The Chisago County Water Plan Policy Team was scheduled to review groundwater planning materials, the county’s 2027 water resources plan, a Lower St. Croix watershed work plan and aquatic invasive species updates. Attached reports describe proposed engagement activities, estimated watershed funding and recent county program results.
Discussion Points
•FY27 grant activities have projected phosphorus reductions and other measurable outputs.
•The county report described Phragmites treatment results, inspection activity, volunteer monitoring and grant reimbursements.
•The draft proposed a three-task process for groundwater characterization, agency capacity assessment, and refinement of issues and goals.
•The plan described public input opportunities but left the decisions open to public influence marked TBD.
•The proposed plan lists 10 goals for water monitoring, public education, planning, invasive-species control and wastewater management.
•The work plan estimates watershed-wide expenditures for 2027-28 and identifies grant, match and other funding sources.
Chisago County Board packet for the Nov. 4, 2026 regular meeting with Health & Human Services items and several contract, grant and ordinance matters scheduled for consideration. Key items include a $5,000 media contract for Child & Teen Checkups, opioid settlement staff expense reimbursement of $4,774.06, a Hazelden Betty Ford letter of agreement (26 admissions + $64,000 patient-aid pool), and a public hearing on a replacement Dangerous Dog ordinance.
Discussion Points
•Agency responsible for residential services costs; fees set in Schedule A.
•Campaign to run Nov. 1, 2026–Mar. 31, 2027 with monthly reporting.
•Continues Hazelden relationship; provides 26 admissions and a $64,000 patient aid pool.
The Chisago Lakes Lake Improvement District (LID) was scheduled to consider technical and maintenance work on the North Center–North Lindstrom channel, solicit quotes for brush clearing, and forward a proposed $28,000 professional-technical contract with the Chisago Soil & Water Conservation District to the Chisago County Board at its Nov. 2, 2026 meeting in Center City.
Discussion Points
•Contract of $28,000 covers five task areas including BMP coordination, maintenance, outreach, cost-share administration, and long-term monitoring.
•Contract terms include monthly invoicing, billing caps per hour, and termination provisions for insufficient funding.
•DNR review identified missing GIS/data files and an elevated continuity error in the legacy model.
•EOR proposed conversion to PCSWMM and seven tasks to address DNR comments, including 100‑year event runs and scenario testing.
•Lab to Lakes tasks include telemetry, PIT station maintenance, fisheries assessments, electrofishing and data analysis; equipment rental and personnel line items are provided.
•LID and EOR inspection found woody vegetation impeding channel function; two reaches measured ~670' and ~250'.
•Packet shows invoicing-to-date and remaining billing limit for specific Lab to Lakes contract lines.
•Staff met with a contractor informally and reported wide variability in potential pricing.
Directions
•Board to direct staff to solicit written quotes and return with cost and scope options for board consideration.
•Continue survey work, coordinate fall netting with commercial fishermen, and pursue DNR permitting steps; track program spending and grant reimbursements.
•LID Board to forward the proposed contract to the County Board for approval.
•Staff to coordinate completion of minor updates within existing general engineering funding, or request County Board authorization for a change order if full Exhibit C scope is selected.
Agenda center file County Board of Commissioners Meeting
The Chisago County Board of Commissioners met Sept. 16, 2026, and approved multiple consent-agenda items, including applications for state LRIP road funding, labor contracts, the 2027 health plan and a commitment of a 20% county match for a federal wildlife crossings grant on TH 8. The board also approved a program-management agreement for county building projects and set a public hearing to consider replacing the county's Dangerous Dog ordinance.
Discussion Points
•Board approved multiple bargaining-unit contracts and the 2027 health insurance plan; no contract or plan specifics recorded in the minutes.
•Board recorded approval of program management agreement after removal of a typographical error.
•Board set a public hearing to seek public comment on repeal and replacement of the Dangerous Dog ordinance.
•Budget and Finance Committee recommendations included several small appropriations and reallocations.
•Commissioner Swenson voted opposed; the transcript does not capture reasons for opposition.
•County Engineer Joe Triplett provided updates on Public Works projects; no action was taken on the update itself.
•Environmental Services Director Kurt Schneider presented a report and requested a small fund transfer to hire a contractor for cleanup.
•Resolution cites the presence of the state-listed threatened Blanding’s turtle and the TH 8 corridor’s role in fragmenting habitat.
Decisions
•Approval of listed bargaining-unit contracts and the 2027 health insurance plan.
•Board adopted Resolution No. 26/1021-1 supporting LRIP applications for CSAH 30 and CSAH 7.
•Board adopted Resolution No. 26/1021-2 committing to provide the required 20% non-federal match (currently estimated at $600,194.28) subject to final costs and board approval.
•Board approved $7,500 budget adjustment to hire Evergreen Recycling, LLC; approved $4,384 to CMCOA; purchases of two sheriff vehicles; park CIP reallocations; and $30,272.50 for parking lot native plants.
•Board approved ICS as program management company under an AIA agreement for five years.
•Public hearing scheduled for Nov. 4, 2026 at 7:00 p.m.
Directions
•County administration and county attorney to prepare hearing notice and any draft ordinance language for the board and public.
•County Administrator or authorized representative authorized to take actions necessary to finalize the agreement.
•Finance to reallocate CIP and process purchases as approved.
•HR to finalize contract documentation and implement the 2027 plan.
•Proceed with procurement/engagement of vendors and report back upon completion.
•Return any follow-up items to the board as required.
•Staff authorized to pursue LRIP funding and prepare applications.
•Staff (County Administrator/County Engineer) authorized to support grant application and coordinate with MnDOT.
Chisago County Board of Commissioners met Oct. 21, 2026; packet items included local road grant support and a LRIP letter for Nessel Township, a Public Works project update, a $7,500 Solid Waste budget shift for Swedish Immigrant Trail cleanup, proposed updates to the county’s dangerous-dog ordinance, a proposal for two Sheriff specialty vehicles using $600,000 in public-safety funds, a sizable medical-plan renewal presented by benefits broker USI, and a Wildlife Crossings Pilot Program grant request requiring a 20% county match.
Discussion Points
•Board set Dec. 2, 2026 for public review and comment on the final levy and budget.
•Committee reviewed year-to-date financials, staffing updates, and recommended adoption of preliminary levy and budget.
•Contractor quote listed at $5,000; additional $2,500 requested as contingency.
•Current 2000 command vehicle is unreliable and lacks modern infrastructure for CNT/Drone operations.
•Draft authorizes recovery of hearing and care costs from owners and provides hearing timelines and destruction authority under defined findings.
•Draft requires registration, microchipping, visible signage, and proof of liability insurance or surety bond for Dangerous Dogs.
•Request to advance up to $7,500 from 2027 Solid Waste budget into 2026 to hire Evergreen Recycling for debris removal.
•Resolution of board support is required by LRIP application rules.
•Staff recommended submitting LRIP applications for CSAH 30 (2028) and CSAH 7 (2029).
•Staff sought board direction on contribution levels and plan design, including employee share and vendor options.
October 07, 2026, County Board of Commissioners Meeting. Minutes
The Chisago County Board of Commissioners met Oct. 7, 2026, taking routine actions including approval of a final plat for Burnside, enactment of a zoning ordinance amendment related to cannabis, acceptance of a 2027 traffic-safety grant, several intergovernmental agreements and a lease, and tabling a Liberty Ponds presentation pending a City of Wyoming decision.
Discussion Points
•Board approved a support letter to aid North Branch's LRIP application.
•Board approved grant and authorized a Sheriff's Office representative.
•Board approved the amendment to continue inmate boarding arrangements with Hennepin County.
•Board approved the lease as a consent item; financial terms not recorded.
•Board enacted ordinance language but separately asked for additional Planning Commission review of Section 4.20.
•HHS Director provided operational updates; specific items were moved to the consent agenda for approval.
•Planning Commission recommended preliminary plat July 2, 2026; final plat submitted Aug. 6, 2026; county attorney reviewed title evidence Sept. 30, 2026.
Decisions
•Amendment No. 2 approved; administration to implement terms.
•Final plat approved subject to condition requiring further review for any pre-recording deviations.
•Five HHS items were approved on the consent agenda.
•Lease approved; administration to finalize execution.
•Ordinance enacted; Section 4.20 referred for further review.
•Sergeant Kyle Puelston authorized as county representative for the TZD grant.
•Support letter approved; administration to transmit.
Chisago County Water Plan Policy Team met Sept. 14, 2026, to review a draft annual workplan, schedule a November groundwater work session, consider an amendment to the Lower St. Croix watershed plan, recognize two natural-shoreline winners, hear aquatic invasive species updates and set upcoming outreach events.
Discussion Points
•Advisory and steering committee will pursue an amendment to the LSCCWMP to work toward 2030 goals
•Awards are peer-nominated and committee-selected
•Incorporate new Lake Management Plans into the annual workplan
•List of upcoming events for outreach and partner coordination
•Next meeting scheduled for Nov. 9, 2026
•Plan intended to identify needs and pursue state funding
•Plan will follow neighboring county models
•Public engagement to be sought at local events
•Routine approvals of minutes and agenda
•Two families recognized with Natural Shoreline Awards
•Updates on invasive Phragmites, Starry Trek, point-intercept surveys, watercraft inspections/decontaminations
•Use social media metrics to identify age/demographic outreach gaps
Decisions
•Agenda approved
•Meeting adjourned
•Minutes approved
Directions
•Coordinate partner participation at listed outreach events
•Hold groundwater work session at Nov. 9 meeting
•Staff to revise the draft workplan to reflect these suggestions
The Chisago Lakes Lake Improvement District Board met Sept. 14, 2026, approved routine consent items and invoices, voted unanimously to recommend a contractor for invasive phragmites treatment (contract not to exceed $7,000) and to recommend a bylaw amendment allowing cancellation of regular meetings, received a Lab to Lakes carp-management update, and heard staff and county reports.
Discussion Points
•Administrator and water-resources manager gave updates; EOR and WSB staff were available for technical input.
•Board members discussed and approved recommending Minnesota Native Landscapes for phragmites treatment and set a $7,000 not-to-exceed cap.
•Consent agenda items approved including minutes, financial report, and invoice payments.
•Directors discussed and approved recommending a by-law amendment to allow cancellation of regular meetings.
•WSB presented current activities and data regarding the Lab to Lakes Carp Management Plan.
Decisions
•Board approved the recommendation to the County Board by unanimous vote of those present.
•Board voted unanimously to forward the recommended by-law amendment.
•Consent agenda approved unanimously among directors present.
•Meeting adjourned at 7:14 p.m. following unanimous vote of directors present.
•No formal action was taken after the presentation.
Directions
•Recommendation forwarded to Chisago County Board for consideration and potential contracting.
•Recommendation to be forwarded to Chisago County Board.
September 03, 2026, Planning Commission Meeting. Minutes
Chisago County Planning Commission on Sept. 3, 2026 recommended approval of a Conditional Use Permit for Sno‑Baron’s Snowmobile Club, Inc. with limits on event types, attendance and notification requirements after a 4-3 vote amid extensive public comment about traffic, noise and enforcement. The Commission also continued a floodplain amendment hearing to Oct. 1 and discussed a proposed cannabis zoning amendment.
Discussion Points
•Commissioners to review and hold public hearing Oct. 1
•Concerns about enforcement capacity (single Code Enforcement Officer)
•Concerns about segmentation (piecemealing) and whether Commission can alter application by conditions
•Draft ordinance may include a 1,000‑foot residential setback or 250‑foot property boundary setback
•Noise and multi‑day events expanding impact beyond one weekend
•Notification and traffic‑management needs for large events
•Potential traffic congestion on MN‑95 and local roads
•Public‑safety and enforcement capacity (Almelund Fire Department, Sheriff's Office)
•Routine administrative business and meeting scheduling.
•Staff asked Commission to receive any testimony and continue the hearing to Oct. 1.
•State disagrees with County interpretation of cannabis zoning rules
•Whether segmentation/piecemealing was occurring and its legal import
•Whether the applicant properly categorized the request as Commercial Recreation
•Whether the application should be evaluated as Commercial Recreation or Rural Retail Tourism
•Whether the Commission could effectively alter counts/parameters via conditions
Decisions
•Approved routine motions unanimously and adjourned.
•Commission chose to evaluate the application as presented and address impacts through conditions rather than reclassify as Rural Retail Tourism.
September 02, 2026, County Board of Commissioners Meeting. Minutes
Chisago County Board met Sept. 2, 2026; the board approved a set of consent items (including payment of warrants totaling $3,825,671.89), authorized a $30,000 contract for 2026 bridge inspections, advanced a zoning ordinance amendment review for cannabis with a new setback condition, approved cloud hosting for land records, and approved funding for the county communications subscriber agreement. The board also entered a closed session for security briefings and reconvened to proceed as directed.
Discussion Points
•Board added a specific setback condition to guide Planning Commission review.
•Board approved funding source but did not specify allocation amounts in meeting minutes.
•Board approved the item as presented; no public comment recorded.
•Board invoked statutory authority to close the meeting for security reasons; reconvened and authorized staff to proceed as directed.
•Consent agenda included multiple standard items; no separate debate recorded.
•County Administrator provided HHS updates earlier in the meeting but no discussion on this item was recorded.
•Public comment period recorded; content not provided in transcript excerpt.
Decisions
•Approve consent agenda and payment of warrants.
•Authorize funding from general fund balance for public safety entities.
•Board authorized contract up to $30,000.
•Board authorized public hearing; no ordinance adopted at this meeting.
•Proceed as directed in closed session.
•TriMin to host records; staff to finalize contract.
Directions
•Planning Commission to hold public hearing and review draft amendments.
•Staff to determine allocation amounts and notify recipient entities.
•Staff to implement direction from closed session as appropriate and report back as allowable.
August 31, 2026, Special Meeting of the Board of Commissioners. Minutes
At a special meeting on Aug. 31, 2026, the Chisago County Board of Commissioners unanimously approved three 2026–2028 labor contracts with Teamsters Local 320 covering Health & Human Services staff, Government Center professionals and engineering technicians. The meeting convened at 7:00 a.m. at the Chisago County Government Center and adjourned at 7:02 a.m.
Discussion Points
•Motion and unanimous vote to approve Teamsters Local 320 contract for engineering technicians.
•Motion and unanimous vote to approve Teamsters Local 320 contract for Government Center professionals.
•Motion and vote to approve the 2026–2028 Teamsters Local 320 Health and Human Services contract
August 19, 2026, County Board of Commissioners Meeting. Minutes
Chisago County Board of Commissioners approved an HRA-EDA levy for FY2027, granted a Conditional Use Permit for a major home occupation (auto restoration) in Franconia Township with conditions, approved several grants and contracts including a groundwater report agreement and prescribed fire work, and approved multiple personnel and capital items before adjourning to a closed session on labor negotiations.
Discussion Points
•Board approved lobbying contract; one commissioner opposed.
•Board debated payout thresholds for non-union vacation and compensation time accruals; dissent recorded from two commissioners on the vacation payout motion.
•Findings of consistency with Comprehensive Plan and Zoning Ordinance; screening and setback compliance (40 feet) and the accessory structure size (~4,000 sf) were emphasized.
•Groundwater report professional services and prescribed fire contractor authorization presented; specific budgets and scopes were not included in minutes.
•HRA-EDA representatives addressed the Board during Citizen’s Forum.
•Motion to approve VFD installation and funding source cited as undesignated 2026 CIP funds.
•Project updates presented by County Engineer Joe Triplett.
Decisions
•Contract approved; staff to execute.
•Contracts authorized; staff to implement.
•CUP approved with nine enumerated conditions, including a 6' privacy fence and annual certification.
•Levy resolution approved 4–1.
•No formal action taken; related items moved to consent agenda.
•Vacation payout policy approved (with recorded opposition); AFSCME contract approved; Board closed meeting for labor negotiation strategy and later reconvened to proceed as directed.
•VFD installation approved unanimously.
Directions
•Execute grant and professional services agreements as authorized.
•Staff to implement payout policy for non-union employees who choose to be paid over the minimum threshold.
August 06, 2026, Planning Commission Meeting. Minutes
Chisago County Planning Commission approved a Conditional Use Permit for a Major Home Occupation at 26781 Olympic Trail with amended screening and removed a septic-inspection condition; it continued a Floodplain Management Ordinance hearing to Sept. 3, 2026 and heard County Board liaison reports on a 12‑month data center moratorium and a property abatement.
Discussion Points
•Board adopted moratorium on data centers
•Board approved abatement of hazardous property in Rushseba Township
•No public testimony at this meeting; staff capacity limited by labor strike
•Whether proposed fencing/screening was necessary given building elevation and existing vegetation
•Whether septic system warranted compliance inspection based on proposed use and owner statements
Decisions
•Actions reported to the Planning Commission for information only
•Adopted recommendation for CUP approval with amended conditions and removal of septic-inspection requirement
•Hearing continued to Sept. 3, 2026
Directions
•Forward adopted recommendation and resolution to County Board for final action
•Permit holder must obtain state/county permits and certify annually
•Staff to finalize draft ordinance for next hearing
August 05, 2026, County Board of Commissioners Meeting. Minutes
Chisago County Board enacted a temporary moratorium on data centers, ordered abatement of a property found to be a public nuisance at 52168 Government Road, approved multiple final plats and consent-agenda items including $5,552,823.81 in warrants, and convened a closed session on labor negotiations.
Discussion Points
•Applicant and title evidence recorded; Planning Commission had recommended approval.
•Applicant provided title evidence; Planning Commission previously recommended approval.
•Board determined conditions met statutory criteria for nuisance abatement under Minn. Stat. §145A.04 and county ordinance.
•Conditions include required permits for wetland impacts and conformity with the preliminary plat.
•Conditions include required wetland permits and conformity to the approved preliminary plat.
•Resolutions to authorize county VISA accounts and accept donations were included.
•Short public hearing with three speakers; county will study zoning and infrastructure impacts before permitting data centers.
•Staff described observed waste and contamination conditions; a 10-day notice had been served to occupant David Anderson who had not fully abated.
•The consent agenda included a wide range of routine administrative and financial actions; warrant total recorded as $5,552,823.81.
Decisions
•Consent agenda approved unanimously.
•Final plat approved subject to listed conditions.
•Interim moratorium enacted; ordinance number and detailed text to be finalized and published.
•Resolution 26/0805-6 adopted, authorizing abatement and cost recovery.
Directions
•Any deviations prior to recording require further review.
•Clerk to post itemized claims list on county website per statute.
•Deviations before recording require further review.
•If owner/occupant fails to reimburse, costs to be certified as a lien or special assessment.
•Staff directed to abate the site immediately and seek recovery of costs.
•Staff directed to review permitting, utility capacity and zoning implications and report back.
Chisago Lakes Lake Improvement District (LID) met on Aug. 3, 2026. The board approved the agenda, consent agenda and invoices, accepted staff reports on invasive phragmites, carp tracking and water-quality monitoring, approved a $1,000 donation to the Chisago County Children’s Water Festival, and adjourned.
Discussion Points
•10 lakes received A ratings
•23 of 33 lakes meet MPCA standards
•$50,000 grant to create countywide groundwater report
•$75,000 Conservation Partners Legacy grant secured
•EDDMaps Pro training for staff
•Ivywood corridor retreatment to be paid by LID (drone or backpack)
•PIT station moved to County Rd 20 bridge because channel was dry
•Removal tactics planned including baited box nets and acoustic tags
•Report follows 2025 scoping document; plan to follow the report
•Routine approval of agenda and consent items
•Sunrise Lake top in 2025 snapshot
•Support for local outreach and children's water education
•Telemetry ongoing on five study lakes
•Veliger tow results pending
•Workgroup to remind Sewage Treatment Commission on Aug. 17
Decisions
•$1,000 donation approved
•Consent agenda adopted; invoices approved
Directions
•Staff to be trained on EDDMaps Pro and to conduct surveys in August
July 30, 2026, Board of Adjustment and Appeals Meeting. Minutes
On July 30, 2026 the Chisago County Board of Adjustment & Appeals approved Variances to allow creation of an approximate 25-acre double-frontage parcel (PID 07.00469.00) in Rushseba Township and to exempt the resulting remainder parcel from platting despite a substandard width of approximately 340–350 feet. The board voted unanimously to adopt Resolution BOAA2026-0701 with five conditions limiting driveway access, requiring separate parcel IDs for noncontiguous tracts, and a one-year use window for the Variance.
Discussion Points
•Applicant cited topographic constraints (bluff) as primary reason for James Avenue access and inability to use Government Road / CR 57 access.
•Conditions intended to mitigate impact of substandard width and address access/erosion concerns from Government Road bluff.
•Rushseba Town Board recommended approval and Technical/Plat Review committee had no immediate concerns.
•Staff presented practical‑difficulty justification addressing uniqueness, reasonableness, and essential character; noted alternate remedies (reconfiguration or platting) had been explored and rejected by owner.
•Staff recommended parcel ID split to avoid single tax parcel with noncontiguous tracts.
Decisions
•Board adopted Resolution BOAA2026-0701 approving the Variances with five conditions; motion passed unanimously (5–0).
•Board approved conditions 1–5 as written; Variance may be used once within one year or lapses.
Directions
•Department of Environmental Services to require subdivision per condition 2 and assign unique parcel IDs.
•Department to enforce conditions and require Board review for significant deviations.
•If Variance used, Department of Environmental Services must require creation of two separate parcel IDs for remainder tracts west of Government Road / CR 57 and east of James Avenue.
July 15, 2026, County Board of Commissioners Meeting. Minutes
The Chisago County Board of Commissioners met July 15, 2026, and unanimously approved multiple land-use actions including interim use and preliminary plats, authorized funding and purchases for wetland credits supporting the Swedish Immigrant Regional Trail, approved a temporary staffing contract, and directed staff to prepare a 12‑month moratorium on data center development with a public hearing set for August 5, 2026.
Discussion Points
•Chisago Lake Town Board commented that a road easement could satisfy requirements instead of dedicating right‑of‑way; Planning Commission recommended approval with conditions.
•clarifying_details':[{
•Committee recommended purchasing wetland credits to support trail project funding; Board accepted report and authorized purchases and grant application.
•decisions':['Preliminary plat approved with conditions.'] },
•directions':['County to finalize wetland delineation and require permits prior to final plat submission.'],
•Motion to direct staff to prepare 12-month moratorium on data center development made by Commissioner Swenson and seconded by Commissioner Dunne.
•Multiple routine and substantive items were approved, primarily unanimously.
•Planning Commission conducted public hearing July 2 and recommended approval with conditions; Chisago Lake Town Board recommended approval June 16.
•Planning Commission held a public hearing on July 2 and recommended approval; Shafer Town Board recommended approval on June 11 with no comments.
•Planning Commission recommended approval; Franconia Town Board recommended approval with no comments; Board made findings per Zoning Ordinance Section 8.05.
Decisions
•All listed items were approved as recorded in the minutes.
•Designated funding and authorized purchases; motion approved unanimously.
•Directive approved unanimously; no ordinance adopted at this meeting.
•Interim Use Permit approved with enumerated conditions; permit expires when principal structure is built.
•Preliminary Plat approved with conditions.
•Preliminary plat approved with explicit wetland and easement conditions.
Directions
•Applicant to provide and record easement; County to finalize wetland delineation review prior to final plat.
•Applicant to submit final plat within one year or request extension.
•Permit holder must obtain driveway permit and annually certify ongoing compliance.
•Staff to implement actions where specified (e.g., draft ordinance, negotiate purchases, proceed with permits).
•Staff to negotiate additional wetland credit purchases and prepare State Legacy Grant application.
•Staff to prepare interim ordinance and publish public hearing notice for Aug. 5, 2026 at 7:00 p.m.
The Chisago County Water Plan Policy Team met July 13, 2026, and recommended removing Appendix D from the Lower St. Croix Comprehensive Watershed Management Plan, discussed a $50,000 MDH groundwater grant and a $75,000 DNR phragmites treatment grant, reviewed aquatic invasive species work and monitoring numbers, approved member travel to an upcoming water workshop, and heard agency updates including a boat replacement and Comfort Lake being delisted.
Discussion Points
•2027 County budget planning; grants totaling over $125,000 secured; County Board approved Water Resources boat replacement (~$30,000); Comfort Lake delisted from Impaired Waters List; 66 acres of curly leaf pondweed treated on Center Lakes.
•Authorization to send citizen members to an off-site workshop; promotion of volunteer events.
•Award of $50,000 MDH Accelerated Implementation Grant for groundwater report; plan for phased development and consultant engagement.
•Award of $75,000 DNR Conservation Partners Legacy grant for phragmites treatment; summary of AIS inspection and monitoring activity.
•Review of LSC CWMP 10-year goals and outcomes; assessment of Appendix D items for completion and relocation.
Decisions
•Approve travel for up to five citizen members
•Recommend removal of Appendix D and integration of Goal LK 2C into Goal #34.
Directions
•Continue inspections at launches through October; process reimbursements for approved AIS treatment grants by year-end.
•Continue tracking grant spending and treatment outcomes.
•Forward recommendation to LSC Policy Committee for consideration during 2027 plan update.
•Staff to register attendees and recruit volunteers for the Children's Water Festival.
•Staff to work with EOR to define needs and actionable items for the groundwater report.
July 02, 2026, Planning Commission Meeting. Minutes
Chisago County Planning Commission reviewed multiple preliminary plats and permits, continued a large conditional-use request for Sno-Baron's event venue after extensive public comment, recommended a one-year moratorium on data centers for zoning, and continued a floodplain ordinance amendment hearing.
Discussion Points
•Applicant acknowledged additional soil testing would be required for Lot 4 driveway area.
•Applicant awaiting township driveway permit.
•Applicant present; no Commission questions.
•Applicant revised plat to remove ROW dedication and provide recorded easement.
•Applicants reduced maximum festival attendance from 15,000 to 3,500 and clarified that up to 15 annual events were requested.
•Commission concluded a temporary moratorium would allow staff to prepare zoning regulations.
•Commission continued the hearing to allow staff further review.
•Commission discussed legal and jurisdictional considerations for data centers and referenced federal court guidance.
•Director Schneider requested the record be kept open; no public attendees spoke.
•Numerous residents reported past Hay Days impacts, traffic delays, noise, and enforcement concerns.
•Staff confirmed soils and wetland delineation verification; Shafer Town Board recommended approval.
•Staff confirmed structure meets AG setbacks and Franconia Town Board supported the request.
•Staff reported soils verification and pending wetland delineation; county highway department approved driveway locations; Town Board recommended approval.
•Town Board comment: 'Road could stay as-is. Easement needs to be recorded in plat.'
•Town Boards recommended denial; Sheriff recommended event-specific security plans and cost recovery for extraordinary enforcement calls.
Decisions
•Commission recommended approval of Preliminary Plat via Resolution PC2026-0701 (7-0).
•Public hearing continued to allow time for additional details and Town Board review.
•Public hearing continued to Aug. 6, 2026 (7-0).
•Recommended approval of IUP via Resolution PC2026-0702 (7-0).
•Recommended approval via Resolution PC2026-0703 (7-0).
•Recommended approval via Resolution PC2026-0704 (7-0).
•Recommend one-year moratorium to County Board (7-0).
Directions
•Applicant to complete wetland delineation and obtain required permits prior to final plat application.
•Applicant to record easement at Final Plat and secure Town Board endorsement.
•Commission requested written questions be submitted to staff by July 9 for forwarding to applicants and continued the public hearing to Sept. 3, 2026.
•Permit holder to obtain driveway permit prior to applying for a building permit; annual certification required.
•Proceed to County Board consideration under standard conditions.
•Staff to draft moratorium language and proposed zoning regulations for County Board consideration.
July 01, 2026, County Board of Commissioners Meeting. Minutes
Chisago County Board of Commissioners met July 1, 2026; the board approved the consent agenda (including $5,556,469.43 in warrants), authorized trail grant agreements, disapproved a petition for a subordinate service district at Liberty Ponds and directed staff to investigate alternatives, approved multiple road contracts and service agreements, added Commissioner Montzka to an interagency JPA, and met in closed session on labor negotiations.
Discussion Points
•Approval of consent items including warrants payment of $5,556,469.43.
•Board closed the meeting under statutory authority to consider labor negotiations and reconvened to act on direction from closed session.
•Continuation of education services, inmate boarding and SRO services were approved.
•Contracts approved for pavement work and trail reconditioning.
•Motion to add Commissioner Montzka to ECRLB JPA Committee.
•Trail reconstruction covers 2.1 miles and follows a master plan approved in 2015.
•Two public speakers addressed the petition during the hearing.
Decisions
•Agreements authorized
•Closed session authority invoked; board proceeded as directed.
•Consent agenda approved
•Contracts awarded to Fahrner Asphalt and Dresel Contracting
•Montzka added as representative
•Petition disapproved
•Resolution adopted to accept grant and proceed with Segment E reconstruction.
Directions
•Parks Director delegated authority to execute and administer grant.
•Proceed as directed in closed session.
•Staff directed to investigate options for the subordinate service district and wastewater improvements.