The Willacy County Commissioners Court canvassed the November 2026 general election and approved a process for requests to use the Heritage and Wellness Center’s multipurpose area. The court also considered adding the center to an electricity account and heard updates about community programs and a screwworm concern.
Discussion Points
•A commissioner asked whether there were notable issues for the county; the transcript contains no specific issue raised.
•AgriLife staff described 4-H meetings, producer meetings and the lack of a conference table in the new space.
•An AgriLife staff member said screwworm activity was moving closer and discussed temperature thresholds that the speaker said could slow or kill flies.
•An election staff member said the compiled returns were included in a canvass report and had been submitted to state officials.
•A staff member said the county already had an energy contract and had sought an update from a company representative.
•Staff described a health expo with turkeys, blood pressure cuffs and food demonstrations.
•The County Judge cited past scheduling conflicts and crowded county meetings in the jury room.
•The County Judge said the request applied to the multipurpose area, not the space where AgriLife was getting settled.
•The County Judge stated that the contract term for this item was 44 months.
•The presenter said about 15 people had signed up.
•The program presenter described a legal-planning series covering wills, trusts and LLCs, with lawyer access for questions and private follow-up appointments.
•The speaker suggested that insufficient cold weather could allow the pest to continue moving south.
Decisions
•The County Judge announced that the motion carried.
•The court approved the canvass as presented.
•The court approved use of request forms for events in the multipurpose area.
Directions
•The County Judge said the court would work with AgriLife on how to facilitate use of the space and address further guidelines later.
The Willacy County Commissioners Court heard concerns about a proposed data center, approved a Tree of Angels proclamation and fire department grant-related actions, and took up opioid-settlement participation, training and executive-session matters.
Discussion Points
•A participant said a 10% vendor discount applied if payment was made before Dec. 1.
•Claims were approved; no amount is given.
•No response from county officials is recorded.
•Participants said the grant reimbursement would be $165,000 at a 95% rate, compared with 90% for the prior truck.
•Silva raised concerns about water availability, project size and revenue, local employment, leaks and wastewater discharge.
•Staff said the county must execute a new participation form when a settlement with a new entity is reached.
•The court entered executive session for legal consultation, litigation, security issues and possible economic-development incentives.
•The exact deadline was garbled and described as late December.
•The memorandum was described as a required step for the grant-related purchase.
•The proposed truck would follow the Santa Monica truck specifications with front-bumper sprayers as an upgrade.
•The transcript records a motion and second on the invoice item but no clear vote result.
•The Victim Assistance Unit described the annual ceremony and its purpose.
Decisions
•No clear decision on the invoice payment is captured in the transcript.
•The court approved claims.
•The court approved entry into executive session and later returned to open session.
•The court approved participation and authorized the county judge to sign and execute the documents electronically.
•The court approved the $26,869.88 contribution by voice vote.
•The court approved the direction for legal review.
•The court approved the memorandum of agreement.
•The court approved the proclamation by voice vote.
•The training request was approved by voice vote.
Directions
•The district county attorney was directed to look into an issue identified as item C.
The Willacy County Commissioners Court discussed county services, grant funding, staffing and construction projects, and approved several administrative and funding actions. The transcript also records presentations on rural health and adult education.
Discussion Points
•A commissioner raised concerns about fairness, advertising and whether the arrangement had been presented clearly.
•AltaCare described its partnerships and work connecting rural residents with available resources.
•An official raised a legal question about using county resources to promote a 501(c) foundation.
•Change order No. 4 added an 80-foot grade beam near the water to support the sidewalk and prevent erosion.
•Change order No. 5 addressed a plan discrepancy requiring regrading of the sidewalk base and parking lot.
•Concerns about FM 1018 and water quality were raised; no completion estimate was provided.
•E-filing was a distinct option and was described as not yet mandated at the justice of the peace level.
•Funding was discussed as contingent on available balances, with capital funds as a possible fallback.
•Officials asked to approve items 11 through 15 together.
•Officials described the $20,000 and $6,000 stipends and position changes as a redistribution of existing funding.
•Officials discussed a Nov. 18 project deadline and access to the TIGER system.
•Officials discussed application access and a Nov. 19 deadline.
•Officials discussed towing, storage, training, procurement and the risk of missing the grant period.
•Officials discussed year-end closing, accruals and adjustments that can affect financial reports.
•Officials said local Lomisa funds were in use after grant funds were exhausted.
•Officials said separate timekeeping was required and duties could not overlap.
•Possible Dream described tuition-free education, career credentials and support services for adult learners.
•Road closure, crossing work, roadway removal and eastbound subgrade work were reported.
•The agreements covered five service areas.
•The award was described as covering 80% of costs, with a 20% county match already budgeted.
•The court discussed schedule delays, contractor coordination and the grant construction deadline.
•The court read a proclamation recognizing National Rural Health Day and AltaCare Foundation.
•The exact grant amount and proposed project were not intelligible in the transcript.
•The existing vendor’s annual rate and projected increase, and a replacement-provider quote, were discussed with inconsistent figures.
•The funding would support victim assistance coordinators, support staff and some protective-order prosecutor salary.
•The judge asked whether prior-year county figures could be used as a dependable reference.
•The landing craft would transport personnel and equipment to beach areas near South Padre Island.
•The opportunity was described as offering $1 million with a zero county match.
•The paperless option would scan documents into case files for all three justice of the peace offices.
•The presenter described funding for DNA and non-DNA testing, including testing for sexual-assault cases, trials and law enforcement investigations.
•The presenter said the grant was fully funded and small, but the amount is not clear.
•The provider transition had been approved at an earlier meeting, but funding source clarification was requested.
•The Sheriff’s Office said it planned to train officers with Texas Parks and Wildlife and the Coast Guard.
•The tax collector said bills had been sent but files for delinquent accounts had not merged correctly.
Decisions
•A motion to approve a plan to pursue the grant opportunity carried.
•A resolution motion was made, but no vote or final outcome is recorded in the transcript.
•The combined motion approving all five agreements carried.
•The court approved $27,237 in capital funds for the price increase, with a stated total purchase cost of $304,137.
•The court approved a $4,200 payment from the general fund following a budget amendment.
•The court approved acceptance of the $174,000 fiscal 2027 award.
•The court approved a motion to list the Possible Dream Foundation on the county website pending legal review.
•The court approved the change orders up to a stated maximum of $28,000.
•The court approved the imaging quote at $9,600 for the first year and $9,000 for each subsequent year.
•The court approved the stipends and position changes in one motion.
•The proclamation recognized Nov. 19, 2026, as National Rural Health Day in Willacy County; no separate vote is recorded.
Directions
•A budget amendment was to be made for payment from the general fund.
•A county official offered to contact the Texas General Land Office for clarification.
•A county official said they would check whether financial reports could be entered or generated before the books were closed.
•Continue negotiating change order costs; stated combined cap was $28,000.
•Staff described the need to obtain access to TDA Go to prepare and submit the pre-application.
•The budget amendment was to move salary and fringe amounts without increasing the overall district court budget.
•The construction contract was extended to Jan. 11, 2027.
•The website listing was approved only pending legal review.
•Verify the purchase complies with procurement rules and grant-period delivery requirements.
Willacy County Commissioners Court held a special meeting on Oct. 29, 2026, approving a short-term road closure for culvert replacement, authorizing a pre-application (2027–28 Texas CDBG) with a $15,000 match commitment and ICE as grant administrator, approving a minor budget amendment, taking executive-session action and returning to conditionally approve a proposal pending county attorney sign-off.
Discussion Points
•Chair recommended $15,000 match to increase prescore points; staff explained TDA prescoring is quantitative and outlined required deadlines and priority tiers.
•Court noted difficulty reaching a participant for an update prior to executive session; attorney presence was discussed as necessary for certain matters.
•Directions were given to proceed to executive session and, upon return, conditionally approve the proposal pending attorney approval.
•Need to replace culverts to allow GLO-funded drainage work to proceed; permit confirmed by staff; estimated closure 4–5 days.
•Short discussion indicated; specifics of line-item changes not recorded.
•TDA prescoring is quantitative; priority tiers include streets, water/sewer, drainage; projects must benefit at least 51% LMI residents; community needs statements should be broad.
Decisions
•Budget amendment approved by voice vote.
•Conditional approval granted; detailed terms to be finalized with counsel.
•Court approved resolution to apply and commit match funds.
•Court approved temporary closure by motion
•Guidance accepted; no further vote required beyond resolution approval.
Directions
•Clerk/Finance to file amendment paperwork and make public records available.
•County attorney to review and approve proposal before execution.
•Prepare resolution and match commitment by Nov. 15 and submit pre-application by Nov. 19.
•Public Works to coordinate with city and contractor on start dates and traffic control.
•Staff to get TDA Go access for grant administrator and finalize community needs worksheet.
•Staff to prepare a broad community needs worksheet and finalize resolution for Nov. 15.
Willacy County Commissioners Court met to consider procurement and administrative items including a proposed new county website for ADA compliance, community event funding, animal-shelter cost concerns, public-safety equipment and IT/cybersecurity contracts; several motions were approved during the session.
Ceremony and ribbon-cutting for the Willacy County Heritage and Wellness Center, funded by a $5,000,000 TDHCA CDBG-CV grant. County officials, including Precinct 3 Commissioner Henry Dela Boss and County Judge Avelio Guena, described the site's purpose — mass vaccination capacity, clinics, and community services — and thanked contractors and grant partners.
Discussion Points
•Center designed for vaccination, clinics, isolation rooms, vaccine refrigeration
•Center seen as a preparedness and resiliency asset
•Funding source identified as TDHCA-administered CDBG-CV award of $5,000,000
•GrantWorks identified as grant manager, Continental Engineering and NM Contracting LLC as project partners
•Judge described frequent coordination with mayors and health authorities during the pandemic
•Officials will coordinate occupancy and schedule details
•Project funded by a $5,000,000 TDHCA CDBG-CV award
•Texas A&M AgriLife Extension will relocate into the facility
•Texas A&M AgriLife Extension will relocate into the facility and provide programming
Willacy County Commissioners Court held a special meeting on Oct. 19, 2026, where commissioners heard that EMS won a $671,887 grant for new heart monitors, accepted a $500,165.70 operations grant from the governor's office, tabled a fundraiser request while considering a facility-use policy, and approved a contract with Live Oak Health for county employee urgent-care services.
Discussion Points
•Commissioner proposed a two‑signature preauthorization for routine nonprofit events to avoid repeated court action.
•Commissioners asked about hours, billing, copays and insurance; Live Oak said it is working on Medicaid and expects to accept Blue Cross.
•Frank Torres announced the $671,887 HHSC grant award and described procurement timing and equipment end‑of‑support in June 2027.
•Live Oak described clinic services including preventive programs and urgent‑care visits.
•Multiple items were recorded as motions and carried by voice vote; transcript did not include roll‑call vote tallies or mover/second names for each action.
•Presenter explained the award amount and that it was reduced from the original request.
•Staff noted the county does not currently have a formal permission‑to‑use form for several county facilities and volunteered to draft one.
•Staff said the grant will fund multiple public‑safety entities and that acceptance must be completed quickly.
•Torres said a DSHS letter is pending before the county can advertise for bids; staff expect bids by end of October.
Decisions
•Commissioners approved the contract by voice vote.
•Operation Hospital grant accepted; Live Oak contract approved; fundraiser tabled; executive session entered; meeting adjourned.
•The court voted to accept the Operation Hospital FY2027 award.
•The fundraiser item was tabled.
Directions
•Staff and Live Oak to complete credentialing and billing arrangements ahead of opening.
•Staff to await DSHS letter and proceed with bid solicitation when cleared.
•Staff to complete acceptance paperwork before the deadline.
•Staff to complete grant acceptance paperwork and to draft the facility‑use policy; HR/staff to pursue credentialing for Live Oak.
•Staff to draft a permission‑to‑use form and facility‑use policy and return to the court at a future meeting.
Willacy County Commissioners Court heard an extended public comment period focused on the county veterans service officer, received and approved several routine items including acceptance of a $150,000 pipeline repair check, authorization to apply for a rural ambulance grant, selection of a grant administration firm for Texas CDBG funds, and multiple personnel and procurement approvals.
Discussion Points
•Asago Construction is the vendor; they need a purchase order to begin work.
•Clarified fund source (general fund fixed utilities) and confirmed contract term (12 months).
•Commenters urged creation of a Veterans Treatment Court / jail diversion program and better outreach to rural veterans.
•Committee documents and Texas CDBG rating sheets will be retained as part of the file.
•Concerns about container placement and truck routes to avoid damaging new asphalt.
•Four firms responded to the RFP; scoring placed International Consulting Engineers first with 281.5 points.
•Grant requires timely judge signature in some cases; authorization prevents delays.
•If awarded, the grant would provide a $350,000 ambulance with zero county match.
•Multiple speakers praised Frances Najera for one-on-one assistance securing VA benefits and emergency support.
•Staff confirmed the funds were payment for damage caused by pipeline construction.
•Veterans organizations criticized filing of "intent to file" rather than full claims and urged faster processing and more staff.
Willacy County Commissioners held a special meeting Oct. 1, 2026, to approve a set of budget reclassifications and routine authorizations including a grant reclassification for an e-citation license, continuation of salary for a grant-funded crime victim liaison, purchase/solicitation for a fire truck under a grant, installation of veterans crisis hotline signage, and a Republic Services container contract for the new Heritage & Wellness Center.
Discussion Points
•Auditor reported pending verification and a US Marshal transfer that would offset capital fund expenses.
•Auditor suggested paying invoices upon receipt to avoid delays.
•Commissioners asked whether salary needed to be specified in the motion and confirmed it did not.
•Commissioners discussed fiscal-year treatment and timing.
•Commissioners discussed timing and logistics for the December event.
•Estimated monthly and delivery charges were provided and commissioners approved tentative 12-month period.
•Grant is reimbursement-based; staff requested continued payment to avoid service interruption.
•Questions about indoor vs outdoor placement and freestanding sign foundations.
•Republic Services chosen because other vendors do not service that container size locally.
•Sebastian awarded ~$165,000; Santa Monica was ~$150,000; grant typically covers 90% and county must provide match.
•Sheriff's office upgraded license without budget amendment; no balance in sheriff's general fund to absorb cost; US Marshal transfer could offset capital expenses.
•Signs advertise VA veterans crisis line (call 988 then press 1; text 838255); available to veterans and the general public.
•Staff requested a bid window of $182k–$200k to allow for match and equipment.
Decisions
•Approve tentative contract and code expense to fixed utilities.
•Authorization approved.
•Commissioners approved auditor recommendation to treat the item in the current fiscal year session.
•Commissioners approved continuing payment.
•Commissioners approved the reclassification and instructed staff to proceed.
•Commissioners authorized bidding and to prepare MOA for the match.
•Permission to install signage approved.
Directions
•Auditor/Finance to record item in the new fiscal year, reconcile balances and report back.
•County Auditor/Finance to process reclassification and prepare supporting documentation.
•County Judge/Finance to sign contracts and pay invoices as received.
•Finalize contract and ensure container delivery by Oct. 16.
•HR/Finance to monitor grant activation and process reimbursements.
•Issue solicitations, prepare MOA with Sebastian Fire Department, and return with vendor recommendations.
•Place signs at Sebastian Community Center and new building; staff to coordinate mounting and logistics.
Willacy County Commissioners Court met Sept. 24, 2026 to handle routine business including approval of contracts and policies, approve a $969,600 storm-water partnership invoice, adopt tax-abatement guidelines with a $10,000 application fee, and receive a closeout briefing on $4.44M in ARPA funds.
Discussion Points
•Application fee historically $1,000; commissioners debated increasing it to cover administrative and attorney costs.
•Commissioners confirmed county access to monitoring data and discussed adding two additional stations.
•Commissioners discussed utilization monitoring and review after an initial period.
•Commissioners expressed interest in workshops and follow-up guidance.
•Commissioners sought clarification on budgeting and payroll coding.
•GrantWorks presented remaining payroll exposure and closeout timelines.
•Guidelines include criteria for projects with improvements valued at $1,000,000 or greater.
•Presenter described monitoring stations, data availability and benefits for flood forecasting and grant support.
•Provider described telehealth and in-person options and confidentiality safeguards.
•Regional EDO presented ASF authorization and offered workshops and marketing support.
•Staff explained allocation change that increased fixed cost by $3.95 per employee while total dollar amounts remained steady.
•Staff reported total interest earned of $314,358.39 and remaining interest balance of $88,245.88.
Decisions
•Contract approved for one year with monitoring plan.
•Court accepted the briefing and directed staff to proceed with closeout actions.
•Guidelines adopted with amended $10,000 application fee and two-year sunset.
•Invoice approved; county to receive data access and evaluate adding additional monitors.
•Proceed with education and marketing; no county budget action recorded.
•Rates approved; auditors to process invoices using new codes.
Directions
•Adopt rates and forward approved figures to auditors for coding.
•Amend Section 3 to set application fee to $10,000; send final guidelines for legal review and publication.
•Approve contract for one year and direct staff to report back on uptake and cost.
•Approve invoice pending FY correction; staff to confirm data access and pursue station expansion if desired.
•GrantWorks to deliver final closeout file; staff to retain records for five years and prepare final compliance report.
•Staff to coordinate workshops and outreach with regional partners.
Special meeting of the Willacy County Commissioners Court on Sept. 11, 2026: the court opened a public hearing schedule for renewing tax-abatement guidelines, authorized an RFQ for a health‑insurance consultant after debate over procurement, accepted public comments from a benefits firm and a housing-authority director, transferred a county vehicle to the 197th District Court, reviewed monthly financials, and authorized the judge to act after a closed session.
Discussion Points
•Allegation that a contract or agenda item was circulated prematurely, potentially compromising the procurement process.
•Commissioners discussed an audit finding regarding a large account funded after payoff of detention center debt and FDIC coverage concerns.
•Commissioners inquired about inspection and ongoing fuel card procedures.
•Court signaled preference to keep eligibility low to attract investment, with option to adjust later.
•Public comment supporting consultant selection and year‑round employee advising.
•Request that the court fairly consider previously submitted proposal during procurement.
•Staff and commissioners emphasized that a public hearing is required before final adoption.
•Staff explained guidelines apply to future reinvestment zones and are typically renewed every two years.
•Staff reported vehicle repairs and budget/fuel‑card availability.
•Staff said an outside financial adviser reviewed accounts and confirmed safety measures.
•Treasurer presented redesigned monthly report with balances and investment pool details.
•Whether an insurance consultant is required when interim staff are in place.
•Whether RFQs should precede RFPs and how to structure evaluation to avoid ties.
Decisions
•Approved motion to proceed with public‑hearing process for renewal of tax‑abatement guidelines (procedural approval only).
•Authorized RFQ process; final contract approval remains with Commissioners Court.
•Monthly reports accepted and approved.
•Transfer approved by voice vote.
Directions
•Authorize transfer and issue a dedicated fuel card for the vehicle.
•County Attorney to review procurement/legal questions raised and advise as needed.
•Post redesigned report online after approval and follow up with financial adviser on collateral and FDIC exposure.
•Proceed with RFQ and have the committee review qualifications and recommend finalists to the court.
•Set public hearing for Sept. 24, 2026, at 9 a.m. in the Willacy County Commissioners Courtroom.
Willacy County commissioners approved the FY 2026–27 budget and a 0.7742 property tax rate, adopted salary increases for employees and elected officials, accepted the independent audit, and approved ARPA-funded technology purchases and several contracts and proclamations.
Discussion Points
•Auditor explained clean opinion, change in accounting principle for compensated absences, and a compliance finding for a component unit bank account.
•Commissioners noted the general-fund rate is the lowest since 2020 and credited fiscal discipline.
•Concerns raised about work-order routing and CJIS access paperwork; county admin to be point of contact for work orders.
•Contract increases hours and fees from previous year; staff recommended continuing the agreement.
•County Attorney explained statutory restrictions that affect his vote on elected-official compensation.
•GEAR UP representatives described program support for students from middle school through first year of college.
•Judge asked for an up-to-$8,500 cap in case of miscommunication; staff agreed.
•Judge stated the total rate and said the rate includes general fund, debt service and Road & Bridge.
•Judge summarized the salary increases and noted prior publication and hearings.
•Management described corrective steps and additional oversight via financial advisers.
•Resolution text read into record citing regional participation rates and AACT's role.
•Staff presented invoices and totals for treasurer and sheriff offices.
Decisions
•Adopted FY26–27 budget and salary schedule.
•Adopted total tax rate 0.7742; approved component rates individually.
•Authorized purchase up to $8,500; invoices totaling $8,334.99 to be paid from ARPA interest.
•Contract approved pending legal review and completion of CJIS documentation.
•Court accepted the independent audit.
•Court adopted the voter-registration resolution and the GEAR UP Week proclamation.
Directions
•County clerk to provide certified copies to AACT and community organizations as directed.
•County to implement procedures for establishing public-funds accounts and stronger account review controls.
•Court approved contract pending these items.
•Implement salary changes for eligible county employees; exclude grant-funded roles.
•Place language in contract specifying county admin as point of contact; complete DPS/CJIS contractor forms and obtain judge signature; finish legal review.
•Proceed with procurement and pay invoices from ARPA interest.
•Record and publish the adopted tax rates; implement in FY26–27 budget.
Willacy County Commissioners Court met Aug. 27, 2026, to approve routine claims and contracts, hear a presentation from the Victim Assistance Unit, adopt a bullying and suicide awareness proclamation for September, and approve several contract renewals, grant awards and change orders including a $150,000 veterans assistance grant and $8,407 in additional CDBG site work.
Discussion Points
•Change order addresses ADA access route and right-of-way work; $8,407 total.
•Change order covers demolition cost.
•Eligibility requires low income and demonstrated hardship; staff serves ~150 veterans.
•Engineers provided sketch and breakdown of costs.
•Grant amount $150,000; prior award cycles differed in size.
•Historic shoreline features need removal to continue construction.
•Packet of amendments said to net to zero overall.
•Possible partnership details included vouchers, mobile spay/neuter, and fencing assistance; San Benito experience cited with a $35,000 donation.
•Presenters listed donation sources and outreach events for Oct 2025–June 2026.
•Pretrial services now collects supervision and attorney fees; supervision fee $40/month.
•Proclamation cites CDC data and emphasizes reducing stigma and school-based outreach.
•Program returns fees to general fund and supervises pre-indictment defendants.
•Satellite phone provides state communications backup; service includes limited monthly minutes and overage charges.
•TDHCA final approval pending landscaping items.
•Transfers between administration and maintenance; sheriff/jail reallocation; Precinct 2 financed backhoe recorded as other financing sources.
Decisions
•Budget amendments approved
•Change order approved
•Contract renewed for $25,000
•Court accepted the grant
•No action taken; informational item only.
•Payment approved from capital funds
•Proclamation adopted by voice vote
•Renewal approved
Directions
•Commissioner offered to forward supporting emails and documents to the court.
•Engineering to email additional specifications and coordinate with TDHCA and contractor.
•Presenters will distribute information to local school counselors and hold in-school presentations.
•Proceed with removal to enable project continuation.
•Staff to evaluate additional units for redundancy.
Willacy County Commissioners Court approved an emergency procurement exemption and an emergency order to repair sections of Gonzales and Bush roads damaged by pipeline construction, and authorized selection of Asavo LLC to perform immediate repairs not to exceed $150,000, to be paid by the pipeline company.
Discussion Points
•Attorney outlined statutory standards and relevant attorney-general opinions.
•County to limit emergency procurement scope to immediate hazard sections of Gonzales and Bush roads.
•Damage is concentrated on paved sections (Gonzales) and a small segment on Bush Road; caliche roads unaffected.
•High volume of heavy truck loads caused base failure and hazardous surface conditions.
•Justification for bid waiver under emergency procurement law.
•Legal memorandum argued emergency exception applies due to public safety risk and potential delay from competitive bidding.
•Need for immediate mobilization of a qualified vendor to avoid prolonged hazardous conditions.
•Recommended documenting company acknowledgement and limiting emergency procurements to immediate hazards.
Decisions
•Approved emergency procurement exemption; approved emergency order; staff to proceed with emergency repairs and invoicing.
•Approved selection of Asavo LLC and waived competitive bidding for this immediate work.
•Court accepted legal recommendation and approved emergency order and procurement approach.
•Court approved emergency procurement to address immediate hazards.
Directions
•Document company acknowledgement; invoice all repair costs for reimbursement; execute emergency order and authorize immediate mobilization of vendors.
•Immediately stabilize and repair hazardous sections; document and invoice all costs to pipeline company.
•Prepare formal acknowledgement letter to pipeline company; document invoices and oversight.
•Select vendor for immediate repairs; limit scope to immediate hazards; seek reimbursement from pipeline company.
Willacy County commissioners met in Breville on Aug. 21, 2026 to approve donating one seized utility watercraft to Port Mansfield law enforcement and to consider redepositing roughly $11,664 into the district attorney's ESAC Department of Justice account; a budget amendment and an executive session were scheduled for follow-up.
Discussion Points
•Commissioners asked about mechanics (electronic payment) and which fund will receive the deposit.
•County noted auction as an option for the second craft if not needed.
•Court recorded motions authorizing the county attorney to proceed and a motion by Commissioner Garcia referencing consultation with additional attorneys.
•DA\u0002s office described two seized small craft, said they were forfeited after JP-court proceedings and no claimants appeared.
•DA\u0002s office requested redeposit and explained it was an accounting reclassification related to FY2025 salary reclassings to be reflected in FY2026 reporting.
•Motion to enter executive session was made and carried by voice vote.
•Port Mansfield requested one craft for law-enforcement use; DA\u0002s office will draft MOU/use agreement to govern storage and operator certification.
•Transcript shows multiple numeric variants; staff said auditor will reconcile exact amounts.
Decisions
•Court entered executive session; no public outcomes recorded in the provided transcript.
•Donation of one seized utility watercraft to Port Mansfield approved; further actions to follow.
•No final budget amendment vote at this meeting; matter postponed pending auditor review.
Directions
•County attorney to proceed as discussed in executive session; county attorney may consult additional attorneys as authorized.
•County auditor to review redeposit and prepare budget amendments next week.
•County staff and DA\u0002s office to complete title transfer and draft use agreement with Port Mansfield.
•DA\u0002s office and county auditor to decide disposition of the second craft and, if appropriate, coordinate auction.
•DA\u0002s office to provide documentation and work with auditor to reclass funds.
Willacy County Commissioners Court held a regular meeting on Aug. 13, 2026, addressing budget hearing dates and tax-rate publication deadlines, appointments and compensation for a county judge pro tem, property tax resale approvals, several contract and grant authorizations, and routine county business.
Discussion Points
•Commissioners discussed rotation and presentation team for the hearing.
•Commissioners discussed timing, budgets and usage rights for photos and content.
•Contract paperwork received with amount different from that approved earlier in the year.
•Court agreed to accept the check on hand and process any additional check separately.
•If funded, the county will likely contract architects and consultants to finalize project scope.
•Legal staff advised deadlines for publication under Local Government Code and Tax Code.
•Other taxing jurisdictions (city and ISD) had approved the offers; Willacy County was the final entity to approve the bids.
•Rotation vs. continuity for pro tem position.
•Short application window for the DOJ grant and need to combine equipment and facility requests in one application.
•Staff and vendor exchanged emails to reconcile the proper terms.
•Staff noted distribution mechanics can be complicated depending on which taxing entities have claims and the donor’s property interests.
•Tax office described resale process and statutory minimum opening bid.
•Timing pressure because compensation must be posted to meet publication deadlines.
•Vendor presented two tiers and sample scopes (posts, videos, photography).
Decisions
•Accept $29,000 donation and authorize distribution to appropriate entities.
•Amend motion to align contract with previously approved terms.
•Appoint pro tem for one-year term; remove previously authorized payment for FY26–27.
•Approve headshot engagement up to $1,500 and authorize first-tier social-media management contract.
•Approve highest offers and adopt resolution for corrected resale date 07/07/2026.
•Authorize staff to submit DOJ FY2026 application.
•Set Sept. 10, 2026 as public hearing date for budget and tax rate; schedule laid out for compensation, budget, and tax rate hearings.
Directions
•Clerk to ensure compensation posting and related budget data are published by required deadlines.
•Clerk to publish hearing notices and post the proposed budget and compensation schedule by statutory deadline.
•Clerk to update official records to reflect corrected contract and payment schedule.
•County administration to assemble application materials immediately and coordinate with federal-grant advisers.
•County staff to finalize contracts, schedule photography sessions and monitor monthly analytics.
•Tax office to finalize transfers, place properties back on the tax roll and provide documentation.
•Treasurer and tax office to calculate prorated distributions and disburse funds.
Willacy County Commissioners Court met on July 23, 2026, in the County Judge's Office Commissioners Courtroom to hear presentations, approve grant actions and purchases, authorize communications and security upgrades, and take steps on interlocal agreements for jail housing. The court voted to apply for and accept a rural ambulance grant, approved multiple equipment and service purchases, and corrected a clerical error in tax-abatement guidelines.
Discussion Points
•ADP 93 reported in 96-bed facility; federal inmates recently purged; Jim Hall County identified as potential overflow location.
•Clerical error made effective/expiration dates inconsistent; correction will not change substantive policy and is limited to section 9.
•Contract language references $75 per-prisoner-per-day; budget implications discussed.
•Eligibility at $350,000 cited; question whether title vests to county and how insurance is handled; five-year spending window for purchase and outfitting; need for subagreement with EMS provider.
•Extension overview for District 12; distribution of County Connections newsletter; invitation to December conference; five-year community needs assessment guides programming.
•Grant requirement for alarm connection to law enforcement; lack of telco service at project site; vendor recommendation to add LTE/cellular for testing and punchlist completion.
•Lease payments to be made upon receiving invoices from specified accounts.
•Need to replace 20+-year-old tractor; separate tractors to avoid driving back and forth between proceeds.
•Proclamation to celebrate Prairie View A&M's 150th anniversary; request to take a photo for university marketing.
•Replacement of Mitel system and consolidation to a single hosted system; juvenile confidentiality and fax handling; incremental costs vs. long-term savings; departmental cost allocation after installation.
•Scoring criteria and priority activities; 2% local match; administrators and engineers required if funded.
•Staff reminded court that administrative costs are only incurred if selected for funding.
•Staff will include the volume and page reference in the corrected document.
•Transcript shows an inconsistent figure ($303,000) in one line; staff confirmed award letter indicates $350,000.
•Vehicle purchase details including VIN and funding account.
Decisions
•Adopt proclamation
•Approve application; accept award; authorize negotiation and subagreement
•Approve correction
•Approve interlocal
•Approve lease-purchases
•Approve purchase
•Approve security system installation
•Approve solicitations
•Approve upgrades and direct follow-ups
Directions
•Approve clerical correction and update county record with volume/page information.
•Authorize advertising of RFP and RFQ; staff to return with project options and specifications if requested.
•Authorize judge to negotiate subagreement with Willacy County EMS Inc.; create grant account; authorize county auditor to submit compliance reports.
•Proceed with installation and LTE backup as needed; staff to document vendor arrangements and grant compliance.
•Proceed with installations; prepare cost breakdown and consult juvenile staff to configure confidentiality settings.
•Proceed with interlocal agreement as contingency; sheriff to manage operational logistics.
•Proceed with lease documentation and invoice payment after delivery.
Willacy County Commissioners Court met July 9, 2026, approved a series of routine consent items and budget amendments, accepted a resignation, authorized a 90‑day termination notice to Bureau of Health Inc. and voted to submit county comments — using a NACO template — opposing proposed changes to federal grant rules (2 CFR Part 200).
Discussion Points
•Item was discussed before and after executive session; specific reasons were not stated in open session.
•Staff proposed seeking objective risk criteria, published timelines for pre‑award review, notice and cure periods, limiting termination authority and safe harbors for counties with strong audit histories.
•Staff reported jail population increases and overtime pressures in several departments.
•Staff warned proposed changes could permit mid‑program termination and retroactive disallowance of costs, creating uncertainty.
•Staff warned proposed OMB changes to 2 CFR Part 200 could allow mid‑program termination and increase monitoring and administrative burdens.
•Treasurer corrected a report date and presented monthly cash/investment totals.
Decisions
•Approved motion to direct County Attorney to issue the notice.
•Court approved using the NACO template as a base and directed staff to file comments.
•Multiple routine approvals (payments, permits, interlocal agreement, donations) were approved via voice vote.
•Resignation of health insurance consultant accepted.
•Stop‑loss insurance award approved with $100,000 attachment.
Directions
•County Attorney directed to send 90‑day termination notice to Bureau of Health Inc.
•County Attorney to send 90‑day notice of termination.
•Grants staff to finalize and file comments on 2 CFR Part 200 by July 13 using/adapting NACO template.
•Purchasing/Finance to provide invoice breakdown for PCT Tech payment to the auditor.
•Staff to adapt NACO template and file comments by July 13.
Willacy County Commissioners Court convened June 25, 2026, in Raymondville to conduct regular business, hear public comment and hear a multi-hour presentation on financing the renovation of the county courthouse; the court approved publication of a notice of intent to pursue certificates of obligation and voted on several procurement and administrative items.
Discussion Points
•Advisers described grant funds (~$9M) and recommended a not-to-exceed CO authorization of $15M to provide cushion for historic renovation costs.
•Commissioners emphasized urgency to publish notice and issue bid packets to lock pricing.
•Flores highlighted local extension programs focused on healthy eating, emergency preparedness and diabetes education.
•Flores said the county diabetes prevalence is about 18% and that the extension coalition meets monthly to plan programs.
•Presenters assumed conservative 6% interest for 20 years in initial modeling and noted issuance costs and potential bond insurance.
Decisions
•Resolution to publish notice of intent to issue certificates of obligation approved
Directions
•Procurement staff to advertise construction bids immediately so bids align with financing timeline.
•Staff to publish notice in the local newspaper for two consecutive weeks and post prominently on the county website.
Willacy County Commissioners Court met June 22, 2026, in Raymondville and approved a regional tire ordinance resolution, a construction materials testing contract for Fresno Park, updates to a victim assistance grant resolution, several routine land and budget items, and held an executive session with no action taken. The meeting included a presentation from Melissa Gonzalez Roses of the LRGVDC and several unanimous voice votes approving the listed items.
Discussion Points
•Administrative change to grant resolution to meet Criminal Justice Division submission requirements.
•LRGVDC presentation urging county approval of a regional tire ordinance; county approvals to precede city outreach.
•Need for construction materials testing at Fresno Park to continue mobilization.
•Routine land/road permits and budget amendment to fund investigator position.
Decisions
•Adopt regional tire resolution (approved)
•Approve budget amendment and travel/training requests (approved)
•Approve grant resolution update (approved)
•Approve PSI contract for Fresno Park (approved)
•Approve replat and road bore permit (approved)
•No action taken on executive session items in open session
Directions
•County staff to issue PSI contract and schedule materials testing (Fresno Park).
•Grants staff to resubmit corrected Victim Assistance grant application.
•LRGVDC to approach city councils to encourage adoption of the regional tire ordinance.