The Pike County Board of Commissioners is scheduled to consider claims, bids, agreements and other county business at its regular meeting on Nov. 16, 2026.
The Pike County Council met Nov. 10, 2026, with an agenda that included multiple transfer and additional-appropriation requests across county funds, a surveyor request for Cornerstone Replacement funding that identified an $8,050 shortfall, and routine department reports and appointments. The council was scheduled to consider those requests during its regular meeting.
Discussion Points
•Multiple departments submitted headers for additional-appropriation and transfer requests across county funds; only the Surveyor item includes substantive figures in the provided pages.
The Pike County Board of Commissioners was scheduled to open bids for 2027 materials and supplies and consider highway transfers, hiring items, an AME maintenance quote, opioid settlement business and other matters.
The Pike County Board of Commissioners approved budget transfers and appropriations, considered a community center’s structural damage, and heard department updates. The meeting was held Oct. 19, 2026; the minutes record no formal decision on the community center.
Discussion Points
•Abbott-Knight said the budget had not anticipated rising contract-hauling costs.
•Byrd described paving and planned roadwork, the timing of Buttermilk Road work, mine-shaft concrete work, fuel contracting and asphalt prices.
•Cook described structural damage and reported that the insurance company would not cover repairs.
•Dischinger described the GIS-layer request as standard and said the county would receive $250 after project completion.
•Dischinger said the workers’ compensation invoice covered 14 months while the budget calculation was based on 12 months.
•Gumbel confirmed that gas-tax-holiday money was coming in.
•McKinney reported that two Sheriff’s Office employees would leave on Oct. 23.
•Misty Coleman said the scanner agreement had been corrected with the County Attorney’s help and required commissioners’ approval before finalization.
•President Flint asked whether commissioners had questions on either item; none were recorded.
•She said Microsoft charges had increased and requested money for 40 hours of paid-time-off sellback.
•The auditor and treasurer were scheduled to meet with Arevon about taxes not yet paid on a project and with landowners.
•The commissioners had contacted Region 15 to assist with a plan for evaluating repair or replacement.
•The sheriff reported two departures effective Oct. 23.
•Young explained that the county could opt out without penalty when notified before the ambulance was put online to build.
•Young said fuel costs had inflated significantly and requested additional funding.
Decisions
•Claims dated Oct. 22 were approved 2-0.
•Commissioners approved $11,500 in additional appropriations 2-0.
•Commissioners approved permission to bid 2-0.
•Commissioners approved the $800 courthouse water transfer 2-0.
•Commissioners approved the $9,400 in transfers 2-0.
•Commissioners approved the GIS-layer request; the minutes do not separately state its tally.
•Commissioners approved the scanner rental agreement 2-0.
•The commissioners approved the $30,000 appropriation 2-0.
•The commissioners approved the $3,000 in transfers 2-0.
•The Oct. 8 meeting minutes were approved 2-0.
Directions
•Steve Marchand agreed to help find funding for the project.
Pike County Board of Commissioners met Oct. 5, 2026, and approved routine minutes, claims, multiple budget transfers and appropriations including an EMS personnel transfer and a $51,665.33 additional appropriation for 911 dispatch staffing; the board also approved security upgrades, accepted CD reinvestment recommendations, and heard reports from highway and EMA officials.
Discussion Points
•$430,000 AES payment restricted to roads used during cart road project; county preparing roads for winter.
•Bi-annual VA report presented; no follow up.
•Cybersecurity exercise provided templates; election booths not networked; FEMA coordination for tornado recovery and possible log clearing discussed.
•decisions
•directions':['Monitor contractor schedule for Hwy 64, confirm AES payment processing.'],
•Routine approval of minutes and claims; no substantive debate recorded.
•Security upgrades are in the 2027 budget but a 2026 additional appropriation was requested to move the work earlier if approved.
•Spreadsheet error omitted full wages for a dispatcher position during budget advertising.
•Transfers requested to clear EMS budget lines for remainder of year.
Decisions
•Additional appropriation approved (3–0)
•Claims approved (3–0)
•Keusch Glass awarded contract; metal detector approved; cameras/access control contingent on appropriation.
•Minutes approved (3–0)
•Transfers approved (3–0)
Directions
•If Council approves the additional appropriation on Oct. 13, the 2027 budget request will be removed.
•Monitor contractor schedule for Hwy 64, confirm AES payment processing.
•Record appropriation and notify County Council for review on Oct. 13.
•Set up one-stop assistance with Winslow; coordinate with FEMA and utilities for training and debris concerns.
September 22, 2026 County Council Budget Hearing #2 Minutes
Pike County Council heard budget presentations from Jefferson-Marion Township Fire District and Patoka Township Fire District on Sept. 22, 2026; both districts presented their proposed budgets and estimated maximum levies; the council set a budget adoption meeting for Oct. 13 and adjourned by motion.
Discussion Points
•Angela O'Neil presented line-item increases and totals.
•President Craig called the meeting to order and set handling rules for budget items.
•President Craig invited questions; none were raised.
•Robin Whaley presented budget details and line-item increases.
•Two township fire district treasurers presented budgets; no council questions were recorded.
Pike County Council met Sept. 8, 2026. The council declined to move three resolutions that would have waived filing deadlines for Ratts 1 Solar abatements after public discussion and an $800,000 supplemental payment offer; it approved funding for the RISE peer-recovery program, filed for a $1M CCMG road grant with a $250,000 match, approved courthouse security priorities, and adopted several appropriation and transfer measures.
Discussion Points
•Addition of three positions (part-time administrator, director, enforcement officer) and adjustment of part-time hours for an Environmental Specialist.
•Administrator clarified the $500/month administrator pay was limited to remainder of 2026.
•Arevon failed to file required CF-1 and certified deduction forms by statutory deadlines; company offered $800,000 plus $130,000 in exchange for a waiver.
•Baker Tilly invoice related to new TIF calculations required a transfer.
•CCMG request amount and county match ($1,000,000 grant / $250,000 match).
•Council considered staffing and equipment changes and recorded a 6-1 vote.
•Council weighed immediate new revenue against longer-term tax-rate effects and previous assessed-value losses.
•Eckerle explained assessed-value and tax-rate dynamics and provided township-level estimates of abated assessed value and rate impact.
•Federal bridge inspection compliance increases requiring additional inspection work and funds.
•Five security priorities requested by the state were enumerated by Sheriff McKinney.
•Funding mix proposed: opioid funds and Prosecutor's Grant funds; Auditor flagged procedural timing for appropriations.
•K-9 veterinary costs required a transfer and were approved.
•Laredo service fee increases and recorder's shortfall.
•Program participation (~76 inmates) and recidivism improvement metrics (22% over 12 months, 14% over six months).
Decisions
•Appropriations and transfers approved; one transfer stricken after State Board of Accounts clarification.
•Approved Wage and Salary ordinance changes 7-0.
•Approve letter of intent (6-1).
•Approve MOU retroactive to Aug. 1, 2026; motion carried 7-0.
•Council authorized filing and match commitment (7-0).
•No motion was made; the resolutions died and abatements will not be granted.
Directions
•Arevon to coordinate with school corporation and county staff on outstanding items (not a formal requirement of council action).
•Auditor to process pay adjustments and ordinance updates.
•Auditor to process transfers and appropriations; departments to submit needed invoices and documentation.
•Complete appropriation advertising/paperwork to allow formal budget execution.
•Highway Department to file application and proceed with match planning if award occurs.
•Sheriff’s office to coordinate with county administration on implementation planning.
September 8, 2026 County Council Budget Hearing Minutes
Pike County Council held a budget hearing on Sept. 8, 2026 to review department budgets, discuss several staffing and capital requests, and set motions on a 3% cost-of-living adjustment and other pay-structure items ahead of final adoption in October.
Discussion Points
•3% COLA proposal with statutory exceptions
•Advertising error for two binding budgets
•Deputy-auditor $500 structural request
•Formation of committee to examine pay-structure issues
•Formation of committee to review pay-structure
•Healthcare contract and medication cost increases for jail
•High-mileage vehicles and compatibility issues for recycling equipment
•One-time $9,500 IT professional services request
•Overtime increase linked to changing to 12-hour shifts
•Possible DNR grant to fund a shelter house
•Process for consensus and motions to increase/reduce line items
The Pike County Board of Commissioners met Sept. 8, 2026, and approved routine business, several personnel and contract actions, and funding for a prosecutor-backed RISE reentry program. The board also approved a letter of intent to add courthouse security measures requested by the state and heard brief reports from highway and emergency management staff.
Discussion Points
•AES to provide ~$300,000 for paving where solar panels were installed.
•Appointment of Adam Boyd approved.
•Baker Tilly's TIF work required additional funds.
•Board approved updated contract.
•Bridge inspections completed with no critical findings; two bridges planned for 2027.
•Britton explained federal changes to inspection requirements.
•Cards and phone assignments needed after Solid Waste District dissolution.
•Funding available in old jail management system; purchase via State master contract.
•Funding sources: $61,000 opioid funds, $10,000 Prosecutor's Grant; contract retroactive to Aug. 1.
•Goble presented candidate pool and recommendation to hire Lundy.
•List compiled from motions recorded in the transcript.
•Public comment about data center conference and potential local benefits.
•Recidivism improved: 22% at 12 months, 12% at 6 months vs historical 33%.
•Sheriff McKinney listed five state-recommended security measures to be added in 2027.
•Transfer of $2,660 due to omitted Contract/Haul account.
Pike County Council on Aug. 18, 2026 approved a $7.50 local option wheel tax ordinance to preserve Community Crossings grant eligibility, tabled a waiver request from Arevon over late abatement filings while authorizing consultants, approved a Jefferson‑Marion Fire District truck appropriation, dissolved the Solid Waste Management District and moved its tipping‑fee fund into county control, and declined to approve moving a detective position to the Prosecutor for lack of a second.
Discussion Points
•Appropriations to Fund 1194 will fund solid waste operations after dissolution.
•Appropriations were listed across multiple line items to staff and operate the function under county control.
•Arevon missed statutory UD‑ERA and CF‑1 filing deadlines for two project phases; audited assessed values and abatement amounts were presented.
•Auditor fund will pay True Roll contract to search for ineligible homestead claims.
•Clerk postage costs rose (certified mail $12.85/piece); weekly volume led to the $5,500 request.
•Council had no public opposition during hearing.
•District needs a replacement truck; total cost $633,881 and a $250,000 donation in hand.
•District operations to be funded by tipping fees rather than a tax levy.
•Prosecutor cited Detective Arnold's caseload and contributions (114 cases over two years).
•Sheriff Elect Buck Seger and Sheriff McKinney argued losing the position would reduce patrol manpower across 500 square miles and increase overtime pressure.
•Stakeholders debated whether to allow a late filing and grant abatements when private taxpayers receive penalties for late filings.
•State guidance requires wheel tax or surtax to preserve Community Crossings eligibility; council chose $7.50 flat rate for passenger vehicles.
Decisions
•Appropriations and transfers approved; resolution 2026-18 adopted.
•Motion to appropriate funds for transfer died for lack of second; transfer unresolved.
•Motion to table the waiver passed 7-0; engagement letters approved.
•Ordinance 2026-15 adopted 7-0.
•Resolution 2026‑17 approved 6-0 with one abstention.
•Resolution 2026‑19 approved 7-0 and associated appropriations for Fund 1194 adopted.
Directions
•Commissioners previously approved transfer at their meeting, creating an inter‑branch coordination issue.
•County staff to implement collection procedures and coordinate with municipalities.
•County to record appropriation and district to proceed with procurement.
•Departments to implement appropriations and report expenditure status at upcoming budget workshops.
•Engage Ice Miller and Baker Tilly to represent the county and complete an impact analysis.
•Implement Fund 1194, move deposits and staff into county payroll and operations, and report back to council.
•Negotiate financial terms with Arevon before council acts on waiver.
•No appropriation approved; Prosecutor to include position in 2027 budget if pursuing transfer.
Commissioners' Meeting Minutes 8/17/26, signed 9/8/26
Pike County Board of Commissioners meeting where members approved minutes and claims, heard a Purdue Extension restructuring presentation, approved legal engagement letters for the Ratts project, approved health and highway additional appropriations, and adopted a disaster proclamation after a Winslow tornado.
Discussion Points
•Approved $4,000 for bridge reinspection and $25,000 for equipment repair
•Auditor reported missed reporting dates by Arevon and parcel boundary complications
•Board agreed to retain outside counsel and accounting advisors to resolve compliance issues
•Board approved the additional appropriations unanimously
•Damage counts: seven destroyed homes, five major, six minor, 22 affected
•Overview of Purdue Extension's 3-year restructuring and regional leadership model
•Purdue to cover program mileage, advertising, and supplies while county retains office manager support
•Red Cross assisting; mutual aid from neighboring EMAs
•Requested $17,500 additional appropriations for Fund 1161 with itemized line allocations
•Staffing and funding approach: educators paid by county population, reevaluation every two years
•Superintendent Byrd summarized storm cleanup, bridge repair needs, and upcoming paving requiring short closures
•Tornado touched down in Winslow Aug. 12 at 4:09 p.m.; path ~1 mile by 250 feet
Decisions
•Adopt Disaster Proclamation
•Approve additional appropriations
•Approve engagement letters with Ice Miller and Baker Tilly
•Approve highway additional appropriations
Directions
•Consultants to continue review and report back to board
•File disaster proclamation with state; track department time and expenses for reimbursement
•Highway staff to schedule inspections and coordinate temporary closures for paving
Pike County Council met July 14, 2026. Council approved several budget adjustments and resolutions including updated minimum fund balances and designation of fire departments to receive Public Safety Local Income Tax; the meeting included discussion of Winslow sewer needs, RATTS Solar payments, proposed budget increases, and multiple transfers and appropriations.
Discussion Points
•Craig presented percentage and dollar changes for multiple budget lines and a total Commissioners' request of $4,024,660.
•Dischinger outlined major budget items spanning general fund and special funds including courthouse repairs, security updates, server replacement and Solid Waste transition.
•Highway requested $5,775 from scrap sale for pickup purchase; EMS needed funds to pay MALCON and insurance increases for an ambulance remount; Sheriff requested $20,000 for vehicle maintenance/repairs and noted typical annual expenses of $40–45K.
•Judge's letter stated previous contract was 2.5 days (18 hours); new contract is 3 days (21 hours/week, 1,092 hours/year).
•President Craig explained the annual designation requirement and listed recipient fire departments.
•RATTS Solar Projects are active; abatements begin in 2027; county received some tax revenue in 2026; $200,000 economic development payment expected.
•Recruitment difficulty for qualified referees was noted.
•The sheriff appropriation vote was 4-2 in favor; two council members voted nay.
•VS Engineering performing CCTV to determine condition of sewer lines; estimated project cost ~$4.5 million; Winslow requested $250,000 interlocal contribution.
Decisions
•Adopted Resolution 2026-03 to designate public safety LIT recipients.
At its April 6, 2026 meeting the Pike County Board of Commissioners approved several appropriations and resolutions, including a redevelopment resolution amendment, authorization for Ride Solutions to access 5311 funds, highway additional appropriations, and a health department bioterrorism grant appropriation. Commissioners tabled a decision on a new county website pending further review and budget clarification.
Discussion Points
•Auditor suggested using server budget funds to avoid an additional appropriation.
•CivicPlus first-year price $21,881 vs REVIZE $11,370; only $2,000 currently budgeted for website.
•County Administrator Kristi Dischinger had interviewed three vendors and preferred CivicPlus.
•EDC Director Ashley Willis identified duplicate and incorrect parcel numbers, including five parcels listed in both Pike Crossing at I-69 and the new TIF.
•Grant had been approved previously but never appropriated; funds must be spent by June.
•INDOT requires a county authorizing resolution for Ride Solutions to serve Pike County and use 5311 funds.
•Line items included office furniture ($12,000) and several operational categories.
•Multiple CCMG 2024-1 project line items were adjusted to address underruns.
•Specific line-item requests included Frontier pole repair, fuel refund professional services, and use of salvage funds for equipment.
•Timeline constraints: final date Dec. 31 and cut-off for additions in October.
Decisions
•Board approved the authorizing resolution 3-0.
•Commissioners approved the additional appropriation totaling $20,000 3-0.
•Commissioners approved the confirmatory resolution amendment (RDC2026-02) 3-0.
•Commissioners approved the highway additional appropriation requests 3-0.
•Decision on county website tabled to a future meeting
Directions
•County to sign authorizing resolution and include Pike County in the grant paperwork.
•EDC to update records to reflect corrected parcel numbers.
•Health department may proceed with purchases and must spend funds within grant timeline.
•Highway Department to implement budget line changes and report per normal accounting procedures.
•Staff to return with more detailed vendor comparisons and funding options for the next meeting.
Pike County Board of Commissioners met March 16, 2026, approved routine business including meeting minutes, claims, an INDOT amendment for Bridge 30, and renewal of EMS insurance; commissioners heard reports from veterans services, Region 15, PAWS and county departments and directed staff on several administrative matters.
Discussion Points
•Council requested beginning PAWS balance and segregation of donations.
•County website procurement and server replacement were discussed but deferred for further information.
•Operational updates on ambulance repairs, jail lighting, generator upgrades and highway projects.
•PAWS budget and request to separate county support from other donations.
•Rapidly rising server prices and supply constraints for AI-capable components.
•Region 15 grant totals to Pike County and cumulative fees.
•Several departmental operational updates (EMS, EMA, Sheriff, Highway).
•Vendor options and costs for replacing the county website.
Decisions
•Approve County Administrator 4x10 schedule.
•Approve health department appropriation and EMA salary grant.
•Approve INDOT amendment for Bridge 30 and EMS insurance renewal.
•Health Department PHEP BP2 appropriation approved.
Directions
•County Administrator to return with vendor recommendation for the website and more information on the server quote and vendor prepayment terms.
•PAWS to provide beginning balance and segregate donations; staff to follow up on generator and ambulance repairs and report back.
•PAWS to provide beginning balance and to segregate county support from other donations.
•Staff to gather more pricing detail, vendor terms, and confirm whether quotes will be honored; consult with Council before purchase.
Pike County Board of Commissioners met March 2, 2026; commissioners approved routine minutes and claims, voted to change the county's commercial insurance broker and carrier and to buy workmen's compensation through ASTRA, approved a revised bridge inspection contract, renewed EMS insurance pending equipment additions, and noted a cemetery boundary survey and several departmental reports.
Discussion Points
•Commissioners expressed preference to switch agents and providers based on the comparison and training options.
•Detailed premium comparison presented by County Administrator Kristi Dischinger showed small differences between proposals and a lower workers\u0002comp quote from ASTRA.
•EMS director noted equipment additions will change insurance endorsements and premium.
•FHWA requested additional box culvert inspection scope for bridge contract.
Decisions
•Approved bridge contract revision (3-0); EMS renewal approved (3-0) with final premium to be determined; INDOT amendment tabled.
•Approved change of commercial coverage to Travelers through RT Insurance (3-0).
•Approved purchase of workers\u0002comp from ASTRA through RT Insurance (3-0).
Directions
•County staff to finalize EMS endorsements and to research cemetery fence/property line discrepancy.
•Staff to finalize contracts and endorsements with RT Insurance/Travelers and complete ASTRA enrollment and any endorsements for county property or vehicles.
Pike County Board of Commissioners reviewed competing countywide insurance proposals, approved a $558,297 bridge inspection contract, authorized several EMS- and finance-related vendor contracts, and approved three condemnation settlements. Several routine approvals (minutes, claims) and budget/auditor updates were recorded; multiple insurance decisions were deferred to early March.
Discussion Points
•Comparison of EMC (Hilb) renewal vs RT/Travelers package; major premium differences and coverage line items
•Contingent-fee structure of Malcon contracts and caps
•EMS insurance premium increase and request for consolidated quote
•Implications for right-of-way ownership and immediate project scheduling
•Inspection schedule (4-year cycle) and contract maximum
•Mediator-negotiated settlement amounts and appraiser awards
•Start/end dates and contractor responsibilities
•Stryker maintenance costs and contract term
•Unclear duplication of some property/boiler values in RT packet; workers' compensation pricing not included in RT total
Decisions
•All three contracts approved 3-0
•Contract approved 3-0
•Settlements approved 3-0
Directions
•Staff to obtain consolidated EMS insurance quote for next meeting
•Staff to reconcile duplicated line items and produce combined, comparable quotes including worker's compensation for the March meetings
Pike County Board of Commissioners met Feb. 2, 2026, and approved routine business including minutes, claims, several contracts and appointments. Key decisions included accepting a $31,000 bid for a courthouse condition assessment that exceeded the $25,000 budgeted amount, initiating dissolution proceedings for the Solid Waste Management District, and approving an ADA/Title VI policy update required for INDOT contracting.
Discussion Points
•Bid for courthouse assessment was $6,000 over the budgeted amount of $25,000.
•Board chose to accept Lamar Architecture & Design's proposal and address funding separately.
•CEDIT additional request to be forwarded to council in March.
•Failure to file would affect INDOT contracting eligibility.
•Officials stated tipping fees should prevent added county costs.
•Process expected to take at least six months.
•Routine agenda items and approvals.
•Solid Waste Board proposed dissolution; Allen County cited as precedent.
•Update is annual and largely unchanged; minor wording changes.
The Pike County Board of Commissioners met Jan. 20, 2026, approved routine minutes and claims, accepted a CHIRP grant, authorized advertising and a draft contract for 2026 CCMG road projects, released Arevon development bonded roads after receipt of $1,380,950, approved revisions to several employee policies and a credit-card policy, confirmed a four-day schedule for the courthouse matron, and made multiple board and commission appointments. Commissioners heard updates from economic development, EMS, the sheriff and courthouse maintenance.
Discussion Points
•Counts of prospects and site visits; housing projects and trail open house; infrastructure/geotech work for Shell building project; workforce development partnerships.
•Employee handbook introductory period change from 910 hours to six months; travel policy updates; bereavement recordkeeping; overtime weighted-average clarification.
•Rationale for changing introductory period from an hours-based calculation to a calendar-based six-month period; travel reimbursement thresholds; need for written bereavement records by elected officials/department heads; overtime calculation for dual-department employees.
Decisions
•CHIRP grant accepted; CCMG bidding authorized; Arevon bond roads released; handbook and credit-card policy revisions approved; matron schedule approved; appointments approved.
•Handbook revisions approved 3–0.
Directions
•County Administrator to circulate highlighted handbook edits; Auditor to adopt enforcement procedures and recordkeeping for bereavement.
•County Administrator to circulate highlighted handbook edits to commissioners; County Auditor to receive written credit-card requests and monitor fraud; County Administrator authorized to sign CCMG contract electronically when docu-sign arrives.
•Decisions include adopting the six-month introductory period and clarified overtime calculations.
Pike County Board of Commissioners reorganized leadership, approved routine year-end EMS budget transfers and several appointments, and heard departmental updates on roads, courthouse repairs and emergency communications at its Jan. 5, 2026 meeting.
Discussion Points
•Reorganization of board leadership; budget transfers to cover year-end EMS payroll/benefits liabilities; roadway preparations for Next ERA and AREVON projects; courthouse tuckpointing status; EMA backup station planning; need for a visual barrier at jail entrance following demolition.
Decisions
•Elected board president and vice president; approved minutes and claims; approved EMS transfers; approved 2026 appointments; adjourned.
Directions
•No new direction beyond approval of transfers and appointments; staff to continue culvert installations and courthouse finishing work as described.
The Pike County Board of Commissioners met Dec. 15, 2025, and approved a resolution establishing the Petersburg Economic Development Area and associated allocation areas, awarded a reassessment contract, accepted multiple contracts and transfers, approved personnel changes in E-911 and EMS, and accepted bids for two ambulances; all motions carried 3-0.
Discussion Points
•Administrator explained managed services and elevator contract comparisons.
•Assessor recommended retaining Reller for reassessment work based on past performance.
•E-911 director explained budget shortfalls and staffing changes leading to hires.
•EMS director explained bid acceptance reserves a build slot and allows cancellation before the build process.
•Financial adviser described allocation area structure and eligible uses including recreational and safety improvements.
•Legal counsel explained the declaratory resolution and its confirmation by the Redevelopment Commission.
Decisions
•Adopted Resolution 2025-32 establishing the Petersburg Economic Development Area.
•Multiple contracts, transfers and hires approved; all votes 3-0.
Directions
•Proceed with contract execution, hiring and scheduled transfers.
•Redevelopment Commission and county staff to finalize project lists and implementation steps.