The Borough of Dunmore's November 11, 2026 meeting agenda included a proposed 2027 budget and tax ordinance (total 3.2 mills), an appointment to zoning officer, a proposed raise for part‑time police, financial and departmental reports, and routine procedural business.
Pension Board met to review and approve the Q2 2026 performance report from investment manager CS McKee; trustees heard a detailed presentation on market drivers, approved the report, and discussed directed brokerage arrangements and scheduling for December.
Discussion Points
•CS McKee presented Q2 2026 performance figures and market outlook; portfolio repositioning toward energy and value stocks; small-cap discovery strategy replacing passive ETFs.
•Current directed brokerage split 50% Wells Fargo / 50% RPC; manager asked whether to continue or switch to best execution.
•Procedural approval of minutes and formal approval of the Q2 2026 performance report.
Decisions
•Minutes approved; Q2 report approved as presented.
•No change adopted at this meeting.
•None (presentation only); later in meeting the board formally voted to approve the Q2 report (see separate article).
Directions
•Board asked staff/manager to check meeting availability for December and to follow up by email on directed brokerage preference.
•Manager to email board members to confirm availability and defer decision until full board can weigh in.
The Lackawanna County Board of Commissioners meeting on 2026-09-02 included proclamations (suicide prevention, La Festa Italiana, workforce development), multiple grant ratifications (election integrity, PCCD grants, multimodal transportation), appointments, contract awards and a lengthy public-comment period focused on property-tax reassessment and emerging data-center development in the county.
Discussion Points
•Bolzoni described Durkin\u0002s role during staffing turnover and his encyclopedic knowledge related to the CCI lawsuit.
•Commissioners answered that a 2024 court order required reassessment and described fiscal emergency conditions inherited in 2024.
•Commissioners discussed recent press reporting that developers and utilities secured options on thousands of acres and possible associated power-plant proposals.
•Commissioners highlighted La Festa\u0002s 50th anniversary and shuttle arrangements with RailFest.
•Commissioners praised efforts and discussed frequency of job-fair events.
•Commissioners said replacing his expertise on the lawsuit would be difficult and supported his continued involvement.
•Commissioners stressed that existing improvements remain taxable and that adoption is contingent on municipal and school-district approvals.
•Commissioners thanked staff and noted the fiscal relief grants provide.
•Developer described project scope: 15 apartments and 4 commercial spaces; property vacant since school closed in 2009.
•Joan Hodowan asked whether rental-assistance funds reach landlords; Durkin explained providers contract with landlords and county monitoring verifies payments.
•Mike Mancini presented municipal overlay packages tailored to 40 municipalities addressing siting, water, emissions and decommissioning.
•Organizers described the Vietnam Wall event logistics and museum educational programming.
•PA CareerLink described employer/training-provider participation and free online PA SkillUp offerings.
•Project funded by federal CDBG with no county general-fund impact; award conditional on required procurement documents.
•Project scope: ADA bathrooms, pathways and parking; bid amount $183,178.
•Residents reported large tax increases after reassessment, fear of tax sales and impacts on seniors.
•Staff described uses for each grant (elections, treatment court, transportation projects, victim services).
•Telespan added as a new provider this year for senior shelter and case-management services.
Decisions
•Agreements approved by voice vote.
•Board approved LERTA schedule by voice vote.
•Board ratified grants and applications by voice vote.
•Contract award approved by voice vote.
•Extension approved by voice vote.
•No change to reassessment adopted; commissioner defense of fiscal decisions recorded.
•No ordinance or formal land-use regulation adopted at this meeting.
•Proclamation adopted by voice vote.
•Proclamations adopted by voice vote.
Directions
•CFO and legal staff to continue to engage Durkin for litigation support as needed.
•Clerk/staff to follow up with residents who provided contact information and to provide information on eligibility for senior relief.
•Departments to implement grant activities and comply with reporting requirements.
•Economic Development to coordinate with city and school district and report back.
•Emergency-management director to accelerate the RFQ for an independent threat, vulnerability and emergency-response assessment.
•Event coordination with law enforcement and museum programming as necessary.
•Human Services to continue provider monitoring and report any noncompliance to commissioners.
•No immediate tax policy change adopted.
•PA CareerLink to host the Sept. 3 event and provide a post-event report.
•Procurement staff to verify bonds, insurance and federal labor documentation before contract execution.
•Staff to review Mancini\u0002s submitted municipal overlay packages and involve planning and solicitor offices.
Lackawanna County 2027 Preliminary Budget 10 15 26
Lackawanna County held a public hearing on its proposed 2027 preliminary operating budget, where the county CFO outlined a roughly $190 million budget, projected a $8.9 million opening deficit (reduced to about $3.97 million with adjustments and one-time revenues), and commissioners questioned long-term fiscal sustainability and assumptions about health-care refunds and stadium receivables.
Discussion Points
•Actuarial guidance and prior underfunding cited as reasons.
•CFO presented operating budget and deficit reductions using departmental adjustments and one-time revenues.
•Commissioners asked for documentation and longer-term forecasts including PFM analysis.
•County debt rating cited as one notch above speculative and a downgrade would be harmful.
•Fund balance policy limits use of reserves to cover deficits (12% referenced).
•Pension contribution increases of $1.5M annually through 2030 to approach $15M equilibrium.
•Projected 14.8% renewal for 2027 health insurance versus cooperative average near 10%.
•Stadium authority reimburses eligible expenses (roughly $500,000 annually) and a $1.5M receivable is anticipated to reduce the 2027 deficit.
•Timing and contractual details of the receivable were not fully provided at the hearing.
•Use of one-time health-surplus refunds as budget balancing tool; plan design changes under negotiation.
Decisions
•No decision to raise millage in the preliminary 2027 budget; public hearings scheduled.
Directions
•CFO to provide detailed line-item breakdowns of departmental adjustments and documentation of stadium receivable agreement and PFM reviews.
•Staff to avoid declaring use of fund balance in budget documents and work to improve fund balance position prior to rating reviews.
•Staff to provide documentation on health-surplus timing and estimated recurring savings from pharmacy/benefit changes.
•Staff to provide stadium authority agreement and payment schedule documentation.
The Lackawanna County Redevelopment Authority met for a brief rescheduled session on Sept. 16 to approve minutes and vouchers, hear a presentation from Executive Director Tom Carlucci about adopting a property-identification platform and exploring property acquisition and ground-leasing strategies, and discuss outreach and potential local business expansion tied to a Lockheed Martin project. The board moved and approved routine items and scheduled a December meeting.
Discussion Points
•Adopt an interdepartmental property-identification platform to find buildable county properties.
•Approval of minutes and vouchers by voice vote.
•Carlucci proposed using county grant communications to distribute the information.
•Consultant offered to draft a no‑cost outreach letter to explain financing options.
•Continue financing role while exploring ground leases and development agreements.
•Create a pipeline/portfolio of top candidate parcels (top 5–10) once platform adopted.
•Potential to clear title and avoid five-year inactivity rules.
•Reported potential Lockheed Martin expansion and a large projected investment and hiring.
•Scheduling of December meeting and request for staff follow-up on platform and land bank items.
•Staff to identify likely suppliers and workforce needs using NAICS codes and partner organizations.
•Whether land bank can buy at judicial sale via option agreement and convey to redevelopment authority.
Decisions
•Minutes and vouchers approved; meeting adjourned.
•No expenditure or formal approval required at this time
•No formal decision at meeting
•No formal vote to adopt platform during this meeting
•No incentives or approvals decided at the meeting
Directions
•Industrial development board and workforce partners to continue outreach and report findings.
•Staff/legal counsel to verify procedures and constraints for transfers between land bank and redevelopment authority.
•Staff to assemble and present a portfolio of candidate properties after platform adoption.
•Staff to coordinate platform implementation and legal review.
•Staff to coordinate with assessor, GIS, planning and recorder to implement platform.
•Staff to propose December meeting date.
•Staff to pursue distribution options and consider including the material with community reinvest grant communications.
The Lackawanna County Board of Commissioners met Oct. 21, 2026; they approved routine payables and grants, advanced a $15 million tax-and-revenue anticipation note (first reading), authorized participation in a regional youth detention center agreement, approved several community development grant actions, and heard public comment focused on the county budget, taxes and proposed data center developments.
Discussion Points
•A commissioner requested PFM review the preliminary 2027 budget and projections for 2028–29.
•Board asked no substantive questions and approved the resolution.
•Board recorded vote to ratify payments.
•CFO described mechanics, expected rates and arbitrage to lower net cost.
•Chair emphasized cost-sharing and programming to reduce recidivism; commissioners visited facility.
•Commissioner asked legal staff to review prior LERDA exemptions for potential rescission if project use changed from warehouse to data center.
•Commissioners approved the budget revision.
•Commissioners discussed procedural first-reading timing and scheduled second reading.
•Commissioner thanked staff and acknowledged volume of applications.
•Director explained eligible project types and that funds enable infrastructure and accessibility improvements.
•Human Services described program purpose and amount.
•Public commenters flagged rising healthcare and electricity costs and raised concern about tax burdens.
•Staff explained the reallocation amount and purpose.
•Staff outlined the citizen participation process and priority-setting for projects.
•Staff read list of sponsored organizations and projects.
•Staff read payables totals and check ranges.
•Staff read statutory basis and agreement terms.
Decisions
•Board approved resolution and authorized execution.
•Board authorized application submission.
•First reading recorded; no final adoption at this meeting.
•No formal votes taken on the matters at this meeting; direction given for staff follow-up.
•Resolution adopted.
•Resolution adopted as read.
Directions
•Chair or vice-chair to execute agreement; staff to finalize attachments.
•Human Services to finalize paperwork with state.
•PFM to provide comprehensive budget review; county solicitor to review LERDA approval and legal options.
•Proceed with approvals required to implement walkway project.
•Return ordinance for second reading on Nov. 4, 2026.
•Staff to prepare required materials and submit application to state.
A public ceremony in Lackawanna County commemorated the 25th anniversary of the Sept. 11 attacks with student readings, flag presentations, remarks from local officials and first responders, a reading of local names, a wreath ceremony and Taps.
Discussion Points
•Calls for civic service and preparedness by local officials
•Civil Air Patrol explained flag history
•Improvements in local emergency cooperation since 2001
Lackawanna County commissioners approved a $165,000 countywide cumulative air-quality and public-health study of proposed data centers and power plants, awarded multiple county contracts (including a $296,000 children's library facade job), and adopted a $1,035,107 state homeland security grant agreement; public commenters urged stronger health protections and raised local allegations.
Discussion Points
•A commenter made unverified allegations about a named individual and company; the chair stopped the remarks and requested identification.
•Adopt-an-Angel MOU operates at no county cost due to donations; PROSPER program renewal; foster-care and residential contracts and reimbursement rates (80% and 60%).
•Commissioner requested a public meeting and sent a formal letter with specific questions regarding use, acreage, studies and potential customers.
•Cracks and loose stones discovered above the library entrance; scaffolding has been in place since winter.
•Grant is annual and shared among 10 counties; funds training and shared resources; purchases require board approval.
•Need for countywide cumulative assessment rather than project-by-project review; potential health impacts and mapping of sensitive locations; independence and transparency of methods.
•Public bids received; D & M Construction was low bidder and their package was deemed compliant.
•Public reporting shows large-scale land acquisitions by PP&L and Blackstone; commissioner demanded parcel-level disclosure and studies.
•Residents thanked commissioners and described proximity to proposed plants; the study was framed as needed to produce objective, locality-specific evidence.
Decisions
•Commissioners noted public concerns and approved prior agenda items; no formal investigatory referral for allegations recorded.
•Contract awarded; motion approved.
•Contract awarded to Empower Analytics Group LLC for $165,000; motion approved.
•No formal decision by the board recorded; the commissioner publicly demanded answers.
•Resolution 26-0246 approved.
•Resolutions 26-0249 and 26-0250 approved.
Directions
•Accept grant and coordinate task force resource allocation through Emergency Management director.
•Award contract to D & M Construction; proceed with repairs and coordinate public access with the library.
•Contract Empower Analytics Group LLC pending solicitor review; consultants to disclose assumptions and methods for public scrutiny; final report expected in 90 days.
•County staff to publish the letter and monitor responses; request companies hold a public meeting in Lackawanna County.
•No formal county action on allegations recorded; commissioners reiterated study and transparency emphasis.
•Proceed with contract renewals and ensure providers are informed about state reimbursement levels.
Lackawanna County Prison Board met Oct. 21, 2026 to review financial and program reports, hear a warden's update on inmate population and a camera-system audit, approve routine motions, and hear a public question about the work-release program.
Discussion Points
•Board briefly questioned line-item purchases in the canteen expenses.
•Controller reported reconciliations matched bank statements and provided balances and investment maturities.
•Enrollment and revenue numbers for adult and juvenile house arrest.
•No roll-call recorded; decisions recorded as voice votes.
•Population and staffing levels, overtime and vacancies.
•Program completions, violations and an outstanding warrant were noted.
•Public asked if the work-release program announcement had been made; they said a judge expected an announcement.
•Routine motions to accept reports and approve payables.
•Two incidents requiring use of pepper-ball, OC spray and restraint chair.
•Vendor audit of camera system found minor issues and recommended replacement parts.
Decisions
•Accepted the controller's report by voice vote.
•Accepted the report by voice vote.
•Accepted the warden's report by voice vote.
•All motions recorded in transcript accepted by voice vote.
•No formal action taken; follow-up scheduled for next meeting.
Directions
•Board committed to providing an update at the next meeting; judge may address the item.
•None beyond routine acceptance.
•Ordered parts to be installed; follow-up reporting expected from Warden's Office.
•Staff to follow up on camera parts installation and to provide a work-release update at next meeting.
The Lackawanna County Prison Board met Sept. 16, 2026. The board approved minutes and payables, heard routine financial and program reports (controller, community corrections, jail population/staffing), received public comment on jail services and volunteer programs, and moved into an executive session on personnel.
Discussion Points
•Controller reviewed reconciliations and balances; noted investments and canteen expenditures.
•How detoxed inmates are followed medically; whether induction to medications for opiate withdrawal is provided.
•Personnel matters noted for potential executive session.
•Population, staffing, and incident reports presented.
•Program participation and financial metrics presented.
•Request for outside health survey, improvements to food and vision services, and revival of volunteer programs.
•Routine approvals of minutes, payables, and reports in open session.
•Union concerns about door lock, privacy glass, single-man posts, camera glitches, and classification committee changes.
Decisions
•Board acknowledged comments and said it will meet with report authors and aim for a presentation by the next meeting.
•Community corrections report accepted by voice vote.
Dunmore Borough Council met Oct. 12, 2026. Council approved routine minutes and bills, appointed two full‑time firefighters and a temporary DPW laborer, approved a $202,604 CDBG application, heard police and fire reports, and fielded extended public comment about a garbage-billing change, a $338,000 community-center deficit, fire staffing and mutual-aid coverage, and Section 8 housing and zoning concerns.
Discussion Points
•Chief Monahan presented call statistics and staffing updates.
•Council approved authorization to submit the application.
•Council confirmed civil‑service ranking and background checks for hires.
•Council emphasized enforcement by zoning and the need to research past measures.
•Council highlighted the center's many programs and said it will review revenues, fees and grant options.
The Lackawanna County Board of Elections convened Oct. 5, 2026, approved prior minutes, heard a public question about a temporary polling-place move in Carbondale, appointed a chair and vice chair, adopted Robert's Rules for meetings, authorized poll workers to work outside their voting districts for the Nov. 3, 2026 election, approved a temporary relocation of a Carbondale polling place for accessibility, and then adjourned.
Discussion Points
•Board sought to standardize meeting procedures.
•Minutes waived and adopted.
•Motions to appoint new chair and vice chair were made and approved by voice vote.
•Need to staff 163 precincts; vacancies sometimes require recruiting trained workers from other districts.
•No additional public comment.
•Public question on how a temporary relocation becomes permanent; Director Hopkins explained a county-wide comprehensive plan for Carbondale.
Decisions
•Adopt Robert's Rules of Order for future board meetings.
•Authorization approved for Nov. 3, 2026.
•Judge Mike Bridal appointed chair; Judge R. G. Visignani Moyo appointed vice chair.
•Minutes adopted; meeting adjourned.
•Temporary relocation of Carbondale polling place approved for Nov. 3, 2026; poll workers authorized to work outside their voting districts.
Directions
•Elections office may assign trained poll workers to precincts with vacancies; such assignments require board approval when outside districts.
•Staff to complete comprehensive polling-place plan for Carbondale before making permanent relocations.
The Lackawanna County Board of Commissioners met Oct. 7, 2026, to approve routine payables and contracts, award grants and contracts (including a county salary study), ratify a railroad reimbursement agreement, and hear public comments on community events, data centers and local environmental concerns. Commissioners also announced that the Commonwealth lifted a settlement agreement overseeing the county's Office of Youth and Family Services after the county met required corrections.
Discussion Points
•Arnon alleged environmental contamination and enforcement difficulties and said he would contact DEP.
•Butts stated the grant period and dollar amount and that it covers four officer salaries.
•Clerk read check ranges and totals for general fund and electronic transfers.
•Commissioner described the agency's recovery from revoked license to full license and the elimination of a large case backlog.
•Commissioners discussed workforce retention, salary compression, and need for implementation scenarios.
•Hodowan praised the Vietnam Wall replica and criticized data centers' potential utility and environmental impacts.
•HR director described scope of study, outcomes and DCED grant funding.
•Jennifer summarized extension programs and partnerships.
•Officials recognized remaining vacancies, turnover and caseload pressures despite progress.
•Staff confirmed audited $10,000 deposit for a library speaker and noted a possible additional $10,000 payment.
•Staff confirmed no additional county cost.
Decisions
•Engage Baker Tilly; proceed under DCED grant with no immediate county cost.
•Resolution 26-0256 approved.
•Resolution 26-0270 adopted by voice vote.
Directions
•Accept grant and fund four positions through grant period.
•Continue county oversight of the Office of Youth and Family Services.
•Deliver final report and presentation after study completion.
•Department to confirm final speaker cost and report back.
•HR to execute engagement and coordinate with Baker Tilly and PFM.
•No new funding action recorded at meeting.
•Speakers were asked to leave contact information for county follow-up where appropriate.
•Staff to notify county HR/finance to process grant acceptance.
Dunmore Borough Council met Sept. 14, 2026, approving routine minutes and bills, appointing Martin F. Monahan as police chief, adopting a county hazard vulnerability assessment, approving several personnel items and hearing extensive public comment on pedestrian safety, refuse fees and fire-department staffing.
Discussion Points
•Burton summarized revenue sources and major expenses including a $1 million bond payment and $83,000 of debt interest.
•Chief Barth reported calls for service, staffing shortages, parking revenue and battery replacements for meters.
•Manager noted the prior contractor parted ways and Einholf offered to provide inspections to avoid service interruptions.
•Mayor Conway outlined Monahan's experience and a letter of endorsement from the District Attorney.
•Resident presented photos and expressed safety concerns about a split tree and rodents due to overgrowth.
•Resident reported damaged sign and two near-injuries and urged enforcement and engineering fixes.
•Residents expressed surprise and frustration at invoice timing; council members explained the procedural history and lack of stenographer at the second meeting.
•Speakers read overtime totals and argued hiring full-time firefighters would reduce overtime and improve safety.
•Wolff explained that multiple municipalities in Lackawanna County signed on to a single assessment rather than producing separate municipal plans.
Decisions
•Appoint Martin F. Monahan as Police Chief, motion approved by unanimous voice vote.
•Einholf approved to perform health inspections.
•Resolution 6 of 2026 adopted to align Dunmore with the county hazard mitigation plan.
Directions
•Manager asked resident to provide contact information; council recommended follow-up with code enforcement and possible fines/magistrate action.
•Manager said certified Civil Service list received and interviews planned.
•Manager suggested following up with PennDOT or similar agencies for engineering solutions and advised residents to bring details to the borough office.
•Residents should consult borough minutes and records or contact staff to resolve billing questions.
•Residents with billing questions should consult the borough office for records.
The Lackawanna County Prison Board met Aug. 19, 2026 to approve minutes and payables, hear financial reports on inmate and canteen accounts and community corrections program statistics, review population and staffing/incident reports, approve three correctional officer hires, hear a public comment requesting more tablets, TVs and newspapers for women in Bravo unit, then moved into an executive session about personnel termination and adjourned.
Discussion Points
•Clarification that not every behavioral watch equals an extraordinary occurrence report.
•Controller presented account balances, investments, and canteen disbursements.
•Motion to enter executive session for personnel termination recorded.
•Population counts and staffing leaves; five extraordinary occurrences described; incidents involving emergency restraint chair and OC spray.
•Program totals, revenues, expenses and outcomes were presented.
•Requests to replace a broken TV in Bravo block L or M, to add Philadelphia Inquirer subscriptions and to increase tablets available to women in Bravo unit using commissary funds or GTL coordination.
Decisions
•Approve three recommended correctional officer hires.
Board of Commissioners meeting on 2026-08-19: commissioners approved payables and several contracts, authorized a land acquisition related to a Wawa project, awarded a prison roof contract, and heard public calls for a countywide health-impact study of proposed data centers and concerns about a county property reassessment.
Discussion Points
•A commissioner asked a separate drainage/culvert question that Suma said would be checked.
•Clerk read totals for payables.
•Commissioner proposed countywide health impact study and presented a $165,000 proposal sourced from outside scientists.
•Controller confirmed amounts had been audited and approved.
•County attorney emphasized this does not pledge county credit.
•Director summarized types of services and state-reimbursement rates (60–80%).
•Engineer described scope: remaining roof over administrative and front-office buildings; bidder history noted.
•He provided dollar estimates and urged immediate action.
•Mancini said reassessment identified 2,767 parcels with issues and proposed a parcel-by-parcel review to quantify lost revenue.
•Provider names listed in resolution reading.
•Public commenters urged immediate action and cited community health, air quality and property concerns.
•Resolution enables Redevelopment Authority to issue tax-exempt revenue notes not to exceed $3,750,000 for YMCA renovations.
•Resolution requests authorization to acquire 7,026 sq ft for a turning lane to support a proposed Wawa.
•Solicitor said Dixon City received a $1.2M grant and $390,000 will be allocated as damages to the executive park; county expects no cost.
•Tires are excluded and will be collected separately; Goodwill recommended for certain electronics.
•Vendor MXI has been county vendor for multiple years; event logistics and eligible items discussed.
Decisions
•Agreement with MXI approved by voice vote.
•Contract awarded to Dunmore Roofing at $252,607.
•No contract awarded at this meeting; RFQ under review.
•No formal county recovery plan adopted at this meeting.
•Resolution 26-0221 approved by voice vote.
•Resolution 26-025 approved by voice vote.
•Resolution approved; solicitor authorized to proceed with deed in lieu or condemnation actions.
•Resolutions 26-0223 and 26-0224 approved by voice vote.
Directions
•Chair encouraged residents to file for hearings with the assessor's office.
•Facilities staff to coordinate contract award and scheduling.
•Solicitor and engineering staff to confirm culvert and drainage reviews with Dixon City and project engineers.
•Staff to open preregistration on Sept. 1 and post details on county website.
•Staff to review RFQ responses for the health study.
Dunmore Borough Council held a public meeting on Aug. 10, 2026 where officials explained the reinstatement of a $150 refuse fee for 2026, answered budget questions, heard a presentation from a nonprofit about Project Lifesaver and took public comment, and ratified a clerical union contract.
Discussion Points
•Council noted cooperation with union representatives and clerk staff load during the refuse fee rollout.
•Erin's Way proposed Dunmore as a pilot that would create a model for 39 additional municipalities in the county.
•July net loss and YTD figures; revenue composition (refuse fees, surplus distributions, rebates); expense items including equipment, paving and insurance installments.
•Manager Wolff described ordinance history and budget pressures; residents questioned statutory mailing requirements, installment options and how landfill/host revenues were spent.
•Officials emphasized training for first responders and access to a secure international database for enrolled individuals.
•Officials said staff had to combine county rental and borough files before billing and that process delayed mailings.
•Residents alleged the borough failed to follow ordinance mailing deadlines and installment rules.
•Treasurer provided July loss and revenue detail that councilors used to justify the need for new revenue sources.
Decisions
•Contract ratified; effective Jan. 6, 2026 through Dec. 31, 2028.
•Dunmore to remain lead agency for pilot pending county approval.
•No rescission of the fee; staff will handle billing disputes case by case.
•No vote taken tonight on altering the refuse fee; council affirmed the fee had been reinstated by default after no waiver motion on Dec. 8, 2025.
•Use presentation data as justification for exploring new revenue sources including the refuse fee.
Directions
•Borough clerk to accept affidavit submissions for vacancy or change of rental status; staff to publish billing methodology online and clarify installment options with Berkheimer.
•Borough will publish the presentation and financial backup online; staff to process billing disputes and accept affidavits for vacant units; explore hardship/installment options.
•Council to continue discussions with Keystone Landfill about potential renegotiation and revenue-sharing.
•Erin's Way to finalize county proposal and await county decision by the end of the month; borough to support training and serve as pilot site.
•HR and clerk to finalize execution and implement payroll changes.
•Publish financial slides and backup online; accept public requests for breakdowns of specific line items.
Lackawanna County Board of Commissioners held a regular meeting with routine approvals and multiple resolutions, debated a temporary airport board appointment, approved several contracts and grants, and heard extended public comment including urgent concerns about proposed hyperscale data centers and health impacts.
Discussion Points
•Commissioner described screening results (asthma cases, premature deaths, public health damages) and urged countywide cumulative assessment.
•Commissioners emphasized that projects are grant‑funded rather than paid from local tax dollars.
•Commissioners expressed appreciation for the program's services to children, adults and veterans.
•Commissioners praised the project as an investment in county recreation and tourism.
•Concern about cumulative impacts of multiple data centers and generators, including noise and fuel storage.
•HR explained RFQ process and reasons for selecting Cummins; current consultant did not respond to RFQ.
•Minority commissioner argued recusal does not create a vacancy and requested written legal opinions on authority and conflicts.
•Presenters described trail routing, park accessibility and road reconstruction scope and funding.
•Solicitor reported prior letter found a vacancy and recommended filling the seat.
•Staff and commissioners discussed funding and next steps.
•Staff noted Van Dusen's experience and sole past responses to RFQs.
•Staff presented project scope, ADA upgrades and funding source.
•Staff said Cummins is cost‑effective and owns county benefits portal, easing transition.
•Supporters argued the appointment preserves equal county representation and preparation for potential emergencies.
Decisions
•Contract award to Woodcock Construction approved.
•Grant submissions and contract awards ratified by motions.
•No formal study approved at meeting; consensus to pursue proposals and funding.
•One‑year ethics exemption granted.
•Temporary appointment of James Christopher Munley approved.
•Three‑year agreement awarded to Cummins Insurance.
Directions
•Board to explore funding options and coordination with state agencies.
•Chair reintroduced motion and secured approval.
•Commissioner to solicit formal proposal from Dr. Cork's team for a countywide study.
•HR to execute contract and coordinate transition for open enrollment.
•If awarded, department staff to execute grant documents and confirm construction schedules.
•Office of Youth and Family Services to continue annual RFQ/RFP process for the STABLE contract.
•Schedule park closure for demolition and confirm construction timeline.
•Solicitor to provide or identify written legal analysis (prior letter cited).
Lackawanna County Prison Board convened July 15, 2026, heard financial and operational reports, approved an investment renewal and the purchase of three laptops for inmate discovery access, and returned from executive session with a recommendation to suspend one individual; several public commenters asked about training and dyslexia screening for inmates.
Discussion Points
•Commenters praised overtime savings and asked about dyslexia screening and training programs; staff identified OutReach as a potential provider.
•Comptroller reported balances and investment scheduling; members questioned canteen purchases and vendor bidding limits.
•Deputy warden described flash-drive handling and tracking; board asked about recordkeeping and security.
•June participation and finance figures presented; percent usages highlighted.
•Population counts and staffing shortages were detailed; two safety incidents in June were described.
Decisions
•Accepted community corrections report.
•Accepted comptroller's report; approved renewal of one investment account.
•Approved purchase of three laptops.
Directions
•Consultant final report on work release to be released and presented at next meeting.
•Staff to confirm vendor status and procurement process for canteen purchases before next meeting.
•Staff to follow up on dyslexia screening leads and on inmate news-subscription requests.
•Staff to obtain quotes and confirm storage/security specifications for laptops.
Dunmore Borough Council approved a DCED-sponsored ERP software grant resolution, contracted a grant-writing firm, and hired an actuarial vendor. The treasurer reported a $587,000 net loss in June but year-to-date income of $1.8 million. Police reported a spike in stolen vehicles and discussed e-bike rules, parking-meter battery procurement and vehicle camera options.
Discussion Points
•Burton reported June net loss and year-to-date totals and answered questions about the Tax Anticipation Note and an upcoming bond issue.
•Chief described increases in calls, detailed incident counts and a cluster of vehicle thefts in specific neighborhoods.
•Council approved by voice vote.
•Council discussed reducing tax burden by using grant funds.
•Council members asked for future updates regarding award percentage and next steps.
•Floor replacement nearly complete; summer program enrollment high.
•He proposed drafting an ordinance to regulate e-bikes and scooters and pursuing local battery suppliers and grant funding for camera packages.
•Manager explained DCED Phase 3 funding and modules included.
•Oven described Total Grant Services as a professional firm with municipal experience.
•Staff acknowledged volunteers' assistance.
•Wolff summarized vendor outreach and recommended CBIZ for pricing and service.
Decisions
•Contract awarded to CBIZ for pension actuarial services.
•Council approved contracting Total Grant Services pending review.
•Council approved Resolution Number 5 of 2026 to pursue ERP grant funding.
•No formal council financial actions recorded at the meeting beyond acceptance of the report.
•No formal ordinance or purchases approved at the meeting; council directed staff to explore options and report back.
Directions
•Chief to draft e-bike/scooter ordinance examples and to forward supplier and cost information to manager for procurement/grant exploration.
•Manager to return with grant award update in September.
•Staff to complete contract paperwork.
•Staff to forward contract to solicitor for review.
•Treasurer to pay Tax Anticipation Note when landfill fees arrive and proceed with bond issue preparations.