County road operations staff and meeting participants reviewed traffic-speed concerns, proposed pedestrian beacons, the history and possible future of winter maintenance near Warm Springs, and road-maintenance equipment and storm-response constraints.
Discussion Points
•A Committee member said historical documents indicated a Forest Service maintenance commitment that could support county plowing, while participants disputed whether the agreement remained in force.
•A participant questioned the need for the beacon, citing sight distance and no observed near misses.
•A request sought a 15-mph limit on Airport Road; staff discussed restoring an existing 25-mph sign and clearing brush.
•A roughly $12,000 estimate was received for rapid-flashing beacons at the Cloud Creek Road crosswalk.
•A Staff member reported an estimate of $280,000 to $320,000 for an asphalt-milling machine and discussed rental logistics.
•A Staff member reported high-speed readings on Whitehall/White Tail Road and damage to a speed-display sign.
•A Staff member said the current arrangement excluded snow removal and that residents had been told the county would not plow.
•Participants cited the recreation area, nearby homes, rough road conditions, county workload and possible precedent for other Forest Service roads.
•Participants described the risk that bedrock could damage the machine and cited a possible $10,000 repair cost for two rollers.
•Participants explained that fallen-tree removal took priority during storm response and described aging plow trucks.
•The prior minutes were dated Oct. 27, 2026.
Decisions
•No decision to resume plowing or change the current maintenance arrangement was made.
•No purchase or rental was approved.
•The motion to approve the minutes carried.
Directions
•A Committee member planned to speak with a Forest Service contact about the recreation area's value and possible arrangements.
•Staff planned to follow up with the sign supplier after the insurance process.
•Staff planned to pursue restoration of the Airport Road 25-mph sign and clear brush if conditions allowed.
•The requester planned to approach a school and seek other funding for the Cloud Creek Road beacon proposal.
The Jefferson County commissioners reviewed department and interagency updates, considered an MSU Extension contract and a Jack Mountain Estates subdivision amendment, and approved a 2027 burning-season resolution. The transcript does not establish the meeting date.
Discussion Points
•Adding screens at an upper level was being considered to capture water from another elevation.
•A Hilo traffic sign that had been shot was being replaced.
•A journalist asked about route postings, open versus closed routes and broader effects in the Beaverhead-Deerlodge National Forest.
•A separate intercounty meeting did not advance the issue because needed information was not available; participation by seven counties and additional input were under consideration.
•A watershed group held a public meeting about a transition affecting Jefferson County and planned another for Dec. 2; the year and full group name are unclear.
•Commissioner Villaluz reported actual well yields of about 100 to 120 gallons per minute compared with initial expectations of 250 to 300.
•Doug said he had consulted fire departments about whether to change the fee and reported keeping the existing fee unchanged.
•Doug said the state permitting system had been in place for about 15 years and was cumbersome; he was interested in researching alternatives, with costs to be considered.
•Planning staff said subdivision conditions would not be affected and that covenants prohibit further subdivision but do not address aggregation.
•Planning staff said the owners were advised it could be difficult to separate the combined lots later.
•Staff cited the front-yard configuration and increased inquiries about aggregation in response to a question about the owners’ reason.
•The county was gathering information on an approximately $12,000 flashing sign for the McCallum Creek crosswalk, with schools involved.
•The discussion referenced an estimated need near 200 gallons per minute, but the commissioner said he did not recall the exact requirement.
•The fire-safe working group was seeking funding to hire an executive director after a volunteer had been doing the work.
•The representative proposed a possible joint commission meeting in early 2027, and participants discussed following up on calendars.
•The representative said the contract covers the county’s contribution toward two salaries and all administrative support.
•The stated total was $117,376; the transcript does not clearly explain how the amount is apportioned.
•Traffic-speed reports showed many high speeds on Hilo and Whitetail roads, according to Villaluz.
•Villaluz said residents in a Jackson Creek subdivision did not want slash piles burned and the working group was considering what to do.
•Villaluz said the test wells may have included water from an upper watershed level because of how the pipe was set.
Decisions
•The commissioners approved Resolution 23-2026 establishing the burning season for calendar year 2027.
•The commissioners approved the amendment with findings and conditions.
Directions
•Participants agreed to check calendars and make contact about arranging a possible joint commission meeting.
The road and bridge meeting covered grading work, traffic and safety requests, road-maintenance equipment, resurfacing options and snow service on a Forest Service road. Members also approved four sets of prior meeting minutes.
Discussion Points
•A month’s rental had previously been discussed at about $25,000; the price and availability of a new county rental program were not finalized.
•Members considered material durability, chemical exposure and maintenance costs.
•Members did not resolve whether the Highway 282 section was county- or state-maintained.
•Members discussed a larger milling machine for full-road rehabilitation, including McClellan Creek Road, and possible follow-on chip seal.
•Members discussed whether Schedule A covered snow removal, possible emergency assistance, reimbursement and liability.
•Possible school assistance with beacon costs was raised, not approved.
•Speed readings included typical speeds of 50 to 70 mph on a road section near the end of chip seal.
•Steel, poly, stainless-steel and used tanks were being considered; used options discussed were about $8,000 to $12,000.
•The supervisor said an asphalt zipper works well for small patches and trenching but is slow and expensive to maintain.
•The supervisor said any help would depend on conditions, available time and resources; members stated there would be no guarantee or regular maintenance.
•The supervisor said complaints were concentrated on an upper section near Bishop Creek.
•The supervisor said the county had no regular maintenance responsibility above Mill Fork and that residents had previously been told it would no longer plow there.
•The supervisor said the tank was rusting and rotting internally after years of repairs.
•The supervisor was gathering pricing and options for a crosswalk beacon and wildlife signs.
Decisions
•Minutes from Sept. 15, Sept. 22, Oct. 6 and Oct. 13, 2026, were approved; no numerical vote tally was stated.
•No new snow-removal policy or service guarantee was adopted.
Directions
•The supervisor expressed interest in moving a speed-feedback sign farther uphill and also referred to a sign on the route toward Blue Springs; no formal assignment or schedule was recorded.
•The supervisor said he would be interested in finding out whether a machine was available nearby; this was expressed as a preference, not a formal direction.
•The supervisor said he would seek estimates and bids; no formal assignment was recorded.
The Jefferson County Commission heard fire district representatives describe a missing water-supply agreement at Moonlight Ridge and concerns about a bridge serving another subdivision. The fire district also requested help with a backup generator; commissioners said they would investigate possible funding and review the subdivision issues.
Discussion Points
•Abraham said the fire district's records showed it had sought a second point of egress during the subdivision process.
•A county official said the county had been told it lacked authority to require developer payments absent a legal basis, and raised concern about potential court challenges.
•A county participant said officials wanted the fire district to comment on whether development variances would work for emergency services.
•A county participant said they would check whether Title III funds could be used; participants discussed fuel options and whether the project might return on a future agenda.
•Participants discussed one-time development fees, voluntary developer donations, a possible fire district levy and the cost of maintaining existing water systems.
•Participants discussed possible connections to another well, negotiation of an easement, or drilling a well, along with costs, maintenance responsibility and regulatory questions.
•The fire district described a natural-gas backup generator for its station and requested about $22,000 toward the project.
•The fire district raised concerns about bridge replacement, the stated 85,000-pound capacity, potential creek crossings and unsafe reliance on an interstate fence opening.
•The fire district said the well shown in subdivision plans was intended to supply the fire-fill tanks, but it found no filed shared-well agreement or easement.
Directions
•A county participant said they would investigate a possible funding source; the moderator said the fire district could return to present the request.
•County participants expressed interest in consulting the fire district on proposed variances; no formal direction or vote was recorded.
•County participants said they would review the subdivision records and possible options; no formal assignment or vote was recorded.
•Participants discussed further research and planning, but no formal staff direction or assignment was recorded.
The Solid Waste Board reviewed its September and October minutes and received a monthly operations report covering recycling, disposal activity, landfill costs, equipment and staffing needs, and a possible shop project. The meeting ended without further action items.
Discussion Points
•A board member asked whether increased landfill rates were shifting waste to Montana City and whether local rates needed adjustment.
•Board members discussed a possible $1 million borrowing threshold and potential use of cash on hand.
•Members discussed seeking bids in winter and possible spring construction.
•Mike described the expected junk-vehicle crushing schedule and the yard's current fill level.
•Mike discussed a possible brush burn after snow arrives.
•Mike discussed the county's $33-per-ton charge, the public construction-waste rate, weekend demand, waste volumes and service billing arrangements.
•Mike recalled a bid-package estimate of about $100,000 and said he needed to verify it.
•Mike reported poor or inconsistent cellphone service at solid waste work sites and raised worker safety as a concern.
•The chair presented minutes from Sept. 8 and Oct. 20.
•The chair raised concern about the steel pile's size relative to the brush pile.
•The chair warned that low local pricing could draw more construction waste and overwhelm the site.
•The Solid Waste Supervisor reported October recycling totals and brush-handling volumes.
•The supervisor described oil reuse and operational restrictions for brush disposal.
Decisions
•The minutes were approved following an aye vote; no numerical tally was stated.
Directions
•Mike said he intended to seek a three-year price lock with the landfill.
•Mike said he would contact Stephanie about the possible borrowing threshold.
•Mike was asked to obtain current package costs from Great West and share them with the board.
County commissioners approved releasing a subdivision improvements agreement, appointed a replacement to the post‑election canvass board, and voted to transfer two small county parcels to the U.S. Forest Service after a public hearing; commissioners also reviewed routine department reports and election logistics.
Discussion Points
•Board noted staffing needs to process ballots and thanked clerk for outreach.
•Clerk explained statutory mechanism to substitute a county official for an absent commissioner for canvass duties.
•Clerk reported the post‑election audit on Nov. 12 and canvass on Nov. 13 schedule.
•Clerk urged early absentee returns, explained processing delays when ballots arrive late.
•Commissioners described parcels as remote, tax‑deeded, and of limited county use.
•Commissioners discussed purpose of subdivision improvement agreements—ensuring developer completion and providing financial surety.
•County commenter emphasized a statutory requirement/reservation for recreational dedication for five years.
•Health department faces nursing shortages and is running caravan clinics and a planned clinic expansion.
•Juvenile detention board is struggling to reach quorum; commissioners urged counties to confirm appointees.
•Road crews have been busy clearing snow and downed trees; new hires will help operations.
•Staff and commissioners said Forest Service routinely handles property transfers and management.
•Staff confirmed completion and approval of required herbicide applications for Pioneer Place.
Decisions
•Approved transfer of two county parcels to the U.S. Forest Service for recreational use (voice vote).
•Sarah Iyer appointed to the board of county canvassers for Nov. 13; motion approved by voice vote.
•The board voted to release the Pioneer Place subdivision improvements agreement.
Directions
•Clerk to notify Sarah Iyer and include appointment in canvass materials.
•Clerk to staff the drop‑off window and ensure procedures for signature verification.
•Counties to confirm juvenile detention board appointees to ensure quorum and grant compliance.
•Notify local contacts and affected stakeholders of transfer timeline.
•Staff to coordinate deed transfer and deed restriction language with U.S. Forest Service.
•Staff to follow up on clinic expansion planning and coordinate with behavioral‑health partners about a CCBHC presence.
•Staff to update and circulate the release document with correct dates for signature.
Jefferson County health department staff reported a busy respiratory season, active vaccination outreach including mobile clinics and school catch-up shots, several recent communicable-disease investigations (including elevated lead cases and a tuberculosis patient in treatment), and discussed plans for renovating the county-owned health building. The board scheduled its next meeting for Nov. 10 and heard updates on staffing, grants, and internal communications.
Discussion Points
•Active COVID and influenza outbreaks in congregate settings; several foodborne-illness investigations; elevated lead cases in children; one TB patient completing treatment in December.
•Next board meeting set for Nov. 10 at 5:30 p.m.; four-day work week reported as successful; communication gaps over clinic purchase noted.
•Procurement choice between separate architect + builder vs. design-build.
•Three care-van clinics held this month; one more scheduled; plans to visit Yellowstone Boys and Girls Ranch and Basin to vaccinate children, staff and families; catch-up school vaccinations to be provided.
•Use existing drawing as plan A and identify alternative add-ons (conference room, bump-outs); whether environmental health stays on north side; use of ambulance bay and gravel space for expansion.
Directions
•Department will handle outstanding utility bill for the county-owned clinic; staff to improve public outreach and confirm meeting notices.
•Hannah to provide detailed vaccination numbers at the next meeting.
•Hannah will provide updated vaccine and staffing numbers at next meeting (Nov. 10).
•Staff to provide updated drawings and pursue a contractor who can shepherd design and bidding (design-build option to be considered).
Road and bridge staff reported on recent storm cleanup, early-season snow-plowing policy, a $94,700 bridge contract award, local speed-sign placements and a Whitehall internet fix; commissioners discussed private-tree liability and temporary road closures.
Discussion Points
•Bid for Boulder & Cutoff Bridge awarded to Battle Ridge Builders at $94,700.
•Commissioners debated prioritizing major arteries over low‑use subdivision roads to reduce unnecessary grader runs.
•Commissioners recommended paired traffic counts to distinguish through traffic from local users.
•Construction scheduling must consider migratory bird protections and weather; possible ~2 week closure discussed.
•County attorney sat on interview panel due to disclosure/conflict concerns.
•Large cottonwoods on private property lean toward county road and may create recurring cleanup costs and safety risk.
•Long Gulch speed sign reduced top speeds; more signs proposed for Whitetail, Hyor, Mason Creek.
•Repeated fence strikes at the Clancy post office corner prompted resident requests for county signage.
•Staff currently follows an informal 3‑inch threshold to mobilize crews on weekends, but high‑elevation pockets create exceptions that lengthen crew time.
•Taylor consulted county attorney Steve Hadden about notice and liability options.
•Taylor noted a safety‑zone designation is needed to control parking under recent precedent.
•Taylor selected a local commercial provider (Jason Good/TSS) for installation and support.
•Two hires: James Hammond (Montana City) offered; Cody Haggerty started in Whitehall.
•Whitehall shop lacked reliable internet after attempts to reroute failed.
Decisions
•Award reported; staff to finalize schedule and communications.
Directions
•Staff to continue onboarding and CDL certification processes; monitor training needs.
•Staff to coordinate schedule with engineers and contractor and send public notices and signage to affected residents.
•Staff to deploy additional speed‑signs at selected sites and gather comparative traffic counts; report back with data.
•Staff to draft a letter to the property owner advising potential liability and request mitigation; consult county attorney on authority and cost‑share options.
•Staff to draft clearer written guidance distinguishing priority routes and when to mobilize crews for marginal storms.
•Staff to inform the post office of options: install signs on its fence or apply for an encroachment permit; staff will make the permit process simple.
•Staff to proceed with commercial installation and test connectivity; monitor performance and costs.
Jefferson County treasurer's office staff reviewed September balances, flagged a $332,004.46 interest settlement from a bankruptcy matter and proposed options for its disposition; staff also outlined tax-roll conversion errors that shifted school and fund allocations, noted a planned DOR refund portal tied to House Bill 542, and discussed routine reconciliation and staffing updates.
Discussion Points
•An announcement claimed the county agreed to provide titling at DMV exam stations; treasury staff said that is incorrect for Jefferson County.
•Conversion error in Black Mountain data misclassified some assessments and changed voucher allocations.
•DOR plans a January portal to accept refund applications for 2026 if homestead is granted for 2027.
•Handling of a 49¢ Elkhorn Mining deposit (administrative vs. formal resolution).
•House Bill 542 could change homestead treatment for trust-held properties and may produce retroactive tax increases for some homeowners.
•Mako recommended depositing the funds to the general fund.
•Option tax revenue will still be collected regardless of transaction location.
•Outstanding noncash account items and reconciling deposits.
•Some members suggested economic development or capital improvements (e.g., security upgrades).
•Staff adjusted penalty-and-interest lines to balance voucher distributions so agencies receive proper shares.
•Staffing updates: Christine interview and potential return of Ashley.
•The $332,004.46 is settlement interest from an MTMI bankruptcy and not taxable revenue.
Directions
•Staff to prepare options and return the item for committee decision in November.
•Treasurer's office to continue reconciliation with Black Mountain and produce corrected documentation for affected entities.
•Treasurer's office to coordinate records with DOR and identify affected residents.
•Treasurer's office to email spreadsheets and complete journal vouchers to reconcile accounts; continue staffing planning.
•Treasurer's office to follow up with the party that issued the announcement and clarify county participation publicly.
Manager's report at the Jefferson County Solid Waste board meeting on October 20 covered a spike in brush volume and tipping fees, recycling tonnages and revenue, a parcel-unit billing error approved for correction and three years of refunds, truck repairs and return, shop cost estimates, staffing issues, and patchy site connectivity.
Discussion Points
•Exact recycling totals and small revenue amounts provided by Manager.
•Intermittent Starlink connectivity and a leaking antenna at Whitehall were raised as operational problems.
•Manager emailed commissioners and a contact (Peggy Cirella) and awaits details on loans and bids.
•Manager noted market conditions for metals and how battery payments are weighed.
•Manager plans to use scrap proceeds or cash-on-hand to reduce truck debt if feasible.
•Manager reported a driver lacked required qualifications and a potential candidate from Idaho may apply.
•Manager reported current brush tonnage (59.47 tons) and tipping fees ($1,878.10).
•Manager stated the Department of Revenue placed five units on the parcel in error and suggested reducing it to one residential unit and refunding three years of overpayments.
•Manager warned volumes could triple next month due to external landfill closures and price competition.
•New truck had an electrical failure traced to a chassis ground/paint issue; repaired under warranty.
•Shop estimates exceed the amount budgeted two years earlier.
Decisions
•Board approved the unit reduction and refunds for up to three years.
Directions
•Consider route optimization to reduce miles and adjust drop-off scheduling.
•Continue routine collection and sell when market conditions are favorable.
•Manager to obtain loan terms and vendor bid details and report back.
•Monitor truck performance and consider debt repayment options.
•Proceed with selective hiring; IT to consider adding passwords and investigate connectivity drops; arrange repair for leaking antenna.
•Staff to verify residency/ownership via Montana Cadastral and process refunds if documentation supports it.
Jefferson County commissioners reviewed calendar items and reports, heard a staff presentation on the Cold Springs Minor Subdivision (67 acres to be split into two single-family lots), and granted preliminary approval with findings and conditions. Other updates included library board planning, forest-service priorities, and local board leadership changes.
Discussion Points
•Board discussed recruitment for new committees and initial consideration of a new or larger library building and 2027 budget planning.
•Commissioners asked about page locations for conditions, approach location, maintenance responsibility, and whether utilities must be installed now.
•Forest priorities for 2027 (timber, fuels, minerals, grazing, trails/campgrounds).
•Road department prioritizing grading, plowing and school-bus route maintenance after snow.
•Staff presented subdivision details (67.16 acres, split into two single-family lots) and infrastructure reviews (MDT access recommendation, Northwestern electric service, fire-suppression plan).
•Trustees reviewed past minutes and governance/policy obligations per state rules.
Decisions
•No formal decision recorded; matter to be discussed at November meeting.
•Preliminary plan approval granted including findings and conditions; staff report adopted.
Directions
•Staff requested that the commission include the October 5 findings and conditions with any preliminary approval and to ensure conditions are met before final plat.
•Staff to verify utility and approach permits when development proceeds.
Treasury staff member Terry Phillips told the Jefferson County board that a recently posted voucher appears to have misallocated delinquent mining taxes from 2009 and 2010, possibly due to a 2015 data conversion to Black Mountain; the board agreed to seek a second opinion and review. Phillips also reported $330,000 in interest from the Montana Tunnels settlement is being held in suspense pending a future distribution decision.
Discussion Points
•$330,000 in interest was recovered from the Montana Tunnels settlement and is currently in suspense.
•Board members recommended obtaining an accounting review before any re-posting.
•Conversion to Black Mountain in 2015 may have reclassified centrally assessed mining taxes as real estate during system migration.
•Phillips presented evidence that a voucher posted mining tax receipts as real estate, creating distribution discrepancies.
•Phillips suggested possible uses (clinic payoff, office security) but did not make a recommendation at this meeting.
•Receivables and archival tax-roll books for 2009 were not all located by Phillips during her review.
Directions
•Treasurer to consult Nancy and obtain a second opinion (county accounting or vendor) before re-posting adjustments.
•Treasurer to contact Nancy and, if needed, vendor or external accounting resources (Mako) for a conversion audit before any reposting.
•Treasurer to present documented recommendations on allocation at a future meeting (approximately two weeks).
Road department supervisor Ver Taylor briefed the meeting on Oct. 13, 2026, describing storm response (grading, plowing and tree clearing), equipment and staffing needs, a bridge repair delayed by DOT parts, an upcoming Hot Springs road repair using millings, and routine hiring interviews.
Discussion Points
•Avoid grading/plowing soft gravel roads to prevent damage; prioritize bus routes and arterials.
•DOT is waiting on parts for the bridge repair and has not confirmed timeline.
•Fleet has limited recent plows/graders; replacement priorities debated.
•High fuel costs and heavy sand use present budget pressures.
•Interviews scheduled for four candidates with on-site skills tests.
•Need to prioritize tree-clearing to reopen roads.
•Panel to include Taylor, Steve Adam and Dylan.
•Permanent capping planned when state millage funds are available next year.
•Provide residents with snowfall policy and expected service levels.
•Short-term repairs: dig out soft spots, install geogrid, use millings from local supplier.
•Unclear whether DOT will attempt repairs before winter or defer for replacement.
Directions
•Conduct skills tests in the yard; report results back to the team.
•Continue discussing equipment purchase timing and possible reallocations between years.
•Department to monitor DOT status and report back.
•Proceed with immediate stabilization; plan for capping once funding obtained.
•Taylor to attach snowfall policy to resident communications.
•Taylor to follow up on specific problem roads and inspect Wix/Tyser if melt doesn't clear.
Jefferson County commissioners met for a regular session that included commissioner reports, public comment on a local TV board, announcements about absentee voting, adoption of the county'wide fixed tax levies for fiscal year 2026-27 (Resolution 19-2026), and approval of a $13 public-notice publication rate and associated bid award.
Discussion Points
•Absentee ballots to be mailed; early voting is underway; late registration in person.
•Absentee pickup days Oct. 24 at multiple county locations between 10 a.m. and 1 p.m.
•Chair read Resolution 19-2026 and summarized certified mill values and funds to be levied.
•Clerk advised an October 1 effective date for the rate increase.
•Committee concerned about sharing well logs and water-rights determinations.
•Only one bid was submitted; state maximum per-notice rate noted as $14.
•Rhodes asked about changing TV board size from three to five and about spending thresholds in the resolution.
•RV park likely not part of phase 1 due to distance; may be phase 2 candidate.
•Well testing planned for first week of October; property acquisitions delayed by CDBG timing.
Decisions
•Award bid to county monitor and set per-notice rate to $13, effective Oct. 1.
•Resolution 19-2026 approved by voice vote.
Directions
•Commissioners asked Rhodes to submit proposed language for an amendment.
•Seek one-year extension for CDBG funding and continue talks on well logs and acquisition.
Jefferson County road supervisors, commissioners and several residents met Oct. 6, 2026 to review maintenance work, discuss magnesium‑chloride use and storage, staffing and equipment shortages, prioritize graveling projects (including a proposed $300,000 budget request), and approve minutes. A resident requested a site visit about a driveway and drainage; the meeting concluded with a procedural vote to approve minutes and adjournment.
Discussion Points
•A Highway 2 bridge has a 10‑ton restriction and is down to one lane; replacement or rebuild options were discussed.
•A mower/tractor (described as 30–40 years old) failed and may need replacement.
•Bridge funding priorities at the state level are unclear and may take precedence over milling funds.
•Commissioners proposed a $300,000 target for regraveling about six miles in the priority section.
•MAG works on many roads but storage and distribution present logistical problems; storage tanks (~10,000 gallons) cost estimates were discussed.
•Prior attempt to use MDT storage failed due to liability and coordination issues.
•Resident praised crew work and asked staff to pass along thanks.
•Resident requests inspection of approach width and drainage mitigation and offers help with compaction.
•Staff is compiling an inventory of roads to produce cost and scope estimates.
•Widespread hiring difficulties for CDL and field positions; interviews being scheduled.
Decisions
•Approved minutes for the referenced date; meeting adjourned.
•No appropriation authorized; decision deferred to budget process.
•No commitment to a bridge project; follow up requested.
•No immediate hires or purchases authorized; items to be considered in next budget cycle.
•No procurement or large capital commitment made; staff to return with samples and plan.
•Site visit scheduled; no formal action beyond staff follow‑up.
Directions
•Staff to await sample results and prepare a pilot plan and cost estimate for MAG use.
•Staff to follow up with MBT/MDT and report back on bridge funding and schedule.
•Staff to pursue recruitment and schedule interviews; return with hiring status and equipment procurement options.
•Staff to return with distances, condition data and cost estimates for proposed projects ahead of budgeting.
•Staff to schedule a site visit next Wednesday morning at 08:00 (per meeting exchange) and to relay appreciation to crew.
Commissioners received an update from fair manager Bruce Minkowski and fair board members about facility use, revenue (about $28,000 in rentals/camping), recent upgrades, plans to pursue acquisition of adjacent Section 34 land, and options for caretakers to board horses pending insurance and a formal boarding agreement.
Discussion Points
•A church group's request for weekly Bridal Barn use poses scheduling conflicts that staff must resolve.
•Board members want a written boarding agreement to define liability, permitted activities, fees and seasonal restrictions.
•Board proposed acquiring remaining acreage in Section 34 to support 4‑H and larger animal facilities.
•Caretakers report ~30–40 hours/week Apr–Sep and perform maintenance tasks.
•Commissioners and board members noted recent maintenance/upgrade work and the potential to expand bookings in 2027.
•Commissioners expressed concerns about county insurance coverage for caretakers' horses and potential taxpayer exposure.
•Commissioners flagged the need to consult the Department of Corrections and the State Land Board and review applicable statutes.
•Commissioners want a cost comparison of utilities/propane and in‑kind benefits versus labor value.
•Fairgrounds hosted 80+ events this year and generated roughly $28,000 in rentals/camping.
•Generator electrical work nearly complete; testing expected imminently.
•List of completed repairs and upgrades including safety, sanitation and lighting improvements.
•Over 20 meetings and seven weddings are already scheduled for 2027.
Directions
•Bring the item back when all three commissioners are available to discuss policy changes.
•Draft boarding ("forced boarding") agreement to be circulated and refined based on insurance guidance.
•Pat to perform generator testing and report results.
•Staff (Ginger/finance) to compile utility bills and estimate caretakers' labor value and include this on the next available agenda with all commissioners present.
•Staff to collect prior minutes and statute references and report back on the legal/administrative steps required for an acquisition or land‑use change.
•Staff to consult county insurance staff (Ginger) and agent Jamie to determine the county's liability coverage and options for requiring personal insurance.
•Staff to produce a more detailed accounting of revenue, utilities and caretakers' estimated labor contribution before the next review.
•Staff to reconcile bookings with any land‑use or boarding policy changes before confirming recurring uses.
•Staff to reuse DOT sand for filling and consider repurposing existing concrete slab as a stage.
Jefferson County commissioners heard public comments about a rough county road and local homeschooling support, received a presentation from Headwaters RC&D on loans and local economic programs, approved a resolution declaring October 2026 Breast Cancer Awareness Month, and heard election and scheduling announcements.
Discussion Points
•Absentee ballots mailing date (Oct. 9)
•Brownfields assistance includes phase 1/2 assessments and low‑interest cleanup loans for municipalities and private owners
•Chair and Commissioner Nudlow coordinated to move and second the resolution
•Claim that a referenced party had substantial back tax funds ($4.2M)
•County staff to evaluate what can be done with a new bulldozer and available resources
•Headwaters has multiple revolving loan funds and grant programs (Big Sky RLF, tourism RLF, USDA relending capital)
•Planned absentee ballot drop‑off sites on Oct. 24
•Regular registration deadline (Oct. 5)
•Request to prioritize Buffalo Cut road repairs and consider building a bypass
•Staff offered to connect local businesses and producers to application resources
•Text of resolution cites incidence and importance of screening
Decisions
•Resolution 22‑20‑26 adopted by voice vote (numeric tally not specified in transcript)
Directions
•Commissioners to share Headwaters contact information with constituents and consider referrals for potential projects
•County staff to support drop‑off sites on Oct. 24
Weekly Jefferson County road department meeting on Sept. 22, 2026 focused on fall grading rotations, localized road damage from recent storms, speed-study results on McLeod Creek and Sawmill Road, a recovered 2000-era road database, staffing plans for winter, and a draft mass-notification SOP.
Discussion Points
•County attorney reviewed notification SOP; staff corrected a grammatical error; circulation to commissioners proposed.
•Current crew numbers (4to5) and review of roughly five job applications; possibilities for temporary hires (Ron Hauser, retiring railroad worker).
•Discovery of a 19992000 Access database with layered maps and references to commission minutes/2002 resolution.
•Exploring mass-notification options (email rosters, radius text messaging).
•Fall grading rotation to address citizen requests; temporary winter stabilization on Whitehall and Hot Springs; permanent milling planned next spring.
•Speed-sign data comparisons between McLeod Creek and Sawmill Road; decision to display speeds to test behavioral change.
•Staff to analyze the database and GIS layers to inform current road-priority decisions.
Directions
•Barry to resend corrected SOP to commissioners and contact Ginger/Doug for notification tool options.
•Barry to work through the database as time allows and report back with findings.
•Deploy grader crews to finish Montana City then shift to Whitehall; follow up with Forest Service and BLM where right-of-way issues affect drainage work.
•Monitor speed-sign results and reassess placement and display mode.
•Proceed with applicant review and interview process as needed; consider temporary arrangements for early winter coverage.
Road crew report on staffing, CDL training plans and winter readiness; safety concerns about lack of cul-de-sacs/turnarounds on several subdivision roads; Spring Street traffic counts and sign relocations; a continuing cooperative road agreement; and discussion of a wash bay and backup power for the Montana City shop.
Discussion Points
•About 400 more cars counted on Spring Street week-over-week.
•Agreement provides reciprocal road assistance contingent on crew availability.
•Beaverhead Deer Lodge sent a Schedule 8 agreement that mirrors prior years' arrangement.
•Crew down to approximately four workers; one staffer gave two-week notice.
•Ditching and berm removal on Mlullen could improve drainage but deeper work may hit utilities and bedrock.
•Forest Service graded Warm Springs and Mlullen recently, prompting questions from landowners.
•Map shows multiple end-of-road areas lacking cul-de-sacs/turnarounds.
•Measured speeds showed few drivers exceeding the limit.
•Plan to use MDT theory training and Federal Highway behind-the-wheel instruction to certify drivers in-house.
•Plug-in meter with surge protector recommended for Montana City shop and Northwest Energy will install for free.
•Road widths of 12–13 ft in places and paved private driveways impede turning of county equipment.
•Tying wash bay into existing building substantially increases cost (waterproofing/drain needs).
Directions
•Leana to research historical road classification and ownership records; schedule follow-up meeting with affected homeowners and legal counsel.
•Obtain cost estimates for standalone wash bay; proceed with meter installation and schedule generator tests.
•Obtain locates for utilities and coordinate with utility owners; plan work seasonally based on manpower and weather.
•Provide copies of the agreement for review.
•Relocate a sign to Mloud and one to Saw to improve traffic counts and monitor speed changes.
•Set up trainers among existing drivers to conduct on-the-job behind-the-wheel training.
Jefferson County held a special emergency meeting on Sept. 3, 2026, and voted to rescind Stage 1 fire restrictions; the rescission becomes effective 12:01 a.m. on Sept. 4, 2026.
Discussion Points
•Board adopted the rescission and staff will notify partners.
•No amendments proposed; motion moved and seconded, voice vote recorded.
•Staff cited improved preparedness level (PL) and ERC metrics as justifications.
•Staff recommended rescinding Stage 1; commissioners discussed hunting season and coordination with local towns.
•Staff recommended rescinding Stage 1 while maintaining debris-burning closures for fires larger than 48 inches.
•Staff reported energy release components at or below the 80th percentile and noted regional preparedness level (PL) improved by one notch.
•Staff reported that federal and state partners followed the county into Stage 1 and indicated they would follow out of it.
Decisions
•Board approved rescission; partners to be notified.
•Rescind Resolution 17-2026 and lift Stage 1 fire restrictions effective 12:01 a.m. Sept. 4, 2026.
•Stage 1 rescinded; debris-burning closures for >48 in remain.
Directions
•Residents should take note of the effective time and continued closures for larger debris fires.
•Staff to distribute the adopted resolution to partner agencies.
•Staff to send the adopted resolution to partner agencies.