviewed several service‑agreement amendments, a utility undergrounding cost reconciliation, final acceptance of the 2025 pavement maintenance project, and housekeeping sewer‑code changes; the committee voted to forward five items to the Nov. 17 city council consent calendar.
Discussion Points
•Grant timing risk was mitigated when TRPC expedited funds for another regional project, buying the city time.
•Rights‑of‑way negotiations have been extended to four years due to business relocations, sales and additional site visits.
Decisions
•Motion passed to forward the supplemental agreement to council.
Directions
•Place supplemental agreement on Nov. 17 council consent calendar recommending approval and mayoral authorization.
November 4, 2026 - Thurston County Board of County Commissioners Work Session 2026-11-04
Thurston County commissioners reviewed a visitor‑economy presentation from Experience Olympia & Beyond and conducted preliminary reviews of the biennial budget amendment, ratified two collective bargaining items for the consent agenda, approved chapter three of the county bylaws and directed staff to publish notice for Amendment Two with adoption slated for Dec. 1.
Discussion Points
•Board moved to direct staff to incorporate Amendment Two as presented.
•Commissioners asked clarifying questions about byway and strategy.
•Decision to end Placer geofencing contract due to cost and changing phone privacy technology.
•Deployment of 'Ollie' AI assistant and the 'Talk Thurston to Me' podcast.
•Staff presented Amendment Two and requested board direction to publish notice beginning Nov. 12.
•Staff presented redline and clean copies and said they incorporated commissioner requests.
•Staff sent an e‑brief with details; board raised no questions.
•Sustainable Travel International to produce documentary content.
•Two AFSCME agreements for 2026–2028 added to consent agenda.
•VCB presented 2025 tourism data and 2027 priorities.
Decisions
•Board approved chapter three as presented.
•Motion to direct staff passed by voice vote.
Directions
•Staff to publish public notice Nov. 12 for two weeks and prepare adoption resolution for Dec. 1.
November 4, 2026 - Thurston County Board of County Commissioners Business Meeting 2026-11-04
Thurston County Board of County Commissioners held its Nov. 4, 2026 business meeting. Commissioners approved a consent agenda, heard public comment on the Black Lake Quarry rezoning and river conservation, and received county updates on wastewater partnership projects, road work and a veterans resource fair.
Discussion Points
•29 miles of seal surfacing on 13 roads to extend pavement life.
•Allegation that the 2025 Comprehensive Annual Financial Report is overdue.
•Appeal context connecting rezoning and conservation concerns.
•Commenter cited RCW 36.41.20 and said a state audit is pending.
•Conservation value and ecosystem services of the Black River Corridor.
•GMHB invalidation of Black Lake Quarry rezone and the required legislative compliance.
•LOTT partnership award and county participation in regional wastewater management.
•Motion to approve consent agenda with no discussion recorded.
•Public concern that consent agendas reduce transparency for significant items.
•Question whether borrowed funds used for Plum Street purchase were used only for the stated purpose.
•Question whether state law permitting itemization of veterans funds would affect county budgets or allow new taxing authority.
•Replacement of 1924 bridge with a 50‑foot span to improve fish passage and reduce flooding.
•Requests that the county weigh habitat protection in land‑use decisions.
•Request to staff to prepare rescission ordinance and include that option at the next public hearing with a requested board vote by Feb. 15.
•Two compliance options: supplement the record and attempt to preserve RRI rezoning, or rescind the invalidated rezone and return to prior zoning.
Decisions
•Consent agenda items 1–18 approved as presented.
Directions
•Public urged staff to add a rescission alternative to the next public hearing packet and draft an accompanying ordinance.
Tumwater City Council met Nov. 2, 2026, and approved a development agreement with Costco, adopted a new 0.1% public safety sales tax, advanced property-tax and budget ordinances to future meetings, approved lodging-tax funding recommendations, authorized a Brewery District EIS contract, and ratified emergency preservation work on the Davismaker oak.
October 28, 2026 - Board of County Commissioners Work Session 2026-10-28
Thurston County Board of County Commissioners held a work session on Oct. 28, 2026 to review Amendment Two to the 2026–2027 biennial budget, get updates on the TC Connect enterprise system, consider advisory-board appointments and a requested presentation from the Thurston County Realtors Association about an alternative home energy-score approach. The board voted to reappoint a Timberland Regional Library representative and agreed to host the Realtors' briefing; a motion to delay the home energy-score contract failed.
Discussion Points
•Advisory boards recommended candidates and removals; staff proposed a short outreach if a recommended member was not responsive.
•Commissioners expressed concern about costs, implementation pace, staff strain and possible need for alternate approaches.
•Potential dates identified in early December and staff involvement for logistics.
•Staff described governance, vendor support (Baker Tilly) and module‑level triage.
•Staff detailed recommended general‑fund adjustments and not‑recommended items including sheriff office requests and payroll corrections.
•Staff presented Amendment Two scope, legal authority (RCW citations) and a timeline for public notice and adoption.
•No formal change to the project direction; continued oversight and periodic reporting.
•No formal motion; board directed staff to return with options.
•Reappointment of Susan Hettinger approved by unanimous vote.
Directions
•Board asked staff to accept edits and return with updated materials on Nov. 4 for the final review.
•Board requested continued updates and invited staff to return with any recommended schedule or scope adjustments at the Nov. 4 session.
•Commissioner aides and staff to coordinate potential dates and plan, with a preference to hold event before the end of the year.
•Staff to prepare appointment package and removal paperwork for upcoming business meeting and do outreach if recommended members have not been contacted.
Tumwater council held a work session on Oct. 27, 2026 that focused on preserving the Davis Meeker Garry Oak after storm damage, budget planning including a near-term bond sale and creation of two new funds, and scheduling an executive session on potential litigation/real‑estate matters. Council staff described an emergency permit process, an emergency declaration by the mayor, and a plan to return to council with a budget amendment to cover more tree work.
Discussion Points
•Commissioner McCandy and Joan emphasized community interest and historic value as reasons to preserve the tree.
•Cost estimate for retention exceeds $100,000; root‑zone work funded and scheduled for Nov. 2; pruning requires permit and additional funding.
•DAHP permit 15‑day review window; root‑zone work permitted and scheduled Nov. 2; pruning requires permit and lane closures.
•Historic Preservation Commission preferred retention to preserve community and historic value.
•Legal authority for executive session cited as RCW 42.30.110; public notice included duration (10 minutes).
•Mayor issued emergency declaration to speed contracting.
•Risk assessment changed after Sept. 25 storm; 32% crown loss and five defects rated high risk over Highway 99.
•S&P assigned a double‑A rating; a bond sale may occur in about a week.
•Tradeoff between spending on tree retention and other social services raised by Councilmember Peter.
•Two new funds (abatement and habitat conservation plan) proposed for consent calendar to manage reimbursements and mitigation credits.
Decisions
•Emergency declaration issued; no council vote recorded.
The City of Tumwater Planning Commission reviewed a proposed 2026 comprehensive plan amendment to update the economic development element, heard staff presentations on goals (business retention, placemaking, redevelopment, affordability and energy options), set a public hearing for Nov. 10 on ordinance O2026-012, and reviewed the department's 2027 work program and multiyear projects including the habitat conservation plan and urban growth area analysis.
Discussion Points
•Advisory groups (technical and policy) convened
•Commissioner questions about specific goals and implementation details
•Concerns about impact fee burden on small businesses
•Consultant (Burke) service agreement being finalized
•Council directed staff to investigate BESS pathways
•Current code lacks explicit pathways for data centers and BESS
•Legislative funding provided for planned-action EIS
•Multiyear projects: housing codes, urban forestry, UGA analysis, HCP support
•Need for childcare supports and family housing to retain/attract families
•Need for zoning compatibility analysis
•Planned hiring of associate planner and FTE allocation
•Public outreach and survey results showing majority support
•Public subsidy and advocacy likely required for meaningful childcare and housing interventions
•Referral to technical-assistance partners (EDC, chambers)
•Regional partnerships (Child Care Aware, early learning coalitions) recommended
•Staff presentation of amendment goals and regional consistency criteria
•Temporary use of public land for markets
•Work program structure (above/below the line)
Decisions
•Public hearing scheduled for Nov. 10 on O2026-012
Directions
•Proceed with consultant-managed EIS and advisory-group meetings; staff to report back on schedule and mitigation planning
•Set public hearing for Nov. 10; staff to prepare hearing packet and notices
•Staff to include partner outreach and possible policy tools (tax exemptions, program options) in implementation actions
•Staff to incorporate partner referral language and implementation actions into the element and work plan
•Staff to present work program to council in Dec. joint session; staff will return with details on prioritization if council requests changes
•Staff to research zoning and code amendments for BESS and return with options if council confirms direction
Hearing examiner Mark Scheidmeier convened a public hearing on a preliminary plat (TUM-26-0115) for the 5th Avenue Townhomes, a proposal by ASH Holdings to subdivide 1.69 acres at 585 5th Avenue SW into 11 townhome lots; staff recommended approval with conditions, neighbors raised traffic, parking, sidewalks, and character concerns, and the examiner took the record and said he will issue a written decision within two weeks.
Discussion Points
•Applicant confirmed two parking spaces per unit (garage + driveway) consistent with code and described off‑street and on‑street parking availability.
•Applicant described two bio‑retention stormwater ponds and deferred detailed hydrology to the engineer; final designs to be reviewed at grading permit stage.
•Applicant said impact fees contribute to infrastructure such as safe walking routes.
•Concerns were raised about winter maintenance and whether impact fees produce near‑term improvements.
•Confederated Tribes of the Chehalis Reservation requested an inadvertent discovery plan for cultural resources.
•Neighbors say sidewalks and sight lines are inadequate and ask for additional frontage improvements or signage.
•SEPA DNS issued August 28; state and regional agencies provided comments to be addressed in permitting.
•Staff concluded transportation concurrency rules were met; project estimated ~6 PM peak‑hour trips and did not require further mitigation under the city threshold.
•Staff recommends approval of preliminary plat for 11 townhomes at 585 5th Ave SW; project includes frontage improvements and ~1.13 acres of active/passive open space.
•Tree inventory shows 12 trees; code requires post‑development minimum of 21 trees; applicant proposes additional plantings to meet requirement.
•Tree inventory shows 12 trees on site; code requires a post‑development minimum equivalent to 21 trees, so conditions for additional plantings are expected.
Decisions
•No final decision rendered; hearing examiner will issue a written decision within the contractual timeframe (two weeks).
Directions
•Applicant to provide optional exhibit showing distance to nearby schools if desired.
•Examiner to weigh public testimony; staff to continue technical review at permit stage.
•Final landscape plan and detailed stormwater design to be reviewed at site‑development/grading permit stage.
•Inadvertent discovery note to be included on site‑development grading plan; final tree planting and stormwater details to be reviewed at permit stage.
October 27, 2026 -Board of County Commissioners Work Session 2026-10-27
Thurston County commissioners held an agenda-setting work session on Oct. 27, 2026, reviewing next week’s business docket, several interlocal and grant agreements, RFPs for environmental and wastewater work, midterm budget adjustments and a detailed district court capacity briefing that flagged major staffing and technology pressures.
Discussion Points
•Accept Ecology grant for septic repairs; pass project management and construction through to HOA.
•Authorize issuance of RFP for phosphorus mitigation.
•Board consensus to move to public notice and hearings timeline.
•Commissioners asked about state funding and rate study contributions.
•Court presented workload statistics and impact projections tied to Enterprise Justice CMS.
•Item 5 (service contract) and item 6 (grant acceptance) are linked.
•Presentation of the midterm adjustment packet and three‑year reduction approach.
•Renewal of interlocal agreement for ITA reimbursement; 18‑month term to accommodate data collection for rolling three‑year average per‑case rate.
•RFP schedule and Lake Steering Committee oversight.
•Staff described 17 FTE need and cost estimates.
Decisions
•Board authorized RFP issuance.
•Board directed staff to proceed with publication and scheduled hearings; motion carried.
Directions
•Staff to issue RFP Nov. 5 and accept proposals through Dec. 3.
•Staff to publish preliminary notices Nov. 12–30 and prepare public hearing materials for Dec. 7 and final deliberations for Dec. 9.
Budget & Finance Committee met Oct. 23, 2026 to review a proposed reinstatement of fire impact fees (study methodology presented), receive a monthly budget update including a new AA bond rating and revenue projections, consider a budget amendment and two new fund ordinances (abatement and HCP).
Discussion Points
•Amendment includes several large projects, CERB grant revenue/expense, and assumed $60M bond proceeds; Station T2 construction not included in current amendment as it starts in 2027.
•Chief Hurley summarized that the original 2002 ordinance limited fees to paying headquarters debt that was retired in 2009; FCS contracted to produce methodology.
•City received AA bond rating; September sales-tax strong; property-tax timing key to year-end projections.
•Fund will improve transparency and accounting for HCP-related transactions.
•HCP fund separates credit sales revenue to pay debt service or purchase additional conservation properties.
•Naming change from 'code enforcement' to 'abatement' suggested and accepted.
•Proposed fund keeps abatement reimbursements separate from general fund; example $400,000 baseline discussed.
•Tim Wood explained statutory limits, calculation framework (existing system and future projects), and ADU cap of 50%.
Decisions
•All motions recorded above passed unanimously in committee.
•Committee approved placement of abatement fund ordinance on Nov. 1 consent calendar.
•Committee approved placement of O2026-019 for Council action.
•Committee approved placement of O2026-023 on Nov. 1 consent calendar.
•Committee voted unanimously to place ordinance O2026-024 on the Dec. 1 City Council calendar with recommendation to adopt.
Directions
•Complete draft analysis and review with staff and stakeholders; brief Public Health & Safety Nov. 4 and Public Works Nov. 19; place ordinance on Dec. 1 council calendar.
•Place amendment on Nov. 17 public hearing docket and Dec. 1 consent calendar.
•Place ordinance on Nov. 1 consent calendar and return fund accounting details to Council.
•Present further details at budget workshop 4; include bond-rating context in upcoming materials.
•Staff to update ordinance language and place on Nov. 1 consent calendar.
The Tumwater General Government Committee met Oct. 21, 2026. Members approved minutes, recommended placing an ordinance extending multifamily housing tax exemption dates on the Nov. 2 council calendar, heard consultants’ findings from an affordable housing feasibility study, recommended a $290,000 contract for the Brewery District planned-action EIS, and approved a one-year extension to a Department of Fish and Wildlife HCP contract.
Discussion Points
•Committee members asked for clarity on EIS geography and community impacts near Bates Street and Safeway.
•Council asked whether applications can be accepted during the extension; staff said yes.
•HCP extension is time-only; current contract expired in September.
•Need outpaces supply; preservation of naturally occurring affordable housing is critical.
•Not signing the extension could negatively impact approved and ongoing work with partner agencies.
•Planned-action EIS streamlines SEPA compliance for future development scenarios and reduces permitting steps for applicants.
•Regional funding is concentrated on services; local incentives and capacity building needed to increase production.
•Staff recommended a one-year extension to allow consultant evaluation and potential programmatic changes.
Decisions
•Committee recommended council consent approval of the extension.
•Committee recommended council consideration; no final contract award at committee level.
•Committee recommended placing O2026-017 on the council calendar; no final ordinance adoption at committee level.
Directions
•Consultants to examine zoning/land opportunities in Task 3 and return with recommendations and evaluation in January.
•Place contract on Nov. 2 council consideration calendar and provide a December update on geography and coordination.
•Place HCP one-year extension on Nov. 2 council consent calendar.
•Place ordinance on Nov. 2 council calendar with recommendation to adopt.
City Council meeting at Tumwater City Hall where council heard public comment and debated a proposed mandatory Home Energy Score ordinance, adopted a resolution setting body-worn camera redaction fees, approved two property purchase actions (Puget Western conservation credits and 310 Israel Road), and sent the HES ordinance back to a work session for further consideration.
Discussion Points
•Council members raised concerns about cost to city, subsidy funding, equity outcomes, renters inclusion, and whether scores produce improvements.
•Council approved the purchase and authorized the mayor to sign closing documents.
•Council authorized the purchase agreement amendment and closing authorizations.
•Motion to adopt ordinance failed; council approved referral to a work session.
•No formal action taken; council asked for staff follow‑up and engagement with law enforcement.
Directions
•Authorize mayor to complete purchase and proceed to close if conditions are met; staff to pursue bond sale and prepare renovation plan.
•Authorize mayor to execute purchase and finish closing if conditions met.
•Implement the adopted fee schedule for nonexempt requesters and publish procedures; exempt requesters continue to receive required footage for their portion of incidents.
•Police and staff to meet with residents; public‑health and safety committee to review enforcement options and reporting.
•Refer ordinance O2026-004 to a staff-scheduled work session for additional analysis and answers to council questions.
October 20, 2026 - Thurston County Board of County Commissioners Business Meeting & Public Hearing 2026-10-20
Thurston County commissioners held a regular business meeting Oct. 20, 2026, approving an IT security access policy, advancing two public hearings (one approving renewed Thurston Conservation District rates and charges and one approving transfer of a 1.6-mile trail segment to the City of Yelm) and receiving extensive public comment about a proposed mandatory home energy score program.
Discussion Points
•Commissioners asked where biometric data would be stored and whether there is overlap with the deferred AI policy.
•Developers need faster, predictable permitting, adequate power and more industrial land.
•Legal counsel argued mandatory HES could jeopardize REET II revenues under state statute.
•Manufacturing contributes significantly to county GDP and middle-class growth.
•Multiple public commenters raised affordability and equity concerns (seniors, low-income homeowners).
•Policy sets access control and least-privilege standards and includes reference to biometrics for sensitive systems.
•Public Works staff confirmed grant release and grant-amendment steps were complete.
•Realtors proposed voluntary, industry-led disclosure pilot for HES.
•Some commenters argued the trail should remain county-managed; Yelm argued it will invest in safety and parking.
•Supporters noted farmland loss trends and the need for local funding to pair with federal/state grants.
•TCD argued local rates leverage $17 of external funding per local dollar and would support farmland preservation.
•Workforce training and partnerships are essential to meet hiring needs.
Decisions
•Adopt IT Security Access Control Policy 700-03
•Authorize grant amendment and execute interlocal; record deeds when city signs
•Ordinance adopted to renew rates and charges (Resolution 2026-03)
Directions
•Authorize Public Works director to execute grant amendment and interlocal; record deeds after city signs.
•Earth Advantage contract moved off tonight’s agenda to next business meeting for additional staff follow-up.
•Staff to clarify data-storage location for biometric credentials and ensure consistent document titles.
•TCD to implement program and report annually on use of funds and leverage.
Tumwater Historic Preservation Commission heard public comment and technical presentations on the 400-year-old Davis Meeker Oak, received an update from the Olympia Tumwater Foundation on the History & Nature Center and park projects, and voted unanimously to seek an amended permit to accelerate structural pruning to retain the oak.
Discussion Points
•Architect showed renderings and noted future certificate of appropriateness and historic‑resource reviews.
•Cemetery sign grant scope changed to a carved stone marker with a June 2027 completion target.
•Commissioners expressed concern about optics, timeline, and public safety and asked staff to pursue permit changes and possible emergency procurement.
•Commission recommended outreach to local tribes and additional historical research.
•Commission will see certificate of appropriateness application in future.
•Deschutes Valley Trail work and interpretive signage are proceeding to bid.
•DOT demolition delayed due to utility and contamination issues.
•Foundation and architect will coordinate with DAP and refine plans.
•Foundation previewed strategic plan priorities and projects at Schmidt House and Tumwater Falls.
•Foundation reported a $300,000 Bowen grant and Friends of the Falls fundraising (~$55,000, 115 members).
•Prager assessment summarized recent 24" branch failure and estimated 32% foliage loss; three options presented (retain; wildlife snag; removal).
•Pylons and totems are on the national register; totem designs may not represent local tribal traditions.
•Section 106 review has flagged proposed changes as adverse to the 1962 building.
•Staff explained original work plan sequencing (root work scheduled first then pruning) and the drought-driven delay that pushed pruning later.
Decisions
•Motion passed unanimously to seek a revised permit and maximize structural pruning to retain the tree.
Directions
•Foundation to provide additional documentation and mitigation measures to DAP and city staff.
•Foundation to pursue formal certificate of appropriateness and coordinate with city staff for preservation review.
•Return to commission for formal certificate of appropriateness review.
•Staff to circulate the updated DOT demolition schedule and project timelines and to follow up with quotes for the cemetery sign.
•Staff to contact tribal partners and report findings; investigate original appearance and documentation of the pylons and totems.
•Staff to pursue emergency declaration/procurement and to prepare traffic control plans for pruning operations.
•Staff to secure amended/revised permit consistent with Option 1 and to coordinate with DAP.
The Tumwater Lodging Tax Advisory Committee held applicant interviews and recommended $274,800 in LTAC awards and a $225,000 historic preservation allocation for council approval.
Discussion Points
•Commissioners asked about qualifying status and venue availability.
•Commissioners asked about the Old Brew Tower long-term stabilization needs and seismic retrofit cost estimates (estimated at $6–7M).
•Committee asked about housing-block arrangements with Great Wolf Lodge and partner organizations' support.
•Committee members reviewed applicant presentations and inputs to a shared spreadsheet to set award amounts.
•Denny said Crosby House roof is failing and requires replacement; foundation was replaced two years ago and gutters are needed to divert water.
•Foster described record numbers in pickleball and softball and explained venue sourcing across Tumwater, Olympia and Lacey.
•Members debated small rounding adjustments and whether to roll small remaining funds into next year or distribute now.
•Members queried whether a smaller award would reduce promised advertising or programming.
Decisions
•Application considered in final award allocation.
•Committee voted to forward the $274,800 distribution list to council.
•Request factored into final award spreadsheet.
•Vote to forward $225,000 allocation to council.
Directions
•Committee to forward the $225,000 recommendation to council.
•Parks & Rec to develop project scope and cost estimate for roof replacement and gutter installation.
•Staff to include the Senior Games' application in funding deliberations.
•Staff to note the $12,000 request in the award deliberations.
•Staff to schedule council consideration of the LTAC recommendation and include applicant materials and room-night estimates.
The Tumwater Equity Commission met to add public comment to the agenda, heard multiple public commenters urging a mandatory Home Energy Score (HES) ordinance and discussed six equity-focused recommendations to accompany that ordinance. The commission voted to recommend that ordinance 020260004 include the listed equity safeguards and then heard a presentation from the water resources team about the city's NPDES stormwater permit, overburdened-community mapping and a funded regional stormwater facility project.
Discussion Points
•Adequately fund subsidies for vulnerable sellers to avoid waivers removing data from buyer disclosure; do not legislate assessor business operations; remove program-pause language as commission lacks authority.
•Mapping methodology for identifying overburdened communities; prioritization of retrofits and tree canopy goals; monitoring and maintenance of stormwater facilities.
•Public commenters supported mandatory HES and requested subsidy protections, monitoring for investor purchases, language access and not harming assessor payments.
•Staff asked for feedback on nine draft goals and offered a QR code and survey link for public input; planning commission review scheduled the following day.
•Subsidy funding approach (adequately fund so all buyers have access to HES); metrics and thresholds for the equity report; translation and access formats for program materials.
Decisions
•Motion recommending ordinance 020260004 with equity safeguards carries by voice vote.
Directions
•Staff to engage GIS and mapping team and return with proposed metrics and mapping items in December and follow permit deadlines.
•Staff to present modified recommendation to city council and to work with attorney/staff to translate recommendation into ordinance text.
•Staff to propose specific metrics and funding projections to support council budget decisions.
At its Oct. 13, 2026 meeting the City of Tumwater Planning Commission recommended that the city council extend the multifamily housing tax-exemption application deadline by one year, set a public hearing on transportation-related code updates for Nov. 10, and reviewed a comprehensive-plan amendment on economic development including data on job concentration and funding for brewery/brownfield redevelopment.
Discussion Points
•CERB grant $100,000 awarded with $25,000 local match to fund planning consultants.
•Commissioner criticized the Tumwater Chamber's visibility and participation.
•Commissioners asked staff to present top 3–5 priority actions and to include the Tumwater Chamber in outreach.
•Commissioners expressed concern over parking, safety, and revenue loss from lower fees for smaller units.
•No audible public testimony was received during the hearing.
•Staff explained impact fees must be 'proportionate' and may be calibrated by square footage or other metrics.
•Staff outlined five themes: diversification, business retention/growth, land for employment (brewery/brownfields), district vibrancy, and affordability as equity.
•Staff said an impact-fee study is underway and schedules are derived from the city’s project list.
•Staff said the city partners with Ryan Reynolds, president of the Tumwater Chamber, and will include the chamber in plan materials and outreach.
•Staff said the extension allows applicants to apply while a consultant completes a January 2027 program evaluation.
•Staff stated the code change would move the program expiration date from 2042 to 2043.
•Staff will produce a redevelopment roadmap for brewery and brownfield sites to inform developers and support funding requests.
•Technical slides showed significant household income shifts and a heavy concentration of jobs in public administration.
Decisions
•Commission approved setting Nov. 10 hearing.
•Commission voted to recommend adoption of O2026-017 to City Council.
Directions
•Set Nov. 10 public hearing on transportation code update.
•Staff to continue outreach through Nov. 15 and to present a work session on Oct. 27; hearing expected in November and council review in December.
•Staff to forward recommendation to General Government Committee (Oct. 21) and Council (Nov. 2).
•Staff to incorporate prioritized actions into outreach materials and include local chamber in engagement.
•Staff to provide consultant evaluation to Council by January 2027.
•Staff to provide impact-fee study and proposed fee table by Nov. 10 hearing.
•Staff to use grant funds to contract consultants and produce planning materials; staff to pursue further grants for implementation.