Meeting of the Herkimer County development corporation board covering a mission-statement reading, acceptance of minutes, budget/financial updates tied to grants, a reported repurposing grant with conflicting amounts, brownfield summit planning, developer interest in a school site, site cleanup and an adjournment; specific dates and formal vote tallies were not specified in the transcript.
Discussion Points
•Chair and staff reviewed budget; staff said some increases are tied to grants.
•Clean-up and encampment removal undertaken to prepare property.
•Developer interest expressed; site visit planned within 2 weeks.
•Presenter read the mission statement and linked it to redevelopment objectives.
•Staff announced receipt of a DOT repurposing award and discussed matching funds.
•Staff noted increased regional participation for the summit.
•Staff suggested transferring grant administration to the town to ease county management.
Herkimer County IDA Board Meeting - October 27, 2026
Herkimer County Industrial Development Agency (IDA) board held a regular meeting covering routine approvals, budget adoption, DRI small-project grant selections, engineering review for Project Mohawk, sales-tax extensions for two solar projects, brownfield/site cleanup proposals, and an executive session; no action was taken in executive session.
Discussion Points
•Board entered executive session and later reconvened with no action taken.
•Both projects closed in 2023 and requested extensions due to construction delays.
•Chair announced three items to be discussed in executive session including pending litigation and agency requests.
•Delta's review covered site and building compliance and identified potential needs for parking and easement.
•Discussion about park entrance payment and whether it related to recent disbursement.
•Empire State Development urged considering conserving certain buildings; staff proposed a $30,000 study to scope feasibility and secure grants.
•Exploration of ground-based water tank on higher northern property could save money.
•Extensions address time only; total dollar amount of exemptions unchanged.
•Financial report shows projects moving ahead; awaiting grant paybacks.
•Potential partners include DEC and the county attorney; board discussed temporary county possession to enable cleanup and reuse.
•Property ('Lazaro') on Route 5 has contamination hot spots and has not been tested since 2016.
•Proposal to set aside ~$60,000 for a consultant to handle administrative duties and small procurement tasks.
•Staff presented four bids and two completed DRI applications (Johnson's Carpet, Dr. Mello).
•State procurement expectations require documented process; board agreed on a three-person selection committee.
•Study would cover asbestos abatement planning, structural analysis, and potential matching strategies with federal/state funds.
•Temporary easement for 200 feet to be constructed by developer at its expense and conveyed subject to conditions.
Decisions
•Board adopted six-year budget and accepted financial report.
•Board approved moving forward with consultant selection and DRI small-project awards process.
•Board approved time-only extensions through year-end.
•Board authorized payment to Delta and accepted the easement proposal.
•Board directed staff to investigate assessment and remediation options; no formal commitment to spend agency funds beyond study noted.
•Board set aside up to $30,000 to fund the feasibility study as a contingency to pursue preservation options.
•No action taken in executive session; meeting adjourned.
Directions
•No further direction recorded beyond returning to regular session and continuing follow-up on agenda items.
•Staff to coordinate environmental assessments using brownfield funds and consult with county attorney Lorraine Lee Wojcowski.
•Staff to document the new end dates and monitor completion milestones.
•Staff to investigate park entrance payment details and provide water-tank cost comparisons.
•Staff to prepare consultant scope and RFP and convene the three-person selection committee.
•Staff to record easement, coordinate town inspections, and finalize payment to Delta.
•Staff to scope the study, identify grant matches, and report back within a month.
Pacemaker Steel & Piping Co. - Public Hearing 10/16/2026
The Herkimer County Industrial Development Agency held a brief public hearing Oct. 16, 2026, on an application from Basemaker Steel and Piping Company seeking property, sales and mortgage tax incentives for a proposed 38,750+ sq. ft. metal service center in the town of Frankfort. The hearing record shows no public commenters and was adjourned after a short pause.
Discussion Points
•Agency read notice and summarized Basemaker Steel and Piping Company's application and project scope.
•Chair invited comments and allowed a brief pause for public speakers.
Decisions
•Hearing was adjourned; no further action recorded at this meeting.
•No formal vote or agency decision recorded at this hearing; the hearing was adjourned.
Directions
•Public instructed to submit written comments to the agency CEO.
•Written comments were invited and directed to the agency CEO.
Board meeting of a local development corporation in Herkimer County covered roll call, approval of minutes and financials, adoption of a budget item that includes $225,000 for property maintenance/roof work, an EPA brownfield grant and consultant for a Charles Town study, appointment of a treasurer, and updates on property transfers and cleanup funding.
Discussion Points
•Appointment motion; coordination needed to draw down post-storm recovery funds.
•Board will host brownfield summit; chips asset transferred to village of Frankfort; property sale ('Bill School') remains in progress.
•Confusion whether $225,000 was solely for roof work or for broader property maintenance; earlier roof estimate ~ $150,000.
•DEC labeled the site as a P site, which may permit state-led remediation but can be a multiyear process.
•EPA-selected consultant will manage the Charles Town capital-funding and cleanup study; grant ~ $150,000 noted.
•Members praised current treasurer's work and discussed working with the new mayor and village treasurer.
Decisions
•Adopt 2027 budget including the $225,000 LDC line
•Appointment approved
Directions
•Coordinate with Oneida County and schedule follow-up meetings with partners.
•Staff to coordinate drawdown and provide documentation to village officials.
•Staff to coordinate summit participation and monitor property sale progress.
•Staff to provide a detailed breakdown of the LDC budget line and report back.
Herkimer County IDA Board Meeting - September 23, 2026
Herkimer County IDA board reviewed project cost-benefit tools and upcoming projects, approved routine minutes, discussed a troubled HCR grant that will go to RFP for a consultant, heard updates on sewer and water-tower bids, examined property and development opportunities, and elected Ann as treasurer.
Discussion Points
•Add fillable/uploadable forms for grant and microenterprise applications
•Conflicting HCR guidance on committee composition and scoring rubrics
•Easement transfer needed to market 3.2‑acre parcel at Scatter Business Park
•How MRB Group cost‑benefit output standardizes incentive estimates and reporting
•Mohawk homestead appraisal and legal follow‑up due to owner incarceration
•Preserve historical emails and migrate database to Zoho
•Sewer study reduced pump counts; continued grant pursuit
•Staff time burden to administer grant without consultant
•Treasurer duties: signing agreements and financial review
•Use of applicant‑provided numbers for incentive calculation
•Village moratorium proposal limiting power to two megawatts could exclude large users
•Water‑tower bids far exceed engineering estimate
Decisions
•Ann elected treasurer by voice vote
•Begin database migration work in December (timeline provided by staff)
•Issue RFP approved by board consensus
Directions
•Ann to assume treasurer responsibilities
•Engage village officials to clarify power constraints and timing
•Issue RFP to procure consultant support funded, at least in part, by grant administrative funds
•Pursue additional funding, meet with water authority, explore alternative designs
•Schedule board preview of website before public launch
•Staff will continue to verify applicant inputs during inducement review
•Staff will pursue easement transfer and attorney follow‑up on Mohawk property
The Herkimer County Industrial Development Agency reviewed its 2027 budget (no changes reported), discussed a corrected funding request for Neli partners, set two staff training dates with MRD Group in October, and moved to adjourn. Several motions were proposed but the transcript does not record vote outcomes.
Discussion Points
•Members asked to confirm availability; contingencies include rescheduling or splitting sessions.
•Personnel changes will be discussed in a separate technical session rather than on the public agenda.
•Staff acknowledged a $700 omission in a prior figure for Neli partners and said the agency would increase the request and apply for 75% funding.
•Staff explained revenue shortfalls arise when anticipated projects do not close and administration fees fall short.
•Two trainings scheduled with MRD Group on Oct. 6 and Oct. 21.
Decisions
•No formal approval recorded in transcript
•No formal decision on contingencies recorded
•No recorded formal decision or vote on Item 4 in the transcript
Directions
•Personnel items to be addressed in a technical session (no procedural detail provided).
Herkimer County IDA and HLDC Board Meeting - August 25, 2026
Herkimer County IDA board met to review routine minutes and financials, hear multiple staff updates (marketing, website, grant outreach), consider a $7,000 contract for a strategic-plan consultant, discuss several development projects (Project Mohawk, a $4,000,000 water tank, Skyler business park work), and set a public hearing for a Pacemaker Steel financial-assistance application.
Discussion Points
•Board agreed detailed personnel discussion could be deferred to a later session.
•Board discussed email bounce cleanup and the website prototype timing.
•Board informed of a planned $4,000,000 glass-lined water tank to be turned over to the Mohawk Valley Water Authority.
•Chair requested DOT's formal requirements and suggested executive-session counsel if needed.
•Consultant fee of $7,000 and contractual commitment regardless of attendance.
•DOT will not activate a full signal at the park entrance, citing traffic counts; board members dispute the rationale given safety and investment.
•Potential National Grid contribution (estimated 25–50%).
•Presenter gave platform-by-platform analytics and noted outreach results tied to a grant opportunity.
•Schedule and format for multi-session strategic-plan process; whether to include public/stakeholder sessions.
•Scope of feasibility study for cold storage sites and consultant engagement.
•Staff flagged personnel line items in the draft 2027 budget and offered to answer member questions.
•Staff recommended receiving 50% of the fee before proceeding.
•Staff tied the infrastructure investment to Project Mohawk and potential water-service extension.
•Whether Pacemaker Steel had closed on the property; whether to require a deposit before scheduling a hearing.
Decisions
•Board approved moving forward with the study (not to exceed stated amounts in packet).
•Engage consultant for $7,000 and plan sessions (scheduling in October suggested).
•Public hearing set with date to be announced after staff conditions met.
Directions
•Decisions on bidding and timing to follow technical review.
•Finalize website prototype and continue email/campaign outreach.
•Staff to circulate proposed sessions dates and finalize consultant contract.
•Staff to continue civil drawing review and coordinate with the water authority.
•Staff to proceed with the feasibility study and pursue National Grid funding to offset costs.
•Staff to provide line-item clarifications on personnel and attorney-fee increases before the next budget vote.
•Staff to request DOT formal requirements and supporting traffic counts; consider legal counsel and reimbursement options.
•Staff to require 50% of fee up front and confirm property closing or outstanding items before scheduling hearing.
Herkimer County IDA discussed strategic-planning consulting, marketing and website redesign, a large portfolio of active grants (totaling about $26 million), DRI small-project outreach, a study of cold-storage/site marketing, several project approvals including a mortgage/loan ratification and a land sale, then moved to an executive session.
Discussion Points
•Board emphasized accessibility (WCAG 2.2) and analytics tracking.
•Board members expressed concern about the six‑hour time commitment and membership availability.
•Initial quotes discussed; staff expects to tighten scope and cost.
•Leaseback authorized earlier permitted mortgage financing for Turbo Machine; current action ratifies that financing.
•Marketing presentation showed recent engagement and reasons for a site rebuild.
•MRB Group proposed two 3‑hour workshops to build a SOAR‑based strategic plan and deliver a final report with infographics.
•NEPA and procurement steps needed before spending on EPA award; DOH review for water-tank materials.
•Overview of each active grant and its current status; closeout requirements for completed grants.
•Parcel sale to holding company discussed with reference to prior pricing and site conditions.
•Program maximum funding is $600,000.
•Regional shortage of rentable freezer/cooler space identified; study would market county sites to potential tenants.
•Walkabout reached multiple small businesses and prompted follow ups.
Decisions
•Authorized the study up to $40,000.
•Authorized website rebuild with cap; staff to return if costs exceed authorization.
•Board ratified authorizations and approved the parcel transfer subject to follow‑up documentation.
•Board received and accepted the grants update.
•No contract approved at this meeting; item to return for further consideration.
•No funding awards decided at this meeting; outreach continues.
Directions
•Consultant to provide detailed workshop agenda and participant list.
•Proceed under not‑to‑exceed $10,000 authorization.
•Proceed with procurement steps after required reviews are completed.
•Proceed with study under a not‑to‑exceed $40,000 cap; staff to refine scope and circulate final proposal.
•Staff to continue outreach and assist applicants.
•Staff to incorporate accessibility and analytics requirements into contract.
•Staff to prepare and circulate financing and sale documents for formal resolution and closing.
•Staff to return with clarified schedule, cost and an optional dashboard deliverable.
•Staff to submit final documentation for reimbursements and to request notices to proceed where applicable.
A Herkimer County Local Development Corporation meeting covering routine approvals, a marketing update including a campus visit and awards, property redevelopment proposals for Main Street, a discussion of an EPA-led cleanup in Charlestown estimated near $6 million, and facility maintenance needs including a potential roof replacement.
Discussion Points
•Concept: first-floor retail and two floors of housing with rear parking; explore grant funding and developers.
•Contractor estimate for full roof replacement at approximately $150,000.
•Estimate of approximately $4,045,000 to carry the Article 19-b work and associated preparation.
•Estimate of approximately $6,000,000 for cleanup work.
•Minutes of June 30 were presented and approved by voice vote.
•Options like pitch/trusses and historic tax credits were discussed.
•Orders for acrylic photo-block awards for Brownfield Summit poster winners; delivery planned for August.
•Report of call with EPA on Charlestown site.
•Use Article 19-b to clear and transfer several Main Street properties to the LDC LLC.
•Visit by NJIT and county community college team; site walkthroughs and photos.
Decisions
•minutes_approved
Directions
•Continue coordination with EPA and pursue remediation steps.
•Staff to continue work with the village and pursue grant opportunities.
•Staff to deliver awards and post photos on social media.
Herkimer County Industrial Development Agency board reviewed financials, marketing metrics and multiple grant awards (Northern Borders and EPA), discussed business park developments and water infrastructure easements/water tank delays, approved several routine motions, and entered executive session.
Discussion Points
•Board noted payoff of Skylar Business Park mortgage and progress on land closings.
•Executive session convened for negotiation/legal advice; no votes occurred in closed session.
•Routine approvals explained and voted.
•Staff clarified a QuickBooks accounting artifact before financials vote.
•Staff described outreach and BOA public engagement events used to solicit community input on reuse opportunities.
•Staff summarized Northern Borders and EPA awards and described plans for assessment and redevelopment.
•The State Department of Health requested expanded mapping for a water tank, lengthening the permitting timeline despite available grant funds.
•Three of four required easements for the Mahheim water line have been secured; the fourth remains under state legal review.
Decisions
•Approvals and resolutions were carried as announced in the meeting record.
Directions
•Staff to continue grant administration and developer outreach; report back on project agreements and site plans.
•Staff to continue to engage state attorneys and the Department of Health and update the board when the remaining easement is signed and when comments on the water-tank permit are resolved.
•Staff to file approved minutes and resolutions and continue implementation tasks.
Local development corporation meeting focused on brownfield remediation and redevelopment opportunities, including technical cleanup options, potential tax-credit financing and interest from data-center developers; board approved minutes and heard project updates.
Discussion Points
•HRP presented remediation options (excavation, in-situ thermal, chemical amendment) and cost ranges ($3M–$10M)
•Marketability discussion: 185 megawatts of available power makes data centers a potential, but grid upgrades are costly
•Remington site entered into state tax-credit program and subdivided to increase credits
•Site-specific findings: hot spot of chlorinated solvent at Charles Town Mall; metals contamination addressed by capping or removal
Decisions
•Approval of 2019 minutes and financials
•No vote taken to accept ownership of contaminated sites; staff will not ask county to take title
Directions
•Maintain options for remediation approaches and identify funding sources (EPA, DEC, revolving loan funds)
•Staff to continue seeking state and federal grants and pursue purchaser agreements or legal protections to limit liability
The Herkimer County Industrial Development Agency met to read its mission and approve two solar project applications, authorize a related funding/authorization item, schedule a public hearing, and hear public comment urging local control over energy allocation policy.
Discussion Points
•Cosby Manor Solar One described as ~3.25 MW, ~14 acres, ~$5M and approved.
•KD Energy representative described a proposed state bill 'power to the people' to assert home-rule over energy allocations.
•Mission statement was read to emphasize IDA support for environmental and green-energy projects.
•Passer Solar Two described as ~4.25 MW, ~18 acres, ~$6.6M; board moved it forward and set public hearing.
•Speaker said they will forward materials to the agency and seek legislative sponsors.
•Staff/attorneys will work with town on review and decommissioning clauses; host-community benefits negotiated separately.
•Total sharing authorization item approved.
Decisions
•Adjournment of the meeting.
•Approval of Cosby Manor Solar One application.
•Approval of 'total sharing authorization.'
•Motion to move Passer Solar Two forward and to set a public hearing.
•No formal agency decision recorded in the transcript.
Directions
•Agency staff and counsel to review project documentation and decommissioning clauses; prepare hearing notice for Passer Solar Two.
•KD Energy to provide materials to agency members.
Herkimer County Local Development Corporation meeting covered approval of minutes and financials, a marketing update including a Brownfields Developer Summit recap, and a detailed update on contamination and redevelopment options for a parcel referred to as “Charles Town.”
Discussion Points
•Board approved minutes and financials by voice vote.
•Board members discussed potential responsible parties (Savage Arms, Sperry Univac) but did not assign liability.
•Presenter reported testing showing very high levels of chlorinated solvents at the Charles Town parcel and discussed possible remediation approaches and liability questions.
•Sam presented photos and recapped event attendance and program highlights, including an MIT keynote and outreach activities.
•Staff discussed acquisition strategy for a small lot and potential annexation to secure IDA benefits.
•Staff flagged the need for better financial accountability and possible nonprofit management if the event expands regionally.
•Staff recommended pursuing EPA and DEC funding and additional characterization before committing LDC funds.
•Staff reported developer interest including a hotel developer return visit planned for July.
Decisions
•Minutes and financials approved; no acquisition vote taken.
•No formal cleanup or acquisition decision made; minutes and financials approved by voice vote.
Directions
•Staff directed to pursue grant opportunities and additional testing and characterization and to continue coordination with DEC and EPA.
•Staff to debrief in two weeks and evaluate proposal for nonprofit management of the summit.
•Staff to return with acquisition/annexation recommendations and continue developer outreach.
Herkimer County Industrial Development Agency (IDA) regular meeting covering consent items, a final microenterprise grant report, marketing metrics, sponsorship requests for a July 1 celebration, infrastructure updates at Sky Business Park (including a withdrawn EFC grant), and several project authorizations.
Discussion Points
•Board discussed marketing success and community engagement related to the awards.
•Board discussed the need to establish a lead applicant and intermunicipal agreement to preserve grant eligibility and to consider future EFC rounds.
•DOT, National Grid and town responsibilities for the traffic signal and electricity/maintenance costs.
•EFC notice and project-team message indicate withdrawal due to lack of lead applicant.
•Sponsorship levels for the July 1 event and prior IDA community contributions.
•Staff reported completing required drawdowns and documentation for the microenterprise round and listed award recipients and jobs created.
Decisions
•Board accepted the final report; no further funding decisions made at the meeting.
•Board approved a rebid authorization (not-to-exceed $7,600); EFC grant withdrawal was noted and no reallocation was approved.
•Board approved the sponsorship, authorized the DOT pass-through payment, and agreed to pay approximately one-third of the road repair estimate.
Directions
•Staff to conduct internal review on timing for next grant application and report back.
•Staff to confirm lead applicant and documentation before reapplying to EFC.
•Staff to document sponsorship level and communicate to event organizers.
•Staff to issue pass-through DOT check and process IDA cost-share for road repairs.
•Staff to pursue rebid for the water tank under a not-to-exceed authorization and to coordinate with Department of Health.
Herkimer County IDA Board Meeting - April 28, 2026
The Herkimer County Industrial Development Agency (IDA) held a regular meeting covering approval of minutes and financials, a presentation by Denali Partners on leadership and workforce pipeline programs, updates on DRI and Northern Border grants, a Skyler water tower application and Skyler sewer kickoff, an approved payment to National Grid for a traffic/light project, and a move into executive session.
Discussion Points
•Available funds up to $600,000 with tiered awards (top tier up to $150,000)
•Awardee had a car accident that delayed documentation
•Denali Partners described three program components and school partnerships
•DRI small project progress and HCR questions
•HCR rejected some items in the drawdown packet
•MWBE and veteran requirements apply
•National Grid required ~$12,212.25 to run line
•NRBC application for Skyler Water Tower ($1M) had to be withdrawn and will be reapplied for
•Presenter connected programming to regional employer needs and state education changes
At a meeting of the Herkimer County Local Development Corporation, members approved the March 31 minutes, heard a staff reading of the corporation mission, discussed possible chlorinated-solvent contamination and an old oil tank on a Charlestown property, and scheduled a developer tour of Bill's School. Staff said EPA and DDC funds may be available for remediation and that the board will have further conversation before taking the property.
Discussion Points
•Committee member noted potential EPA and DDC funding and said the board would further discuss remediation before accepting the property.
•Committee member reported chlorinated-solvent contamination and discovery of an old oil tank at a Charlestown property.
•Read mission statement and corporate purpose with Herkimer County IDA partnership.
•Reported filming at Bill's School and scheduled developer tour.
Decisions
•Approved minutes of March 31 by voice vote; meeting moved to closing and adjourned.
Directions
•Board to gather additional information and discuss contamination and funding eligibility before deciding whether to accept the Charlestown property.
Pacemaker Steel & Piping Co., Inc. - Public Hearing 4/17/2026
A Herkimer County Industrial Development Agency public hearing was held April 17, 2026, to review Pacemaker Steel and Piping Company Inc.'s application for sales- and mortgage-tax incentives for a proposed manufacturing facility; no members of the public spoke and the hearing closed at 9:11 a.m.
Discussion Points
•Chair read the agency’s published notice and described Pacemaker Steel and Piping Company Inc.'s application requesting sales- and mortgage-tax incentives for renovation and equipping of a manufacturing facility.
•The application and an analysis of costs and benefits are available for public inspection; written comments should be submitted to the CEO.
•The notice provided project location (232 Industrial Park Drive, Town of Frankfort), an estimated project cost of $17 million and a facility size rendered ambiguously in the transcript.
Decisions
•The Chair closed the public hearing at 9:11 a.m. after receiving no oral comments.
Directions
•Agency staff to make the transcript available to members and to review the application and costs-and-benefits analysis.
•Agency to accept written comments addressed to John J. Piseck Jr., Chief Executive Officer.
The Herkimer County Industrial Development Agency held a public hearing April 17, 2026, on an application from Stark Development LLC seeking sales- and mortgage-tax incentives for a proposed 6,000-square-foot warehouse at 171 Diamond Drive in the Town of Schuyler. No members of the public attended; the hearing opened, an appointment was made to record minutes, and the hearing was closed.
Discussion Points
•The hearing notice was read aloud, including publication date and location; the proposed assistance types (sales-tax and mortgage-tax incentives) were specified; the estimated project cost of $1,600,000 and facility size (6,000 sq ft, including 1,000 sq ft office) were stated.
Decisions
•Appointment of Victoria Adams to record minutes (appointment made verbally); no vote or final decision on incentives at this hearing.
Directions
•Agency staff to retain the application and cost-benefit analysis for review and prepare materials for a future agency meeting; written comments to be accepted by the CEO at the agency office.
Herkimer County IDA Board Meeting - March 31, 2026
The Herkimer County Industrial Development Agency held a regular board meeting that reviewed routine minutes and financials, approved several project applications and resolutions, and heard staff updates on grants, marketing and the upcoming Brownfield Developer Summit. Board members voted to ratify a sewer study contribution and to advance multiple project applications and inducement resolutions.
Discussion Points
•Board asked whether 'total capital invested' on project reports is the application amount or a rolling realized total; staff clarified it is a rolling, year‑over‑year figure for projects under construction more than one year (SEG 083–103).
•Board ratified the IDA’s one‑third share of a $73,000 sewer study (SEG 962–973).
•Multiple project applications and inducement resolutions (79 Riverside, Pacemaker Steel, Udica/Utica parcels, Skyler Business Park matters) were accepted for further action and voted on (SEG 1016–1100; SEG 1201–1220; SEG 1169–1191).
•Sam summarized metrics: Facebook ~4,797 views and 80 interactions; LinkedIn ~2,280 impressions and 70 interactions; newsletter to 3,942 contacts had a 30.8% open rate and 2.2% click rate (SEG 367–417; SEG 571–619).
•Staff briefed the board on marketing metrics and Brownfield Summit planning; the IDA provided $75,000 in support for an 'expertise' VR project to be showcased at the summit (SEG 367–545).
•Staff reported final disbursement for a microenterprise awardee and anticipated completing draws by April 13; a public hearing was scheduled for awardees (SEG 183–223).
•Staff said the IDA supported a VR 'expertise' project with $75,000 in seed funds and plans to feature it at the summit; staff expect repayback when other funds are received (SEG 532–543).
•Victoria reported a final disbursement to a microenterprise awardee and ongoing reimbursement draws to Timeless Salon (~$20,000) with an April 13 draw deadline; staff noted a public hearing for awardees the following day at 1:15 p.m. (SEG 183–223).
Decisions
•Annual affairs package approved (SEG 047–076).
•Application acceptances and inducement resolution steps for multiple projects approved (SEG 1016–1100; SEG 1169–1220).
•Contract extension authorized for up to two years following executive session (SEG 1461–1468).
•IDA contribution to $73,000 sewer study ratified (SEG 962–973).
•Minutes and financial reports accepted by voice vote (SEG 021–046).
•Proceed with event promotion and exhibition of the 'expertise' VR project at the Brownfield Developer Summit (SEG 501–545).
•Proceed with outreach and application acceptance for DRRI-funded small projects via IDA website QR code (SEG 296–315).
Directions
•Coordinate payments and invoice tracking for sewer study and report back to board (SEG 962–973).
•Marketing staff to add signup functions to the website, finalize poster contest judging guidelines and continue event promotion via QR code and email (SEG 421–429; SEG 806–815).
•Prepare inducement resolutions, closing materials and counsel reviews for accepted applications and coordinate with town planning and DEC where remediation is involved (SEG 1016–1100; SEG 1370–1396).
•Program staff to coordinate public hearing logistics for microenterprise awardees and finalize remaining grant draws by April 13 (SEG 221–223).
•Staff to complete grant draws and respond to CDBG/HCR questions and to proceed with public outreach for DRRI‑funded small projects (SEG 183–223; SEG 296–315).
Herkimer County Local Development Corporation board meeting: board approved routine minutes and reports, adopted a new mission statement, and received project updates including a potential annexation inquiry for a nearby Charleston property with contamination concerns; staff will investigate remediation costs and next steps.
Discussion Points
•Board members discussed property lines, access, and the relation to a nearby road right‑of‑way.
•Board reviewed and briefly discussed the new mission text.
•Board voted to adopt the mission statement by roll call.
•Director described the parcel and noted chlorinated solvent contamination in parts of the site.
•Director noted paperwork for a DRI and upcoming outreach events (EPA roundtable, developer summit).
•Staff read the mission aloud.
Decisions
•Adopted new mission statement (see motion).
Directions
•Staff to investigate contamination scope and remediation cost estimates and report back.